WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.

Slides:



Advertisements
Similar presentations
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Advertisements

Why does ERA Need to Flourish
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
Basic VENet Model Description of the model with a practical example Judith Riessner, TCA Secretary.
Stop. Think. Connect. National Cybersecurity Awareness Campaign October 2010.
EXIOPOL Presentation March Presentation of the IP Agenda Introducing EXIOPOL –IP project –Objectives –Implementation plan –Structure.
UNITED NATIONS Shipment Details Report – January 2006.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
European Reanalysis and Observations for Monitoring Take time to think about the key conclusions of the project and how to report the outcomes.
BlackSea Region Meeting Varna National Reports on Spatial Planning for Coastal Zones and Maritimes Areas Terms of Reference.
By Susan Toben Ministry for Labour, Building and Regional Development M-V Germany Lead Partner ICZM Strategy Development Process The PlanCoast Input from.
BIOMASS FUTURES: Bioenergy Use in the EU Member States – Cumulative Projections from the NREAPs and the associated implications Bogdan ATANASIU
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
The Future of the Strategy with regard to the Outermost Regions - Brussels, 15 May 2008Note: document not legally binding 1 José RUIZ ESPI RTD.K.3 New.
Regional responses to the Europe 2020 Strategy with particular focus on energy efficiency – Hungarian case.
1 State of play Evaluations undertaken for DG REGIO.
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
process information Identifying Green Jobs - Adapting Statistical Classifications International Conference on Green Growth and Official.
Richmond House, Liverpool (1) 26 th January 2004.
WI COMMODITY ORDERING SYSTEM. Accessing the Orders Tab.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
My Rights – My Voice Training by Persons with Disabilities to Staff on UNCRPD (10/ /2014) Communication Plan & Dissemination Strategy Kick off meeting.
1 Methodology to model the future energy scenario for China Kejun JIANG Energy Research Institute, China UNFCCC Workshop on emissions.
Local Renewables Freiburg 2007 June 14, 2007 Tobias Kelm Centre for Solar Energy and Hydrogen Research Renewable Energy Law: Stimulating Investment in.
UK enabling Legislation Renewable Energy Strategy.
The European Lighting Industry Position on How to Maximise the Potential Benefits of European Policy on Energy Efficiency in Lighting January 2008.
VOORBLAD.
STATE OF TRANSPORT CLIMATE CHANGE ADAPTATION ACTIONS IN EEA COUNTRIES, RECENT EXPERIENCES Natalia Sobrino (TRANSyT- UPM) ETC/CCA Task Adaptation.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
MOVIDA – MOVing from Inspection to Domestic Advice by service companies MOVIDA – MOVing from Inspection to Domestic Advice by service companies MOVIDA.
1 st Review Meeting, Brussels 5/12/12 – WP7 (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 WP7 Business Models, Assessment.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Contract N°: IEE/08/425/SI Duration: 28 months ( ) Coordination: O.Ö. Energiesparverband June 2006 Solar Process Heat SO-PRO
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting Zuzana Matlonova Brussels – April 11th, 2013.
Supported by WP4: Assessment of national RES-H/C Policy Options Methodology, detailed working plan, distribution of work 2. Project.
Addition 1’s to 20.
West Balkan Workshop on Waste 7 November 2008 Under contract with the European Environment Agency Christian Fischer Senior Consultant EU as a Recycling.
Test B, 100 Subtraction Facts
Technology for a better society Market4RES WP5: Modelling of electricity market design & Quantitative evaluation of policies for post 2020 RES-E targets.
Week 1.
Weekly Attendance by Class w/e 6 th September 2013.
Analytical Evidence on Research & Innovation in the Danube Region Progress of WP4 Vienna, Béla Kardon, PhD; RCISD
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Meeting, March 2009.
RES-H Policy WP4: Assessment of National RES-H/C Policy Options 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
State of the Art in Theory and Practice of Rural Development Measures Partner 4: The University of Wales Aberystwyth.
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
BIOMASS FUTURES: Biomass role in achieving the Climate Change & Renewables EU policy targets. Demand and Supply dynamics under the perspective of stakeholders.
Kick off meeting 1 Innovation Energie Développement CAP REDEO February 07 CAP REDEO GIS TOOL FOR RURAL ELECTRIFICATION PLANNING VIENTIANE APRIL 2007.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
WLE Strategy Results Framework. Challenges that we have been tasked with CGIAR process to develop coherent IDOs Developing a coherent a logical frame.
ENTRANZE Policies to enforce the Transition to nearly zero energy buildings in the EU-27.
SC. Asia Project Training on Developing National Action Plans on Sustainable Consumption Adriana Zacarias & Fu Lu UNEP SC. Asia Project 17 March 2005 Manila.
Future outlook and next steps for ESPON The ESPON 2013 Programme OPEN DAYS Bruxelles, 10 October 2007.
Large Combustion Plants Ex-post assessment of the LCP Directive Initial ex-ante evaluation of the IED – Chapter III and BAT Daniel Martin-Montalvo Alvarez.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
LandesEnergieVerein Steiermark (Energy Agency of Styria) MOVIDA WP 3 Training – Working Plan.
Development and Energy in Africa
Presentation transcript:

WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008

2 Determine options for 2020/2030 RES-H/C targets and their trajectories in the seven target countries/regions. Involve national stakeholder and in particular policy makers in that process Split up the target into different energy sources, technologies and sectors Assist member states in setting up sector- specific targets in the national action plans. WP3 - objective

3 GR LT NL PL UK AT (Upper-Austria, Styria/national level?) Target countries

Analysis of existing RES-H/C scenarios and potentials 3.2. Top-down assessment of RES-H/C targets 3.3. Bottom-up approach to determine RES-H/C targets 3.4. Production of target reports 3.5. Stakeholder dialogue Task overview

5 Timetable

6 Target report for each region (~ 50 pages each, national language and english) Month 10 (July 2009) Synthesis report of consultation process for each region (~10 pages each, national language and english) Month 9 (June 2009) Documentation of the consultation workshops (~5 pages each, national language and english) Month 10 (July 2009) Deliverables / Output

7 Review of regional / national / European studies Output: Dataset to assess possible RES-H/C market developments (BAU/policy scenarios?) Task 3.1 existing scenarios and potentials

8 Basic Structure for literature/scenario review: Time series for various scenarios and/or potentials: –RES-H/C generation by energy sources (biomass, solar, geothermal, ambient heat) –RES-H/C generation by sectors (residential (single dwelling, multiple dwelling, …), service sector, public buildings, industry, …) –RES-H/C generation by technologies (type of biomass boilers, type of solar collectors …) –Energy demand and efficiency improvements (building insulation), if available –Documentation of assumptions, methodology, background data

9 Task 3.1 next steps Each partner from target regions provides a list of relevant regional / national / (European) literature and scenarios with a few words describing the content (14 November 08) EEG (together with ISI) provides consolidated list and first draft of data structure (28 November 08) Each partner fills in scenario data into data structure (16 January 09) Documentation of literature / scenario review for the target report (each partner, end of January 09) All partners comment on the outcomes of task 3.1 (end of February 09)

10 Task 3.2 top-down Idea: in Task 3.1. different studies with different methodologies are the basis for the analysis. In this task: common methodology from a single model. Green-X model runs include scenarios for RES- H/C in each member state until Use previous model runs of Green-X to get reference scenarios for RES-H/C development.

11 Task 3.2 next steps Preparation and documentation of Green-X results (EEG, ISI, February 09) Discussion with partners (March 09)

12 Task 3.3 bottom-up Solar thermal: –Available roof area –Solar radiation data –Achievable solar fractions for different applications Biomass: –Available biomass potentials (e.g. EEA 2006) –Penetration rates in different types of buildings and applications Heat pumps: –Buildings with good thermal quality and low temperature heating systems –Number of those buildings (currently and dynamic) –(Large scale industrial heat pumps: penetration rates)

13 Task 3.3 bottom-up For buildings: integration of the results in the simulation tool INVERT For industrial processes: ECN- RES-HC model

14 Task 3.3 next steps Structure for regional/national data requirement (EEG, (ISI), 28 November 08) (ECN???) Data collection (each target region partner, January 09) Integration of regional data into models INVERT and RES-HC model (EEG, (ISI), ECN, March 09) Result documentation (EEG, (ISI), ECN, April 09)

15 Task 3.4 target reports Draft report: Synthesis of literature/scenario review (3.1), top-down (3.2) and bottom-up (3.3) Final report include outcomes of the stakeholder dialogue Target reports include technology and sector specific targets

16 Task 3.4 next steps Draft target report structure (EEG, November 08) Draft target report (all target country / region partners, April 09) Comments of all partners on draft target reports (May 09) Final target reports (all target country / region partners, July 09)

17 Task 3.5 stakeholder dialogue Stakeholder consultation: input / comments on findings of tasks 3.1, 3.2, 3.3 and draft target report (web-based questionnaire) Consultation workshops in each target region: reports on the consultation and the draft reports will be circulated at least 14 days before the workshop Target groups: –Policy makers (including representatives of national action plans for RES-directive) –Energy agencies –Companies / associations representing RES-H/C technologies –Researchers

18 Task 3.5 next steps Stakeholder information (all partners November 08) Preparation of questionnaire –Draft structure: EEG, March 09 –Web implementation: OEKO?, Mid of April 09 –Regional specification: each target region partner, End of April 09 Consultation process: each target region partner, May 09 Synthesis report of consultation: each target region partner, Mid of June 09 Consultation workshops: each target region partner, June 09 (July 09)

19 Timetable