Welcome to Horner Operator Control Station Training

Slides:



Advertisements
Similar presentations
What’s New in Fireware XTM
Advertisements

Think Automation and beyond… WindO/I-NV2 version 4.62 (AO v1.82) New Features 10/19/2012.
Follow the instruction to install the PC Suite from the SD card: 1.Go to the settings -> SD Card & phone storage -> Enable the mass storage only mode 2.Connect.
Yokogawa Network Solutions Presents:
Configuring APACS & AAN Controllers
PLC Selection, Components, and Communication
CIMCO Integration Software Products
Telemetry Modules Quick Start
CY-SWR1100 Dual Band Wireless N Router
EMS1EP Lecture 4 Intro to Programming Dr. Robert Ross.
QUICK GUIDE MANUAL GV-DVR System Organization 2. Specification.
How To Set Up A Wireless Network Using A D-Link Wireless Router
Project Updates. XL7 Released May 31 –Single Ethernet Port –Single CAN Port Release July 11 –Dual Ethernet Port –Dual CAN Ports CAN 1 – CsCAN CAN 2 –
Lab7: Introduction to Arduino
Copyright © 2005 Rockwell Automation, Inc. All rights reserved. 1 Micro Logix 1100 RSLogix 500 LAB#2 Timing, Counting & Comparing.
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
Riso Digital Education Center Appendix for SRC Training Basic Course 1.
A Next Generation OCS Welcome to Horner Operator Control Station Training.
DVG-N5402SP.
EPOCH 1000 File Management Data Logging and Reporting
Copyright © 2005 Rockwell Automation, Inc. All rights reserved. 1 Starting & Stopping Motors Micro Logix 1100 RSLogix 500 LAB#1.
LSU 06/04/2007BASIC Stamp Editor1 The BASIC Stamp Editor Programming Unit, Lecture 3.
Advantages of using R.PC.R Software Now that you know some of the advantage let’s take a look at the software … Reliable and Comprehensive Reporting Recording.
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
1 Starting & Stopping Motors Pico Pico LAB#4. 2 Program a series of three basic ladder logic rungs. These basic rungs are the most common rungs found.
SCADA and Telemetry Presented By:.
DWR-113 FAQ’s 3G WiFi Router.
1 Chapter 2 ROUTER FUNDAMENTALS By: Tassos Tassou.
6 PLC Programming. 6 PLC Programming Objectives List the rules for creating a PLC ladder logic diagram. Convert a relay logic diagram to a PLC ladder.
Operator Panel and Programmable Logic Controller.
Chapter 10 PLC Processors.
Dr Masri Ayob TK 2633: Microprocessor & Interfacing Lecture 7: Assembly Language.
Industrial Process Control System Simon Hui Engineer Control and Informatics, Industrial Centre.
XS26-2 Expandable Safety Controller.
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
Specview 32 Release 2.5 Enhancements
1 © 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID Scientific Atlanta Configuration Module 2.3.
Memory Layout and SLC500™ System Addresses. Processor Memory Division An SLC 500 processor's memory is divided into two storage areas. Like two drawers.
Memory Layout and SLC500 System Addresses. Processor Memory Division An SLC 500 processor's memory is divided into two storage areas. Like two drawers.
COMPUTER ARCHITECTURE. Recommended Text 1Computer Organization and Architecture by William Stallings 2Structured Computer Organisation Andrew S. Tanenbaum.
Copyright © 2002 Delmar Thomson Learning Chapter 10 PLC Processors.
1 PanelView ™ 300 Micro & MicroLogix ™ Lab 1. 2 Today you will receive training on the NEW PanelView 300 Micro operator terminal and the NEW version of.
Programmable Logic Training Course HDL Editor
PROGRAMMABLE LOGIC CONTROLLER
Renesas Technology America Inc. 1 M16C Seminars Lab 3 Creating Projects Using HEW4 14 March 2005 M16C Seminars Lab 3 Creating Projects Using HEW4 Last.
Cscape EnvisionRV Horner APG, LLC. EnvisionRV - What Does it Do? Allows viewing and interacting with remote OCS controllers. The PC displays screens that.
GPRS functionality overview in Horner OCS. GPRS functionality – Peer to Peer communication over GPRS – CSCAPE connectivity over GPRS – Data exchange using.
HORNERAPGHORNERAPG HORNERAPGHORNERAPG 20 Years of Innovation Operator Control Station Workshop Operator Control Station “All in One” Integrated.
Envision Tutorial Horner APG, LLC July 18, Introduction The Cscape Remote Viewer allows remote interaction with the user interface on Horner OCS.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Hardware Introduction – Standard vs Q.i
Quick guide to ASIMON configuration For version 3.0 or greater SAFETY AT WORK Date: 3/18/2009.
AAP Support Training Anritsu CAT Support – North America
Cscape EnvisionFX Horner APG, LLC March 7, EnvisionFX - What Does it Do? Graphical interface allows easy transfers of data to and from the PC and.
Cscape 8.6 August 2008 Horner APG. New Workbench Features - New Model – XL6.
HORNERAPGHORNERAPG HORNERAPGHORNERAPG 20 Years of Innovation Operator Control Station Workshop Operator Control Station “All in One” Integrated.
© 2013 Eaton Corporation. All rights reserved. easy Programmable Relay Training Program Exercise 3.
Programmable Logic Controller
Chapter 5.
An Overview When Connecting to Yaskawa Drives Date: 8/14/06, Rev: PP.AFD.26.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900H L06 - Developing Safety Applications Using the Guardmaster®
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
The New User Interface MEDITECH Training & Education.
Chapter 5.
OCS Configuration Software:
Haiwell PLC Modules Introduce
Pico Pico LAB#1 Starting & Stopping Motors.
MicroEconomix 1500 RSLogix 500 LAB#2
MicroEconomix 1500 RSLogix 500 LAB#1
Presentation transcript:

Welcome to Horner Operator Control Station Training

Class Agenda - Building Automation Discussion - Product Overview/Capabilities - Controller Basics - Cscape Discussion - Lab1 and Lab2 - More Cscape Discussion - And more labs

Horner Building Automation - Scheduled Lighting Control - Zone Settable Schedule - Motion Sensor for Schedule Override - Temperature Readings - Web Serving (Coming Someday)

Horner Building Automation - Training Room - Only Settable in Training Room - CsCan Lighting Controls - DMX Lighting for CAN Lights

Product Features: - Fully Integrated Display and Keypad - Several Communication Options - Ethernet (Available on Most models) - EGD (Ethernet Global Data) - SRTP - Modbus Client and Server - Ethernet IP - Serial (Modbus, SNP, DF1, etc…) - CsCan

Product Features (cont): - Full Complement of I/O - Analog Inputs - Voltage and Current - Temperature (THM, RTD, and Thermistor) - Analog Output (Voltage and Current) - High Speed Counters - Mixed Modules - Specialty Communication Modules

Product Features (cont): - Various I/O platforms available - Smart Stacks - Remote Fiber I/O - Smart Stix (CsCan) - Smart Mods (Modbus)

Controller Basics - Programmable Controller - I/O (Inputs / Outputs) A set of coded instructions that enables a machine to perform a desired sequence of operations. To provide (a machine) with a set of coded working instructions. To train to perform automatically in a desired way. To prepare an instructional sequence - I/O (Inputs / Outputs) Input and Output communication between a controller and its "peripherals". - Program (RLL) Relay Ladder Logic. Similar to a one line electric diagram. - Operator Interface A device to let an operator monitor and adjust parameters on a machine or process through the controller. - Networking Interconnecting Controllers, Operator Interfaces and I/O to allow them all to communicate as one system.

Controller Basics Bit is One Decimal Place (Digital) A Byte is 8 Bits Either On or Off (1 or 0) A Byte is 8 Bits +127 to -128 Word is 2 Bytes or 16 Bits +32767 to -32768 ex. 00000000 00100101 = +37 (used for Analog and Register values) (sign bit) 16384 8192 4096 2048 1024 512 256 128 64 32 16 8 4 2 1 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Bit Type I/O Type %I# Field Discrete Input to OCS. (Digital Inputs) %Q# Field Discrete Output from OCS. (Digital Outputs) %M# Internal Coils in OCS. %T# Internal Coils in OCS. Non-Retentive. %S# Internal Diagnostic Contacts. %K# Function Key Contacts. %D# Display bits used to turn on screens and for logical compares.

Word I/O Type %R# Internal 16 bit Registers used to store user data information. Timers, counters, and data storage. %AI# Field varying signal input to OCS. %AQ# Field varying signal output from OCS. %SR# Internal system values like Time/Date/Year, display, number, LED’s and more.

Cscape Setup

Cscape Communication Options - Serial - PC w/ Serial Port - USB to RS232 converter (HE500USB600) - Ethernet (Optional on Most Units) - PCI or ISA - USB to CAN Interface (K-CAN) - USB (Currently only on the XL6)

Communication Setup

Communication Setup (Serial) Up to 255 Com Ports available.

