1 CMAA Sustainability Workshop Friday, January 23, 2009 Washington, DC The New U.S. Census Bureau Headquarters Suitland, Maryland JAG BHARGAVA, PE, PMP,

Slides:



Advertisements
Similar presentations
US Green Building Council (USGBC)
Advertisements

LEED® Certification :- Scoring Points
Beyond LEED for New Construction: Recommendations for Change Patrice Frey Director of Sustainability Research National Trust for Historic Preservation.
Page 1 September 2009 © Siemens Building Technologies, Inc The Pathways to Sustainability For Our Nations Schools Nichelle Grant, LEED ® AP Siemens.
AIA Honolulu, LEED-CI Gold Intergen, LEED-CI Certified
Sustainable Buildings and Green Markets
To Flush or Not to Flush Compliance with LEED-NC ® 2.2 EQ 3.1 & 3.2 Tom Hanlon LEED AP, NEBB Cx.
Community College Facilities: The Case for Sustainable Construction 1 Presenter: Kenneth C. Kempf Manager, Engineering and Design, LEED-AP.
Leadership in Energy & Environmental Design
Where State Funded Schools Stand in relation to the State of Arizona Energy & Renewable resources mandates.
Specifying for LEED.
Mestek Overview Founded in Westfield, MA in 1946 as Sterling Radiator by John E. Reed 4 employees in a rented garage Produced only hydronic finned-tube.
Ft. Lauderdale Region Counties: Broward.
Healthy Building, Healthy Community Crystal Lake, Illinois.
Counties: Flagler Lake Orange Osceola Seminole Volusia
The Green Standard Standard , Standard for the Design of High-Performance Green Buildings.
ASHRAE/USGBC/IES Standard Kent W. Peterson, PE, FASHRAE, LEED ® AP Standard for the Design of High-Performance Green.
Viewing High Performance (HP) Design
LEED NC Credit Summary NUMBERS & NAMES Slide Editor: James A. Strapko LEED Source:
Patrik Lazzari, CIE, LEED AP
PSSA Preparation.
Specifying GREEN A presentation by Building Systems Design, Inc.
LEED-CI LEED for Commercial Interiors
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Sustainable Design & Construction at Yale University July 2009.
46 Blackstone Street LEED-NC v2.1 Platinum 46 Blackstone, LEED Platinum.
Introducing Connecticut LEED Program for Green Buildings
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
LEED L EADERSHIP IN ENERGY AND ENVIRONMENT D ESIGN.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
BECOMING GREEN Santa Margarita High School Academic Building.
Ripley Rasmus AIA LEED AP
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
Certified Green Buildings: Why and How
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
PRISHA PROPERTIES INDIA PVT LTD.
Green Building Design and LEED Certification ACMA 2008 Summer Conference 2008.
Learning by Design Using LEED to enhance teaching and learning.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
Stormwater Academy: Green Roofs Green Roof Design and Operation Operation (Part IV) 2006 FSA Annual Conference June 14, 2006 By Marty Wanielista and Mike.
The Cost Implications of LEED A Presentation By Hanscomb Faithful & Gould September 29 th – 2005 Ms. Carin Rautenbach – Vice President, LEED AP Ms. Minna.
Energy Efficiency Agua Fria Union High School District John Schmadeke, Asst. Supt. Operations.
Value Engineering and LEED Jim Sullivan, M.A.M.C., M.B.C., LEED A.P.
NEW YORK BANKERS ASSOCIATION Pennsylvania Credit Union Association Kevin W. Poirot Vice President May 23, 2008 Building Green: What You Should Know.
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
LEED-NC Market Transformation As of All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered.
African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP.
ENVELOPE. LIGHTING.
Big Ten Sustainability Conference November 15-16, 2010 Energy Design & LEED Standards.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Project 15 DS413: Design Studio 413 May 9, 2012.
1. LEED and the Future of Green Building in the Senior Living Community 2.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
San Francisco’s Green Building Ordinance: The New LEED Gold Standard a BOMA Lunch Workshop October 8, 2008 Presented by: Steven Ring
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
Objectives of a Green Building
ASHRAE Standards in LEED by K. M. BAZEETH AHAMED M. E. , CEM. ,CEA
INTD409 Interior Environmental Technology Fall 2016/17
2- INTD409 Interion Environmental Technology
2- INTD409 Interion Environmental Technology Fall 2014/15
LEED 2.2 for New Construction LEED 2.0 for Existing Buildings
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Leadership in Energy and Environmental Design (LEED)
Presentation transcript:

1 CMAA Sustainability Workshop Friday, January 23, 2009 Washington, DC The New U.S. Census Bureau Headquarters Suitland, Maryland JAG BHARGAVA, PE, PMP, CCM, DBIA Acting Deputy Director & Project Executive, GSA ROD GARRETT, AIA Associate Director, SOM IRIS AMDUR, LEED AP Principal, Greenshape

2 New U.S. Census Bureau Headquarters

3 INTRODUCTION  1.5 million square foot office space & 1.0 million structured parking, $400. million.  Bridging Design-Build Delivery Method The Team - Bridging A/E- SOM - DBC- Skanska (GC) &HKS ( Architect of the Record) - CM- DMJM / Heery ( Jt. Venture) - LEED consultant - Greenshape  Construction & Occupancy Completed, 2007.

4 OWNER’S PERSPECTIVE  GSA wanted to achieve GSA's new Standard of LEED silver or higher.  Bridging Design-Build delivery method was new untested to achieve LEED.  SOM's Concept, which achieved 34 LEED points.  GSA Concerns : - HKS's CD when completed may not get 34 LEED points - DBC's design proposal may conflict with PBS P-100  Benefits in having CM, and Bringing the CM on very early : - To oversee LEED process and to track LEED points - To perform and oversee additional commissioning ( Which achieved 1 LEED Point) until all equipment turnover  GSA saw Benefit in having DBC hire an Independent LEED consultant, Greenshape.

5 GREEN IS GOOD...there is no other building complex like this in the world  Designed to be the architectural expression of sustainability.  Set in an 80-acre woodland preserve.  Two buildings have been conceptually "Cleaved" from a single mass.  Central garden, courtyards, and other sustainable landscape gardens.  Woodland-facing facades are clad in a unique, architectural sunshade.  Parking structures green screens with climbing ivy.  Scenic views brought into the workplace.  "Mainstreet" with all kinds of amenities.

6 SUSTAINABILITY

A.User Comfort Daylight + Indoor Air Quality Underfloor Air B.Water Conservation Site Stormwater management Natural filtering – Green Roofs Potable water usage Low flow fixtures - waterless fixtures C. Energy Conservation Heat Load Reduction Exterior sun screen “wood veil” Sustainability / Design Goals 7 A. GSA

8 A. User Comfort User Comfort GOAL Daylight + Indoor Air Quality SOLUTION Underfloor Air APPLIED TECHNOLOGY

9 A. User Comfort

10 A. User Comfort

11 A. User Comfort - Underfloor Air Distribution

12 A. User Comfort - Underfloor Air Distribution

13 B. Water Conservation Site Stormwater Management Natural Filtering – Green Roofs Water Conservation Potable Water Usage Low flow fixtures – water less fixtures GOAL SOLUTION APPLIED TECHNOLOGY

14 B. Water Conservation- Green Roofs

15 B. Water Conservation- Green Roofs

16 B. Water Conservation- Green Roofs

17 Heat Load or Cooling Requirements Reduction Exterior sun screen “wood veil” Energy Conservation C. Energy Conservation GOAL SOLUTION APPLIED TECHNOLOGY

18 C. Energy Conservation- Sun Screen

19 C. Energy Conservation- Sun Screen

20 C. Energy Conservation- Sun Screen

21 C. Energy Conservation- Sun Screen

22 C. Energy Conservation- Sun Screen

23 C. Energy Conservation- Sun Screen

Census Bureau Headquarters LEED Certification Construction Management Association of America Sustainability Workshop 23 January 2009 Iris Amdur, LEED AP, Principal GreenShape LLC

GreenShape Role ● Engaged by Skansa to help guide the implementation of project sustainability goals ● Provided technical guidance on LEED credits ● Reviewed LEED documentation ● Manage the LEED online submittal process to USGBC

