2014 NEC Code Changes Ted “Smitty” Smith.

Slides:



Advertisements
Similar presentations
Bonding and Grounding What? Why? How?
Advertisements

ECCODES A Leader in Education Are You smarter than a THIRD Year Apprentice? Electricians.
UNIT 31 HOME ELECTRICAL SYSTEM
2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
REVIEW OF CODE BREAKFAST QUESTIONS Brought to you by fellow members who attended the Section Meeting.
Master Examination Practice Drill # Ted “Smitty” Smith.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
EET Survey of Electronics
Electrical Power Systems
Electrical Principles and Wiring Materials
2014 CHANGES TWO MINUTE DRILL COPYRIGHT TED “SMITTY” SMITH ©2014.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Electrical Principles and Wiring Materials
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Two Minute Drill Number 32- Journeyman Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 25- Residential Improving your skill in code Look Up Increasing Speed Drill.
2005 NEC ® Code Changes Presenter Mark Nowak North East Specification and Project Manager.
©Ted “Smitty” Smith  This speed drill is designed to help you practice calculations. The slides will transition in three and one half minutes instead.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
Two Minute Drill #10 Copyright 2005 Ted "Smitty" Smith.
Electrical Principles and Wiring Materials Unit #31.
Calculation Speed Drill # NEC
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Copyright 2005 Ted "Smitty" Smith Practice Code Look Up Two Minute Drill #6.
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Electricity By: Mr. Brock. Electrical Safety 1) Always disconnect the circuit to be worked on before anything else and lock the cover to the SEP when.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Ag. Mechanics for Beginning Teachers
SERVICE ENTRANCE EQUIPMENT
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
2014 NEC C ODE C HANGES C LASS P ART III C ALCULATIONS Ted “Smitty” Smith 8/15/2014 E Light Electric Services, Inc.
2014 NEC C ODE C HANGES C LASS P ART II Ted “Smitty” Smith 8/15/2014 E Light Electric Services, Inc.
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
N.E.C. Installation Techniques and Common Violations
Smitty’s Two Minute Drill Grounding
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Advanced Calculations Drill 1 for the 2011 NEC
License Examination Practice Drill
Chapter 12 Branch Circuits and Feeders. Chapter 12 Branch Circuits and Feeders.
2011 Changes Two Minute Drill
Smitty’s Two Minute Drills
Smitty’s Two Minute Drill Mixed Content -05
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Smitty’s Two Minute Drill #9: Special Occupancies
Agricultural Systems Technology II
Practice Code Look Up Two Minute Drill #7
AFCI Protection: AFCI Receptacles and the NEC
Conductors and Cables 2017 NEC
Calculations: Transformers and Service Conductor Calculations
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
Two Minute Drill: Raceways and Boxes 2017
2014 Changes Two Minute Drill
EET 323 – Electrical System Design Lecture 9: Grounding
Electrical Principles and Wiring Materials
2008 Code Drills Health Care Facilities
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Smitty’s Two Minute Drill Varied Number 7
Two Minute Drill – Residential 2
Presentation transcript:

2014 NEC Code Changes Ted “Smitty” Smith

Article 750 Energy Management Systems Brand New Article Prompted by the need to meet energy management requirements There are certain systems that we do not want to interfere with in this process Article 750

750.20 Alternate Power Sources Energy management systems shall not override alternate power sources for the following systems Fire Pumps Health Care Facilities Emergency Systems Legally Required Standby Systems 750.20

Load Shedding Controls Energy Management Systems can not interfere with the load shedding controls for the following Fire Pumps Health Care Facility Emergency Systems Legally Required Standby Systems Load Shedding Controls

Low and Medium Voltage Demarcation The code has historically divided low and medium voltage at 600V Solar and Wind had moved towards a standard of 1000 Volts In almost all circumstances where a proposal was submitted to change from 600V to 1000V it was accepted. Code Making Panel 1 did not change Article 110 and deferred other changes to individual code making panels. Low and Medium Voltage Demarcation

