GSI Helmholtzzentrum für Schwerionenforschung GmbH Cryogenic Current Comparator – Status at GSI/FAIR -

Slides:



Advertisements
Similar presentations
Heavy Ion Cancer Therapy
Advertisements

FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
Development of the FLNR Cyclotron Complex /2009 Priority 1 Dubna,
Cyclotron Refurbishing & Development Meeting March 6, 2008.
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
FAIR Synchrotrons SIS100/300
The FAIR Antiproton Target B. Franzke, V. Gostishchev, K. Knie, U. Kopf, P. Sievers, M. Steck Production Target Magnetic Horn (Collector Lens) CR and RESR.
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Status of the FAIR pbar Source K. Knie May 3, 2011.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
GSI Helmholtzzentrum für Schwerionenforschung GmbH LINK EXISTING FACILITY I n order to prepare the existing GSI accelerator facility (mainly the SIS18)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
M. Steck, RUPAC 2006, Novosibirsk Cooling of Rare Isotope Beams in the ESR Cooling by: Stochastic cooling (pre-cooling) Electron cooling (final cooling)
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
Oleksiy Dolinskyy 23 rd October, FAIR layout of accelerators Collector Ring.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
Status of the FAIR CCC and Cryostat
Preparation Phase of the FAIR Project
Status of the FAIR Project
Precision Tests of Fundamental Interactions with Ion Trap Experiments
High energy beam transport.
ESR Slow highly charged ions and antiprotons
Oleksiy Dolinskyy December 1st, 2014
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
Cryogenic Current Comparator for FAIR Transfer lines
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Status of the CCC for CRYRING / FAIR
and collaboration with France
Presentation transcript:

GSI Helmholtzzentrum für Schwerionenforschung GmbH Cryogenic Current Comparator – Status at GSI/FAIR -

GSI Helmholtzzentrum für Schwerionenforschung GmbH Outline  Overview and timeline of the FAIR project at GSI  Cryogenic Current Comparators as German In-Kind to FAIR  CCCs in HEBT section of FAIR  CCC inside Collector Ring CR  Testbed for CCC inside  Results of the recent CCC beam tests  see Febin‘s presentation

GSI Helmholtzzentrum für Schwerionenforschung GmbH 3 GSI and the FAIR Modularized Start Version Existing GSI facility: UNILAC & SIS18 as injectors SIS100 and SIS300 S-FRS HEBT NESR RESR CR HESR UNILAC: Length: 120 m Energy: 11 MeV/u SIS18: Circumference: 216 m Energy up to 2 GeV/u acceleration of all ion species (protons to uranium) p-LINAC: high current 70 mA, 70 MeV SIS100: Superconducting, 100 Tm, 1-29 GeV/u, high current operation p to U p: 2.5  10 13, U 28+ : 5  /pulse HEBT: fast & slow extraction, low & high currents S-FRS: production of rare-isotope beams (RIB) CR: stochastic cooling of RIB and pbar HESR: storage and acceleration of pbar to 15 GeV/u Not included in Modularized Start Version: SIS300: 300 Tm, acceleration up to 30 GeV/u RESR: accumulation of pbar, deceleration of RIB NESR: versatile experimental ring for stable ions, RIB, pbar cooling, gas-target, e-A collider 100 m

GSI Helmholtzzentrum für Schwerionenforschung GmbH Facility for Antiproton & Ion Research 4 Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics UNILAC SIS18 SIS100/300p-Linac HESR CR & RESR NESR Cryring Rare-Isotope Production Target Anti-Proton Production Target 100 m QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH FAIR Experiments 5 CBM PANDA NuSTAR Super-FRS APPA Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH Google Earth for FAIR km Satellite’s View 6 Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH...closing in 7 Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH Synchrotrons: 1.1 km HESR: 0.6 km With beamlines: 3.2 km Existing SIS 18 MSV Civil Construction 8 Total area > m 2 Area buildings ~ m 2 Usable area ~ m 2 Volume of buildings ~ m 3 Substructure:~ 1500 pillars, up to 65 m deep Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH down to 18 m below ground Central Switchyard Building...with complex interior 9 Courtesy: Ingo Augustin

GSI Helmholtzzentrum für Schwerionenforschung GmbH Timeline MSV Courtesy: Ingo Augustin Submission of construction application Start Site preparation First civil construction contracts Building of accelerator & detector components Civil construction partly finished Start installing & commissioning accelerator and detector components Start commissioning with beam

GSI Helmholtzzentrum für Schwerionenforschung GmbH Project planning  work package structure 6Machine projects GSI & FZJ (HESR) 102Work packages 262MSP project plans 5MSP plans for buildings 4Experiments 51Work packages 30MSP experiment plans In addition: 72 MSP department plans (general dep. tasks without PSP Code) Courtesy: O. Kester

GSI Helmholtzzentrum für Schwerionenforschung GmbH Machines & Work Packages Courtesy: O. Kester

GSI Helmholtzzentrum für Schwerionenforschung GmbH German Inkinds CCC as German Inkind assigned to GSI as German shareholder of the FAIR project.

