1 LandesEnergieVerein Steiermark (Energy Agency of Styria) MOVIDA WP 3 Training – Working Plan

2 Heat pump systems as heating and/or cooling (air-conditioning) systems – They have often bad efficiency – Inspection is difficult because of many influence factors – But there is a large energy saving potential In which language should the trainings be developed ? MOVIDA WP 3 Training – Working Plan General issues to discuss

3 Short Training (about 4 hours): Target group: well educated O&M personnel, different in each member state Content: Appliance of the guideline for the inspections Method: Workshop Schedule – Start of development: As soon as the guideline is available – Implementation of the training: September 2011 in each member state MOVIDA WP 3 Training – Working Plan First Training Phase (Task 3.1, 3.2)

4 Only few examples to build on Guidelines for inspections out of HARMONAC project Recommendations for reducing cooling loads etc. Preparation for certification MOVIDA WP 3 Training – Working Plan Second Training Phase (Task 3.3, 3.4) Training for AC-inspectors Questions: Are there examples for trainings we can build on ? who will develop preparation for certification ?

5 1.Developing a curriculum for the courses in different modules. a.Basic module for the personnel who is not specialized in inspecting such AC systems. b.Module for analysis of the objects regarding possible reducing of cooling loads (HARMONAC) c.Module for the inspection of the AC-systems regarding control and adjustment of the whole system. (HARMONAC) d.special modules for the certification of inspectors in some member states MOVIDA WP 3 Training – Working Plan Training for AC-inspectors - working plan

6 2.Developing of a guideline for the inspections (HARMONAC) 3.Developing of scripts for the different modules 4.Developing of teaching materials (slides, e-learning- tools etc.) Schedule: 1.Starting as soon as possible (July 2011), to get inputs from project partners until autumn 2011 2.Implementing of the trainings in all partner countries in April 2012 MOVIDA WP 3 Training – Working Plan Training for AC-inspectors - working plan

7 Existing training-courses to build on integrate the experiences of the first inspection campaign. MOVIDA WP 3 Training – Working Plan Third Training Phase (Task 3.5, 3.6) Training for heating-system-inspectors Questions: Are there similar courses in the member states of other partners? Please give us inputs Are there examples for trainings we can build on ? who will develop preparation for certification ?

8 1.Developing a curriculum for the courses in different modules. a.Basic module for inspection of heating systems. b.Module for analysis of the objects regarding possible reducing of heat demand c.Module for the inspection of boilers d.Module for the inspection of heat pumps (?) e.Module for the inspection of the systems regarding control and adjustment of the whole system f.special modules for the certification of inspectors in some member states MOVIDA WP 3 Training – Working Plan Training for heating-system-inspectors - working plan

9 2.Developing of a guideline for the inspections (to build on the experiences of the first inspection campaign) 3.Developing of scripts for the different modules 4.Developing of teaching materials (slides, e-learning- tools etc) MOVIDA WP 3 Training – Working Plan Training for heating-system-inspectors - working plan Schedule: Starting Development in January 2012, to get inputs from project partners until March 2012 Implementing of the trainings in all partner countries in November 2012

10 MOVIDA WP 3 Training – Working Plan Thank you for your attention!


Download ppt "LandesEnergieVerein Steiermark (Energy Agency of Styria) MOVIDA WP 3 Training – Working Plan."