Outward opening door and panic hardware requirement for electrical rooms has changed from being required for equipment 1200 Amps and greater to now be 800 Amps and greater 110.26

Laundry Areas has been added to the list of areas in a dwelling unit where GFCI protection is required Dishwashers are now required to be GFCI protected. 210.8 GFCI

AFCI is now required in kitchens and laundry areas of dwelling units Dormatory Units will now need to be AFCI protected Several new options have been added to provided AFCI protection 210. 12 AFCI

Six Methods to Provide AFCI 1. AFCI Combination Breaker 2. Branch/ Feeder Breaker for the homerun only, then AFCI device at first receptacle 3. Supplemental Arc Protection breaker for homerun then a AFCI receptacle for first outlet. Limited to 50 ft or 75 ft homerun. 4. A listed branch circuit AFCI device that has been listed to work together to protect both the homerun and the demand side of the circuit. Limited to 50 and 75 ft homeruns 5. Use a steel wiring method from breaker to first outlet. Use a AFCI receptacle at first outlet 6. Encase homerun in 2” of concrete and then use an AFCI receptacle at the first outlet. Six Methods to Provide AFCI

220.12 Lighting Loads Related to new energy code requirements Energy codes are requiring fewer watts per square foot but systems are required to be designed to handle much more load New code requirement allows you to size lighting loads at a lower amount if you meet specific requirements of a energy management system in the building. 220.12 Lighting Loads

Formally named Non-instantaneous Trip Circuit Breakers Renamed to be more definitive of the subject matter If the CB has a rating or can be adjusted to 1200A or greater then the requirements of .87 must be met Uses the same language as 240.95 the GFI requirement 240.87 Arc Energy Reduction

310.15(B)(7) Dwelling Unit Service Entrance Conductor Sizing Table Table is now eliminated Replaced with an adjustment factor of .83 It also will clarify that other adjustment factors apply 310.15(B)(7) Dwelling Unit Service Entrance Conductor Sizing Table

406.9(B)(1) Wet Location Receptacles Same requirements as 2011 for in use covers, etc New requirement that the cover be extra hard usage listed 406.9(B)(1) Wet Location Receptacles

Article 517 Health Care Facilities Patient Bed Receptacles: Increased from 4 to 8 receptacles required. Critical Care Patient Care Area Receptacles: Increased from 6 to 14 Operating Rooms now require 36 receptacles ISOLATED GROUND RECEPTACLES NO LONGER ALLOWED IN PATIENT CARE BED AREAS Article 517 Health Care Facilities

Essential Electrical System needed to meet the requirements of Article 700 in the 2005 NEC Now clarified to be just be a requirement of the Life Safety Branch and not the entire Essential Electrical System. 517.26

Electric Vehicle Supply Equipment 625.14 New requirement electric vehicle supply equipment is considered to be a continuous load 125% application If supplied by an energy management system then size OCPD and conductor based on the load supplied by the energy management system WITHOUT 125% requirement. Electric Vehicle Supply Equipment 625.14

690.17 Solar Power Disconnect Switch Added a list of listing requirements that are acceptable for PV disconnects switchs. The old requirement just required they be listed. There are numerous listing specifications available so the NEC narrowed them down to the ones that are acceptable. 690.17 Solar Power Disconnect Switch

Surge Protection for Emergency Standby Systems Article 700 Surge protection is now also required for the alternate power supply system New requirement Surge Protection for Emergency Standby Systems Article 700

Emergency Illumination 700.16 now requires emergency illumination at the emergency power disconnect devices and transfer switch areas. Emergency Illumination

Article 705 Interconnection of Power Production Systems Utility Supply and PV system for example Requires now OCPD near the point of interconnection to protect against faults in the feeders that could flow back to utility Article 705 Interconnection of Power Production Systems

Commercial Electrical Service Areas A new requirement for 120v receptacle installed adjacent to the electrical service. Dwelling units excepted Commercial Electrical Service Areas

PV System Rapid Shutdown The new requirement is going to be difficult to meet This requires the same type of rapid shutdown that is required by the 6 handle rule 690.12 There is no current equipment to accommodate this. PV System Rapid Shutdown

