Ltd. ACN 003 026 243 www.infomedia.com.AU Datacentre Design Guy Bryant 27 July 2004 www.infomedia.com.au.

Slides:



Advertisements
Similar presentations
1 UNIVERSITIES of AUSTRALASIA BENCHMARKING RISK MANAGEMENT BILL DUNNE DIRECTOR RISK MANAGEMENT UNSW. PROUDLY SPONSORED BY UNIMUTUAL.
Advertisements

Enabling more sustainable societies How can Vodafone contribute?
Managing IT Risk during a Global Business Merger Cheryl Danson April 2005.
Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
Options appraisal, the business case & procurement
Strategic Workforce Planning
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Green Datacenters solution March 17, 2009 By: Sanjay Sharma.
6 th International Venture Capital Forum Athens, June 14 th 2005 Last years success story Konstantinos Zygouras – Vice President & Managing Director.
Assess > Plan > Deliver > Sustainon365.co.uk. Assess > Plan > Deliver > Sustainon365.co.uk Electrical Review PowerOn Briefing You cant save money until.
Measuring a Web Project's Financial.
Water Utility Business Applications. 2 Agenda Industry overview and trends Our application visionary solution Business values Wireless network components.
Low Cost, High Innovation Efficiency in the Built Environment Brandon Fletcher, CFA Co-Founder Green Analytics.
PRETON PRESENTATION PRINT COST SAVING (PCS) TECHNOLOGY PRETON - PRINT AND SAVE February 2006.
ITIL Information Technology Infrastructure Library.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Better business outcomes equal better.
First Solar FuelSmart™: Powering Energy Security
UNFCCC Workshop on Innovative Options for Financing the Development and Transfer of Technologies September 2004 Private Sector Perspectives on Risk.
Colonial Life IT Modernization Overview Alan Whelchel Assistant Vice President Global Business Technology UNUM / Colonial Life.
WHICH TO CHOOSE RIGHT SERVER FOR THE RIGHT JOB. Today’s business environment demands that small and midsize businesses do more with less. The large majority.
OCD Internal and Education and Training Purposes Only A New Approach for You to Create Broader, Long-term Customer Engagements CL12092.
On-Demand Architecture for Network-Critical Physical Infrastructure
Mid-West Electric Consumers Association Board Meeting Mark A. Gabriel Administrator.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
VSE Corporation Proprietary Information
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
InfraStruxure for Small IT Spaces Solution Introduction.
Energy Management in Brazil August 9th, 2011 Rio de Janeiro | RJ By: Pedro Paulo da Silva Filho | Grupo SAGE Desenvolvimento: SAGE US – Brazil Industrial.
Citrix Partner Update The Citrix Delivery Centre.
Enterprise Resource Planning (ERP) Systems
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Current trends in data centre outsourcing
The Role of Communications in Mining Innovation Mining Automation Remote Operations & Control Critical Communications About Us.
An Overview of Our Regulatory Proposal
Attracting appropriate user funding in the context of declining public funding.
Connectivity Week Santa Clara Convention Center May 23, 2011.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Ltd. ACN Datacentre Design Guy Bryant 25 May
BENEFITTING FROM GREEN IT – FINDINGS FROM THE SUSTEIT PROJECT Professor Peter James
The Citrix Delivery Center. 2 © 2008 Citrix Systems, Inc. — All rights reserved Every Day, IT Gets More Complex EMPLOYEES PARTNERS CUSTOMERS.
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
Introduction to EMC.  Data Centre physical infrastructure specialist  Technical environment M&E.
1 November 2008 David Hall Sales Manager – New Business Data Centre Hosting for the M-Business.
What is Ubiquity™? ubiquity (noun): the state of being, or seeming to be, everywhere at once Ubiquity™ is a powerful building management system that.
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
Retro-fitting Commercial Buildings A Financing Perspective Date: April 2011 Prepared by: Carbon Solutions Group.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
Virginia Information Technologies Agency Green Technology Initiatives
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Jon Walton Director of Technology Bay Area Technology Forum November 5, 2009 Technology Consolidation: Fact or Fiction.
Service Level Agreements Service Level Statements NO YES The process of negotiating and defining the levels of user service (service levels) required.
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Rob Boyer Associate, AECOM. Heat Innovation - Changing the way we think about delivering heat Rob Boyer, Associate Director Infrastructure and Sustainability.
GRID INDUSTRY DAY Catania – October 2006 Alessio Nava IT Division Manager – RITTAL ITALY.
Head in the Clouds, feet on the ground David Massey Chief Technology Officer.
Staying Ahead of the Curve IFM Outsourcing pushes the envelope on energy savings Chris Pesek, Managing Director Integrated Facilities Management, JLL.
Copyright © 2013 OneNeck IT Services Corporation. All Rights Reserved. 1 Cloud Enablement For Microsoft Dynamics Cloud Enablement for Dynamics AX and Use.
NTIS and Data Mining. NTIS Mission Promote Commerce and Federal data priorities Open access and open data Data services to public, industry, agencies.
MarketsandMarkets Presents MarketsandMarkets Presents Mobile datacenter-Micro Datacenter Market worth $20 Billion by 2018 Mobile datacenter-Micro Datacenter.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Green IT Focus: Server Virtualization
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
Enterprise Architecture at Penn State
Enterprise Resource Planning (ERP) Systems
Presentation transcript:

Ltd. ACN Datacentre Design Guy Bryant 27 July

Datacentre Design Successfully Implementing Your Datacentre Guy R. Bryant PMP, Director Technology © 2004 Infomedia Ltd, Sydney Australia APC Infrastruxure -

Infomedia Ltd Copyright 2004 Background Infomedia is: Australian based, Global provider of Electronic Parts Catalogues to the Automotive Industry Australian provider of computer driven Financial Systems to Dealer Franchises (Dealer Management Systems) Staffed by 250 employees in four capitol cities of Australia plus International offices in the UK, USA and Mexico

Infomedia Ltd Copyright 2004 A Global Provider of Electronic Parts Catalogues

Infomedia Ltd Copyright 2004 Headquartered in Australia, Global Support Offices

Infomedia Ltd Copyright 2004 The Challenge Business Growth Company Established 1991, Listed on ASX 2000 Producing ~100k DVD/CDs per month for WW dist. Narrabeen Campus staff space outgrown, –Added Two New Sites in 2001 –Added New Datacenter in 2001 –Added New Corp HQ + Datacenter in 2004 Servicing 10,000 seats in ASP financial model $6.5- 7m/day in customer revenue Company Staff Growth of % per annum High growth + High availability requirements

Infomedia Ltd Copyright 2004 The Requirements Technology Infrastructure Build and plan/prepare for large growth in IT/ASP services. Ensure High Availability Ensure Security of Data transaction processing ‘Crystal-Ball’ future (2yr) power requirements against technological improvements. Do all this in 6 months beginning 2003 with sensitivity to Capital and on-going Operational costs with adequate capacity to carry 24 months until ‘Final Bunker’ built Plan for Bunker, establish Strategic direction

Infomedia Ltd Copyright 2004 The Process Steps Evaluate Requirements –Centralised Management –Physical and Logical security –7x24 Monitoring of environment and systems –Lowest possible Capital/Operational costs –Ensure ability for Failover and Independent Operations Evaluate Technology Options –Innovative (InfraStruxure ™) –Traditional (Over engineer, Power, UPS, HVAC, Space)

Infomedia Ltd Copyright 2004 Traditional Approach Steps: Bricks and Mortar Space built with 5+ year view HVAC Installed for entire space volume –General space must be cooler to ensure racking is kept within specified environmental limits (Temperature and Humidity) –Redundancy imperative Power engineered for 3+ year view UPS + Redundancy engineered for 3+ year view –Typically supplied throughout Datacentre –All servers/services treated equally Environmental Monitoring established –Typically monitors entire environment as a whole Fire Detection and Suppression engineered for whole space Physical Security established

Infomedia Ltd Copyright 2004 Steps: Bricks and Mortar Space built with 5+ year view HVAC Installed for current rack space volume only Normal/ergonomic environmentals for People space while Computer environmentals in Computer space Redundancy as required Power engineered for 3+ year view UPS + Redundancy engineered for Current year Typically supplied as business dictates Ability to address specific rack/server/service requirements Environmental Monitoring established Granularity to specific locations in Racks (H,M,L) Fire Detection and Suppression engineered for whole space Physical Security established InfraStruxure ™ Approach

Infomedia Ltd Copyright 2004 InfraStruxure ™ Key Advantages o Significant reduction in Cost-of-Ownership (CoS) 1.Reduction in initial capital expenditures, UPS/HVAC (Spend/build as the business requirements dictate/justify) 2.Significant reduction in operational costs (Electric) Cooling < 60% less space to condition for computer environmentals UPS power and redundancy delivered to mission critical systems. o ‘Green’..Reduces.92kg CO2 per Kwh of energy savings (ACT/NSW conversion) oStaff friendly…Staff environment at ‘normal’, No Sparkie! oBusiness/Technology driven granular monitoring oPower outlets remote controlled (Remote power cycling) oIntegrated Web Mgt oSNMP environmental monitoring/notification

Infomedia Ltd Copyright 2004 Benefits Enterprise Benefits: Cost Reduction Potential for reduction in Product costs Low risk with Integrated N, N+1, 2N failover Common Skills Staff Datacentre environment ‘normalised’ Modular Growth Granular environmental monitoring Remote Power cycling Power Load balancing/metering at the PDU level

Infomedia Ltd Copyright 2004 My most personal assets are protected by APC Beer Fridge

Infomedia Ltd Copyright 2004 Future Actions Key Activities: Establish ‘new’ baseline Work with APC to plan and configure new Infomedia ‘Bunker’ based on ‘new’ baseline Validate savings estimates Build it

Thank You from Guy Bryant & Infomedia