Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.

Slides:



Advertisements
Similar presentations
Investigation framework for L-band FCS EMC compatibility analysis
Advertisements

Direction générale de lAviation civile direction de la Technique et de lInnovation direction des services de la Navigation aérienne AGCFG meeting Brussels.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
CAAC ADS-B Implementation Introduction
Regional RAIM Prediction System – Progress Report
REQUIRED SURVEILLANCE PERFORMANCE (RSP) By: M. Paydar March 2007
Jointly Presented by Australia and Hong Kong, China
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
U.S. Plans for ADS-B Briefing for
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
United States of America (USA) Plans for ADS-B Briefing for Seminar on Implementation of Data Link and SATCOM Communications November 2003 Bangkok,
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
LSSIP Objective AOP04.1.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
Air Traffic Management
ASAS Dream or reality? ASAS TN Workshop April 2003 Presented by Thomas Fixy Manager Air Traffic Information Management.
ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
MMEL Study Group Meeting - March 2005 (Attachment E)_Proposed MMEL Policy for Mode S Kevin Hallworth – UK CAA.
CNS/ATM SG #42 ADS-B - CASCADE Presentation Material Cologne, 15 October 2008 Jörg Steinleitner, CASCADE Infrastructure WP Lead.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation sous-direction Etudes et Recherche appliquée direction des services.
ASAS TN Third Workshop, April 2004, Toulouse 1 ASAS Implementation in Avionics Pierre GAYRAUD Thales Avionics in collaboration with ACSS.
Applications from packages I to III
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
ADS-B Update As of 6 April 2015 EAA Chapter 1457.
EASA Airborne Separation Assistance Systems (ASAS) Certification
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
Prof. dr. sc. Ivan Markežić
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Direction de la Technique et de l’Innovation 23 Mars 2006 ASAS implementation the DSNA views ASAS TN 2 Worshop Session 4: Integrating ASAS in an evolving.
Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
Distance Measuring Equipment (DME)
Introduction The uses of a DME DME Equipment How DME work? Advantages of DME Disadvantages of DME.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
ASAS-GN Rome November 2008 Alex Wandels, CASCADE Programme Manager.
ADS-B Out, In and GNSS Requirements Update
Workshop on preparations for ANConf/12 − ASBU methodology
VDL 2 capacity simulations
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Chris Shaw, EUROCONTROL Experimental Centre
Regional RAIM Prediction System – Progress Report
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
EUROCONTROL SURVEILLANCE STRATEGY
Workshop on preparations for ANConf/12 − ASBU methodology
Diagram 1. Trig 1090ES ADS-B Out System
Safe Flight 21 and Capstone Weather Applications
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
VDL 2 capacity simulations
Capabilities of TIS-B for Supporting ASAS
QUICK GUIDE TO GETTING COMPLIANT
ASAS-TN2 5th Workshop Toulouse 17 September 2007 Jörg Steinleitner
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B Out Certification JAA CNS/ATM juin 2005 Patrick Souchu Présenté par

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation ADS-B out : Statement of issue ADS-B out : Broadcast of identification, position, altitude, velocity, Navigation integrity data by the aircraft –1090 ES technology –Used initially for radar-like surveillance service by ATC Part of ADS-B Package 1 application : ADS-B NRA, ADS-B ACC, ADS-B TMA, ADS-B APT, ADS-B ADD Ground stations are easy to install and much cheaper than radar ADS-B separation standard under definition by ICAO SASP –5 Nm separation already approved by Australia under specific conditions –Simple installation in the aircraft : transponder + GNSS receiver –Currently under implementation : Australia, US, France (La Réunion Island), CASCADE program in EUROCONTROL Stream 1 : Mediterranean project

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation ADS-B Installation Many aircraft are already fitted with ADS-B capabilities –Many Mode S transponders for Enhanced surveillance are capable of ADS-B –No certification of ADS-B data, only non interference considerations –Guidance material is needed Initial results from Toulouse validation trials –Excellent detection range (200 Nm, up to 250 Nm) –Various quality of aircraft installation NUC = 0 often observed Aberrant case observed –Eg NUC = 8 with impossible shift of transmitted position Specific cases will be analysed case by case –Increasing number of equipped aircraft Peak of 53 ADS-B aircraft at the same time detected by the ground station in Toulouse

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation Proposed guidance material Guidance for installation, certification and maintenance of ADS-B installation ADS-B system compliant with ED102/DO260 as a minimum –Identification of the aircraft –Barometric altitude shall be provided and geometric altitude may be provided –Position shall be provided with quality indicators NUC or NIC/NAC/SIL If NUC is provided, its value must correspond to HIL (Horizontal Integrity Limit) GNSS capability required for separation purpose (NUC >= 5) –Receiver compliant with TSO C129 (FDE + continuous RAIM 0,3 Nm) or TSO C145/C146 –Periodic update interval of at least 1 s

/06/2005 direction générale de l’Aviation civile direction des services de la Navigation aérienne direction de la Technique et de l’Innovation Conclusion 1st draft produced for this meeting It is urgent to clarify the airborne equipment situation It is suggested to foster the delivery of this paper to EASA –Comments are expected –Finalisation of this paper at next meeting