Communication Setup (Ethernet) 3 different modes of Ethernet: GPRS – Cellular NX/QX – Embedded XL Series – Optional

Communication Setup (CAN) 3 different CAN Interfaces: CGM500 – ISA ESD – PCI K CAN – USB or PCI

Communication Setup (Modem) Configures Internal Modem and Phone Number New in Cscape 8.6

Editor Options View Properties Dialog Auto-Save Deselect Element Open Last File Export Setpoint Data Aggressive Debug Use Classic Cscape Use Abbreviated Part Numbers

Editor Options View “Properties Dialog” after Snap-in of Element When checked, the programmer will need to assign addresses to the element after placement. The Properties Dialog box will automatically open.

Editor Options Auto-save When checked, this option will automatically save the program at that moment in time. Caution that this feature will not prompt the programmer that an Auto-save is about to take place so take care and archive programs. Return to Editor Options

Editor Options De-select element after placement If checked. After an element is placed on the screen, the arrow pointer will appear. If unchecked, the element will remain active until the arrow is selected from the Tool Bar or ESC is pressed. Return to Editor Options

Editor Options Open last file on startup If checked, Cscape will open the last saved file when Cscape is opened the next time. Return to Editor Options

Editor Options Export Setpoint Data Return to Editor Options

Editor Options Use Aggressive Debug Screen Updates When checked, this option will update your PC’s video card more often than when it is not checked. On some PC’s if not checked, Debug may not indicate the true state of some elements. Return to Editor Options

Editor Options Use Classic Cscape Mode When checked, Cscape will have the same look and feel as pre-version 8.5. Return to Editor Options

Editor Options Use Abbreviated Part Numbers The US and European Offices have different part numbering structure for the same components. When checked, it will display the US part numbers in areas where part numbers are referenced.

Editor Options - Ladder Multiple Output Coils Function Blocks Variable Display Advanced IEC 61131

Editor Options - Ladder Multiple Output Coils Allow – Allows programmer to reference the same output coil multiple times without generating an error. Warning – Allows programmer to reference the same output coil multiple times but will generate an error when error checking is performed and when a download is performed. Warning will still allow the programmer to download the program. Error – Will generate an error when error checking is performed and when a download is attempted but will not allow a download. Return to Ladder Editor Options

Editor Options - Ladder Function Blocks When checked, allows programmer to branch around functions with a contact. An error will be generated at the time of a download if this is not checked and a branch around a function is performed. Return to Ladder Editor Options

Editor Options - Ladder Variable Display Name and Address will display both the I/O name assigned to the variable, if assigned, and the address of the variable in Cscape. Address Only will display only the address of the variable in Cscape. Return to Ladder Editor Options

Editor Options - Ladder Advanced IEC 61131 Languages This should be left as “Only Execute Advanced Ladder”

Editor Options - Numbering 2 options for laddering numbering: Line Numbers – Black Numbers Rung Numbers – Shown in red after a rung is created. Line numbers count all spaces and comments where the rung number only increases when a rung is created.

Editor Options - Colors This sets the background color of Cscape. Take caution when using the following colors: Red – Debug is red so debug is difficult to view. Black – Rungs are black so impossible to see rungs. White – Grid lines are white so grid lines are not viewable.

Connecting to a Controller Connect button is used to go online with the controller and offline with the controller when connecting serially to a controller. Pre-version 8.6, the software would capture the configured port when Cscape was opened.

Connecting to a Controller Local indicates the controller ID that the software is directly connected. Target indicates the ID that the software is attempting to communicate with. It is possible to have a Local and Target that are different.

Connecting to a Controller Things to verify if Cscape is not communicating with the controller: - Verify the state of the Local ID. If the local contains ???, then the software is not communicating to the controller. - Verify that another software package is using the port. - Verify that the unit is powered up. - Verify that the connected unit is not using the programming port for another function. If this is the case, then putting the controller into Stop or IDLE mode through the System Menu will open the port for Cscape communication. - If the Local indicates No Port - Verify that the configured port is an actual port on the PC. This can be done through the control panel of the PC. - Verify that the programming cable is plugged into the PC and the controller. - The following is trouble shooting for pass through CsCAN communication. If the Local Indicates a valid number (1 – 253), then verify the Target ID is correct. The state of the Target will be in parenthesis after the Target number. If this indicates anything other R, I, D, then verify the cabling, baud rate, and the setting of the Target node ID.

Controller Configuration

I/O Configuration - Smart Stack

I/O Configuration – X Products

I/O Names

I/O Names Rules for I/O Naming: - Names must begin with a letter - Names can not contain any spaces - Names can not contain any special characters (@$%-*)

Boolean Elements Normally Open Contact – Passes power when element is active. Normally Closed Contact – Passes power when element is not active. Normally Open Coil – Active when rung it true. Normally Closed Coil – Active when the rung is not true.

Creating New Rung Place Contact in the A column. Notice the Screw Terminal in the left margin.

Creating New Rung Right Click in the left margin to create a new rung of logic.

Branching Tool

Output Coils Placement