GSI Helmholtzzentrum für Schwerionenforschung GmbH IKRB-Decision, 20 Feb 2013 On GSI contributions to HEBT beam diagnostics: The IKRB recommends to the Council to assign the HEBT beam diagnostics components with the specified PSP codes (all from CB version 6.12) to the German Shareholder GSI as in-kind contribution: , , , , , , , , , , , , , , , , , , , , , For information: The corresponding in-kind contract is planned to be ready for signing during the 2nd quarter of 2015.

GSI Helmholtzzentrum für Schwerionenforschung GmbH IKRB-Decision, 20 Feb 2013 On GSI contributions to S-FRS and CR beam diagnostics: The IKRB recommends to the Council to assign the S-FRS and CR beam diagnostics components with the specified PSP codes (all from CB version 6.13) to the German Shareholder GSI as in-kind contribution: , , , , , , , , , , , , , , , , , For information: The corresponding in-kind contract is planned to be ready for signing during the 4th quarter of 2015.

GSI Helmholtzzentrum für Schwerionenforschung GmbH German In-Kind: CCC for HEBT, CR HEBT Cryo Current Comparator HEBT Cryo Current Comparator4 HEBT Detector4 HEBT Vacuum Chamber4 HEBT Mechanics4 HEBT Long Cables4 HEBT Detector Gas / Cryogenics4 HEBT Data Acquisition (per channel)4 CR Cryogenic Current Comparator CR Detector1 CR Vacuum Chamber & Cryostat 1 CR Mechanics - Niobium Shield 1 CR Long Cables 1 CR Detector Gas / Cryogenics 1 CR Data Acquisition (per channel) 1 HEBT: 4 CCC installations foreseen for measurement of slowly extracted beams CR: 1 CCC for online intensity measurement of circulating beam

GSI Helmholtzzentrum für Schwerionenforschung GmbH High Energy Beam Transport - HEBT

GSI Helmholtzzentrum für Schwerionenforschung GmbH G004A G017.1 G018 T108N T108S with HEBT Supply 18 T101 T104 T113 T106 T112 G004 T103 T110 with HEBT Beamline G G0 06C G0 Technical System Design – Tunnels and Buildings Courtesy: F. Hagenbuck

GSI Helmholtzzentrum für Schwerionenforschung GmbH Overview - HEBT beamlines- CCC HEBT A HEBT B HEBT C SIS 100 CBM CR HESR PbarTarg PP APPA SIS 18 SFRSTarg CCC Courtesy: F. Hagenbuck

GSI Helmholtzzentrum für Schwerionenforschung GmbH SIS100/300 DUMP SIS18 SFRS HEBT System Design Transfergebäude Courtesy: F. Hagenbuck

GSI Helmholtzzentrum für Schwerionenforschung GmbH PbarTarg SIS18 SIS100 HESR CR CBM PP/AP SFRSTarg 21 Technical System Design SIS18 SIS100/300 CBM DUMP SIS100/300 SFRS SIS18 SIS100/300 CBM DUMP SIS100/300 SFRS Courtesy: F. Hagenbuck

GSI Helmholtzzentrum für Schwerionenforschung GmbH SIS18 SIS100/300 CBM 22 Technical System Design Courtesy: F. Hagenbuck

GSI Helmholtzzentrum für Schwerionenforschung GmbH CCC Installations in HEBT BeamlineLocationExtraction type Particle speciesStage T1S1SIS18- SIS100 slow, fastions, protons FAIR Startversion (Modules 0-3) T1X1SIS100 extraction slow, fastions,protons T1D1SIS100  dump slowions, protons TFF1SFRS- Target slowions T3C1SIS300 extraction slowions, protons Phase B T3D1SIS300  dump slowions, protons For all 6 beam lines above: minimal Intensity: 10 4 pps maximal intensity: pps IonMaximum Beam Current [slow extraction, 1 s] p160 nA U µA CCC