Categories Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation in Design Credits Points Prereq LEED for New Construction V 2.1 All Prerequisites must be met in all categories to participate in LEED. Minimum number of points required for LEED rating: Certified 26-32, Silver 33-38, Gold 39-51, Platinum TOTAL

Categories Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation in Design Points Census Bureau LEED Credit Summary Project anticipates a LEED Silver rating, if all points are awarded. TOTAL

Census Bureau: Sustainable Sites ● SS pr1: Erosion & Sedimentation Control ● SS4.1 - Alternative Transportation, Public Transportation (1pt) ● SS4.2 - Alternative Transportation, Bicycle Storage & Changing Rooms (1pt) ● SS4.3 - Alternative Transportation, Alternative Fuel Vehicles (1pt) ● SS4.4 - Alternative Transportation, Parking Capacity (1pt) ● SS5.2 - Reduced Site Disturbance, Development Footprint (1pt) ● SS6.1 - Stormwater Management, Rate and Quantity (1pt) ● SS6.2 - Stormwater Management, Treatment (1pt) ● SS7.1 - Heat Island Reduction, Non-Roof (1pt) ● SS7.2 - Heat Island Reduction, Roof (1pt)

Census Bureau: Water Efficiency ● WE1.1 - Water Efficient Landscaping, Reduce by 50% (1pt) ● WE1.2 - Water Efficient Landscaping, No Potable Use or No Irrigation (1pt) ● WE3.1 - Water Use Reduction, 20% Reduction (1pt) ● WE3.2 - Water Use Reduction, 30% Reduction (1pt)

Census Bureau: Energy & Atmosphere ● EApr1: Fundamental Building Systems Commissioning ● EApr2: Minimum Energy Performance ● EApr3: CFC Reduction in HVAC&R Equipment ● EA1 - Optimize Energy Performance (1pt) ● EA3 - Additional Commissioning (1pt) ● EA4 - Ozone Depletion (1pt) ● EA6 - Green Power (1pt)

Census Bureau: Materials & Resources ● MRpr1: Storage & Collection of Recyclables ● MR2 - Construction Waste Management, Divert 50-75% (1pt) ● MR4 - Recycled Content, 5-10% (p.c. + 1/2 p.i.) (2pts) ● MR5.2 - Local/Regional Materials, 10% harvested regionally (1pt)

Census Bureau Indoor Environmental Quality Credits ● EQpr1: Minimum IAQ Performance ● EQpr2: Environmental Tobacco Smoke (ETS) Control ● EQ1 - Carbon Dioxide (CO 2 ) Monitoring (1pt) ● EQ2 - Increase Ventilation Effectiveness (1pt) ● EQ3.1 - Construction IAQ Management Plan, During Construction (1pt) ● EQ3.2 - Construction IAQ Management Plan, Pre-Occupancy (1pt) ● EQ4.1 - Low-Emitting Materials, Adhesives & Sealants (1pt) ● EQ4.2 - Low-Emitting Materials, Paints (1pt) ● EQ4.3 - Low-Emitting Materials, Carpet (1pt) ● EQ5 - Indoor Chemical & Pollutant Source Control (1pt) ● EQ6.2 - Controllability of Systems, Non-perimeter Spaces (1pt) ● EQ7.1 - Thermal Comfort, Comply with ASHRAE (1pt) ● EQ7.2 - Thermal Comfort, Permanent Monitoring System (1pt)

Census Bureau Innovation Credits ● ID1.1 Innovation in Design: Low-emitting Furniture (1pt) ● ID1.2 Innovation in Design: Exemplary Performance EA 6 (1pt) ● ID1.3 Innovation in Design: Education & Outreach (1pt) ● ID1.4 Innovation in Design: Green Housekeeping (1pt) ● ID2 LEED™ Accredited Professional (1pt)

LEED and the Construction Manager ● Involve CM in developing project LEED/Design strategy ● Bundle green building systems during cost estimating ● Establish LEED Action Plans during design and refine as job is bid/bought ● Communicate LEED requirements to subcontractors prior to bid and during construction ● Track and Document LEED as you go ● Issue frequent LEED progress reports ● Put LEED on the Construction Meeting Agenda monthly

Questions 35