Conductors of Different Systems 300.6(C) We can have conductors of different voltages in the same raceway, junction box, and enclosure under the following conditions All of the circuits are 1000v or less All of the conductors are rated for the highest voltage in the box. Give a brief overview of the presentation. Describe the major focus of the presentation and why it is important. Introduce each of the major topics. To provide a road map for the audience, you can repeat this Overview slide throughout the presentation, highlighting the particular topic you will discuss next. Conductors of Different Systems 300.6(C)

Secondary Wiring to High Discharge Lighting 310.6(C) The secondary wiring for EDL 1000V or less if insulated for the secondary voltage involved, can occupy the same luminaire, sign, or outline lighting enclosure Secondary Wiring to High Discharge Lighting 310.6(C)

Any field cut ferrous metal raceways, etc need to be suitably protected from corrosion in the environment Field cuts have to have the corrosion protection replaced A new information note clarifies that a field cut is any cut made anywhere other than at the factory Corrosive Areas 330.6(A)

300.22(C) Other spaces used for Environmental Air (Plenums) Nonmetallic cable ties and other nonmetallic cable accessories used to secure and support cables shall be listed as having low smoke and heat release properties 300.22(C) Other spaces used for Environmental Air (Plenums)

300.38 Raceways in Wet Locations above Grade Where raceways are installed in wet locations above grade the interior of the raceway shall be considered a wet location. 300.38 Raceways in Wet Locations above Grade

XHHN conductors are now exempted from this requirement Cables and Raceways on Rooftops Exposed to Direct Sunlight (T310.15(B)(3)(c)

314.15 Boxes in Damp or Wet Locations We can now drill drainage holes in boxes listed for damp and wet locations as long as the hole is no larger than ¼ inch. We can also install listed drain fittings in larger holes as long as it is done according to the manufacturers instructions. 314.15 Boxes in Damp or Wet Locations

314.16(B) Box Fill Clamp Assemblies New addition to cover clamp assemblies with terminations listed for use with non-metallic boxes This assembly is counted as a single cable clamp 314.16(B) Box Fill Clamp Assemblies

If there is more than one neutral associated with different circuits in an enclosure the neutrals have to identified or grouped so that they correspond with the ungrounded circuits for which they are associated. This can be done by wire markers, cable ties, or similar means in at least one location within the enclosure. 200.4(B) Neutral Marking

210.5(c)(1) Branch Circuit Identification They have further clarified the requirement to identify ungrounded conductors of systems with multiple voltages at all terminations, connection and splices by phase, line and system. This clarifies the requirement in houses or structures in single phase systems This is easily enforceable and often violated 210.5(c)(1) Branch Circuit Identification

They have added an entire new section about this for DC systems More than 50 volts 4 AWG or larger Identified by Polarity Ungrounded conductor By marking tape, tagging At all spices, terminations and connections 210.5(c)(2)

They have added an entire new section about this for DC systems More than 50 volts 6 AWG and smaller Positive Polarity Red outer finish Red stripe continuously and durable Imprinted plus signed or the work POSITIVE or POS repeated ate intervals of no less than 24 inches Negative Polarity Black outer finish Black stripe continuously or durable Imprinted minus sign, or word NEGATIVE OR NEG repeated at intervals no less than 24 incues 210.5(c)(2)

This requirement has been added to 215 feeders as well And it is referenced in the PV article Applies PV Systems

Outside Branch Circuits and Feeders over 1000V Design including settings for protective devices, switching and control circuits have to be made available to the AHJ before energization And shall be performance tested when first installed on site 225.56 Inspection and Tests

New strength requirement or supported by guy wires Can not be connected to the mast between the weatherhead and the end of the conduit or coupling if the coupling is located above the last point of securement to the structure Weatherheads have to be identified for use as service-entrance equipment 230.28 Service Masts

230.30 Service Laterals Must be installed in only the following RMC IMC NUCC HDPE PVC RTRC IGS cable USE MV or MC identified for direct burial 230.30 Service Laterals