Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner.

Similar presentations


Presentation on theme: "Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner."— Presentation transcript:

1 Session 1: Progress and Status of Implementation and Standardisation CASCADE & RFG ASAS-TN2 5 th Workshop Toulouse 17 September 2007 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety of Air Navigation

2 Overview CASCADE Programme: Scope, Implementation Policy, Worldwide Co-ordination CASCADE Validation: Status: ADS-B out & ADS-B in, Pioneer Airlines, Monitoring Requirements Focus Group: Within CASCADE, Status, Planning Timeline: Standardisation, Certification, Rulemaking

3 CASCADE Programme

4 CASCADE Scope Ground Surveillance Applications (ADS-B-out) ADS-B Receiver In a non-radar environment In a radar environment On the airport surface Airborne Derived Data Airborne Surveillance Applications (ADS-B-in & TIS-B) Situational awareness on the surface Airborne situational awareness Visual separation on approach In Trail Procedure 2008 2011

5 The Bigger Picture 2015 IR based implementation in wider areas upgraded equipage voluntary implementation in pocket areas certified existing equipage

6 The ADS-B Implementation Policy

7 ADS-B in other Continents Worldwide Co-ordination

8 CASCADE Validation

9 First “ADS-B out” Implementation Sites LVNL (Netherlands) implements ADS-B NRA with WAM (2009 in N. Sea) LFV Sweden implements ADS-B NRA (2008, Kiruna) ADS-B RAD (2009, Ostgota) 7 ANSPs (CRISTAL MED:Cyprus, France, Greece, Italy, Malta, Portugal, Turkey) validate ADS-B NRA & RAD towards implementation decision by 2008 DFS has included ADS-B (and WAM) in its SUR Strategy Target date is 2015

10 ADS-B-in: Emerging implementation CRISTAL ATSAW (simulations of ATSA VSA, SURF, AIRB) to be completed in Oct 2007 CRISTAL ITP (simulations and trial in N. Atlantic) ongoing CRISTAL Germany (TIS-B feasibility for ATSAW) ongoing CRISTAL Sweden (ATSAW trials for GA) completed: Implementation by 2009 (Ostgota) Certification target date: 2009

11 ADS-B Implementation Roadmap 20072008200920102011 ADS-B-NRA Pre-ops ValidationImplementation ADS-B-RAD ATSAW-VSA ATSAW-ITP Initial ValidationPre-ops ValidationImplementation ADS-B-APT ADS-B-ADD ATSAW-AIRB ATSAW-SURF Initial ValidationPre-ops ValidationImplementation NRA: In Non-Radar Airspace RAD: In Radar Airspace VSA: Visual Separation on Approach ITP: In Trail Procedure APT or SURF: On the Airport Surface ADD: Aircraft Derived Data for ground tools AIRB: During flight operations

12 ADS-B Pioneer Airline Project Target: “ADS-B out” Certification 17 Airlines - 400 Aircraft – 500.000+ flights/year

13 Pioneer Airline Project Monitoring & Certification Airworthiness Approval Avionics Vendors Airframers Airlines CASCADE Avionics Design Statistical Evidence Possibly supporting means of compliance demonstration (in-flight statistics) Primary means of compliance demonstration (design assurance, tests)

14 Timeline D3: 1 st Pioneers Certified EASA AMC JAA NPAED-126EASA NPA NPA: Notice of Proposed Amendment AMC: Acceptable Means of Compliance Comments Deadline: 7 Sep 20062007 2008 DecJanFebMarAprMayJunJulAugSepOctNovDecJan D1: high-level fleet info D2: detailed fleet info Certification Application “ADS-B Certification Workshop” 21+22 Nov in Palma (hosted by Air Europa)

15 Requirements Focus Group

16 High-level RFG Planning Dec 06Apr 07Aug 07Dec 07Apr 08Aug 08Dec 08 Apr 09Aug 09 ADS-B-NRA (ED-126, DO-303) Enhanced ATS in Non-Radar Areas TBD: ASPA-S&M Enhanced Sequencing & Merging Operations (advanced as background task – feasibility check in Jan 08) ADS-B-ADD – Aircraft Derived Data for Ground Tools ADS-B-RAD ATSA-ITP ATSA-VSA ADS-B-RAD: Enhanced ATS in Radar Areas ATSA-ITP: In-trail Procedure in Oceanic Airspace ATSA-VSA: Enhanced Visual Separation on Approach ADS-B-APT ATSA-AIRB ATSA-SURF ATSA-APT: Airport Surface Surveillance ATSA-AIRB: Enhanced TSA During Flight Operations ATSA-SURF: Enhanced TSA on the Airport Surface

17 Application Status ADS-B-RAD, ATSA-VSA & ATSA-ITP OSEDs are “frozen”: Apart from ATSA-VSA “enhanced procedure” Assessments are concluding: Safety (incl. surveillance risk modelling), Performance & Interoperability SPR/INTEROP document Integration to commence Critical step to facilitate wider review Target dates for EUROCAE/RTCA approval: ATSA-ITP – April 2008 ATSA-VSA – April 2008 (tbc) ADS-B-RAD – July 2008

18 RFG – 2007/2008 Meetings Week of 15 October 2007 (Europe, Toulouse) Week of 21 January 2008 (USA, Melbourne) Week of 07 April 2008 (Europe, Brussels)

19 Overall Timeline: Standardisation, Certification & Rulemaking

20 Overall Timeline: Standardisation, Certification & Rulemaking Overall Timeline: Standardisation, Certification & SES Rulemaking RFG SPR/INTEROP RAD, VSA, ITP APT, other ? AIRB, SURF FAA TSO C166A >20152008 200920102011 2012 <2007 Implementation EC SES IR Rulemaking EUROCAE/RTCA 1090 ES Transponder MOPS NRA EASA/FAA (E)TSO-166x Towards Joint Transponder TSO EASA ‘RFG’ AMC ED102/DO260 DO260A EASA NRA AMC EASA/FAA Rulemaking Initial Implementations – Pioneer Phase existing avionics ADS-B out Mandate avionics upgrade SPI IR MoC ED102A DO260A+ Towards Joint MOPS INTEROP Validation ADS-B in (voluntary)

21 Summary “ADS-B” out rulemaking on its way World-wide co-ordination ADS-B Pioneer Airlines & Monitoring Projects … … ED102/DO260 certification for early deployment RFG key to rulemaking baseline

22 Thanks

23 Backup

24 Scope of ADS-B Airborne Monitoring 1090 ES “ADS-B out“ Extended Squitter BDS 0,5 BDS 0,8 (BDS 0.9) (BDS 6,1) (BDS 6,5) Transponder Control Panel Callsign SPI-ES GNSS Position HPL HFOM Velocity Barometric Altimeter FL Mode S Transponder 24-bit address NUC-NIC/NAC Consistency (Mode A/C/S) Consistency (Performance) Correctness Performance Analysis (incl. latency) ALL: “counting” statistics

25 RFG within the CASCADE Context ASA/GSA SPR-INTEROP Simulations, Trials & Monitoring Procedures ATC Manual Aircrew Manual Ground Infrastructure Avionics System Standards Preliminary Safety Case EASA & JAA Regulation Airworthiness Approval Operational Approval EC SES Regulation