GSI Helmholtzzentrum für Schwerionenforschung GmbH Example: Slow Extraction to CBM Experiment The Au beam is produced in the following steps: UNILAC Au4+ is produced in the MEVVA source, Au25+ is produced in the UNILAC gas stripper at 1.4 MeV/u, Accelerated in UNILAC to 11.4 MeV/u, Stripping of Au25+ ions to Au65+ ions in the TK Stripper, 4 pulses are produced in ~1 s (2.7 Hz). SIS18 Accelerates each pulse to 1 GeV/u, Needs ~1.6 s for 4 batches (including pre- and post- processing) as limited by ion source. HEBT transfer and stripping of Au65+ ions to Au79+ ions. SIS100 Injection of 4 batches from SIS18 needs ~1.1 s Acceleration to 11 GeV/u KO-Extraction, spill length s Repetition Time ~ s Reference Production chain for operation in MSV Beam ParametersUNILACSIS18SIS100 Ion typesAu 25+ Au 79+ Time structure Slow extraction Number of ions per pulse Ref. energy [GeV/u] 4 Energy range [GeV/u] 2-11 Transverse emittance RMS [mm mrad] 3x3 Pulse length [s]na 10 Momentum spread 10 -5

GSI Helmholtzzentrum für Schwerionenforschung GmbH Collector Ring - CR

GSI Helmholtzzentrum für Schwerionenforschung GmbH Progress on the Collector Ring  The Technical Design Report of the CR has been updated and approved in February  In-kind Review Board (IKRB) meeting ( ) assigns a major part of the CR components (63 %) to Budker Institute of Nuclear Physics (BINP)  Contract on transfer of the CR system responsibility to BINP is prepared. After Council decision it can be signed.  BINP and GSI make good progress in design and procurement of CR components

GSI Helmholtzzentrum für Schwerionenforschung GmbH CR and beam parameters Courtesy: O. Chorniy

GSI Helmholtzzentrum für Schwerionenforschung GmbH BD components in CR and electronic room Distribution of the DAQ for different components among available racks Location of beam diagnostic devices in tunnel Courtesy: O. Chorniy

GSI Helmholtzzentrum für Schwerionenforschung GmbH Official CR layouts from TDR Schematic layout of the CR with major installations and its nomenclature. CR and RESR rings in common building with stochastic cooling lines of the CR Courtesy: O. Chorniy

GSI Helmholtzzentrum für Schwerionenforschung GmbH RF – cavities Stochastic cooling Pick-Up Stochastic cooling Kickers Injection Kicker magnets Collector Ring (CR) Courtesy: A. Dolinskii

GSI Helmholtzzentrum für Schwerionenforschung GmbH CR scheme and present location of CCC Particles distribution at the present location of CCC. Pbar optic mm diameter CCC in CR Courtesy: O. Chorniy

GSI Helmholtzzentrum für Schwerionenforschung GmbH ESR

GSI Helmholtzzentrum für Schwerionenforschung GmbH 11 MeV/u UNILAC SIS 400 MeV/u ESR FRS 4 MeV/u GSI ESR F. Herfurth "HITRAP and CRYRING - deceleration of HCI and p-bar" Courtesy: F. Herfurth

GSI Helmholtzzentrum für Schwerionenforschung GmbH ESR SIS 400 MeV/u ESR FRS 4 MeV/u 11 MeV/u UNILAC GSI Timeline ESR Start of installations: Now Operation of ion source and injector: End 2014 Complete ring installed: Mid 2015 First test runs with preliminary vacuum conditions: Fall 2015 Machine commissioning + vacuum improvement until spring 2016  first physics experiments Experiment section Courtesy: F. Herfurth

GSI Helmholtzzentrum für Schwerionenforschung GmbH 35 Injection ECOOL HF gap Extraction Experiment Schottky/diag ~3,3m CRYRING Characteristics Reconfigured from MSL setup Increased circumference ESR/2 = 54 m New injection and extraction schemes Magnetic rigidity: – 1.44 Tm Proton energy range: 0.14 – 96 MeV Intensity range (from injector): <50  A A/q max (from RFQ): 4 Vacuum: (start) – mbar (final) Beam pipe diameters: 100 – 150 mm Courtesy: F. Herfurth

GSI Helmholtzzentrum für Schwerionenforschung GmbH Summary & Outlook  FAIR project progressing well (acc installation >= 2017)  CCCs are part of German in-kind delivered by GSI  4 CCCs inside HEBT, 1 CCC inside CR  CRYRING as testbed for CCC development  Outlook:  CERN-GSI collaboration agreement to be signed soon  New partners inside future CCC collaboration (HIJ, IPHT, Supracon and others, mainly in/near Jena)  Definition of responsibilies, work packages etc. required  Proposal for BMBF-Project (Meeting on „Verbundforschung“ on 8./9. September

GSI Helmholtzzentrum für Schwerionenforschung GmbH  Additional Slides....

GSI Helmholtzzentrum für Schwerionenforschung GmbH Standard Flange NW200

GSI Helmholtzzentrum für Schwerionenforschung GmbH Standard Flange NW150