Doc.: 11-09-1057-00 Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.

Slides:



Advertisements
Similar presentations
Doc.: /04 Submission August 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Advertisements

Doc.: /05 Submission September 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on meeting the terms of Conditional.
Doc.: IEEE /0715r0 Submission July 2009 Stephen McCann (RIM) Slide 1 P802.11u Report to EC on Approval to go to Sponsor Ballot Date: Authors:
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: Submission1 IEEE Motions in November Plenary DCN: Title: Request for EC Conditional Approval Date Submitted:
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot Date: Authors:

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11v to Sponsor Ballot. This document (11-09/ ) was approved during the closing plenary session of the working group on September 25, –Passed in the Task Group x-y-z –Passed in the Working Group x-y-z

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 3 Requirements Met for EC Conditional Approval to advance P802.11v Draft 7.0 to Sponsor Ballot a)Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. –Condition Met. Recirculation ballot 155 completed on 07 August 2009, according to the schedule presented in ballot-request-presentation.ppt ballot-request-presentation.ppt b)After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new valid DISAPPROVE votes. –Condition Met. The approval percentage is 92.19%. There were no new valid DISAPPROVE votes. c)No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. –Condition Met. The comment resolutions in the last recirculation did not approve any changes to the draft.

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 4 Requirements Met for EC Conditional Approval to advance P802.11v Draft 7.0 to Sponsor Ballot d.No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters. –Condition Met. There are no DISAPPROVE comments from existing DISAPPROVE voters. One existing DISAPPROVE voter submitted and subsequently withdrew 3 submitted comments. e.If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the Sponsor. –Explanation: There are no required comments received that were determined to be invalid. There are 2 not-required comments associated with DISAPPROVE votes that were determined to be invalid. These were ruled invalid as they did not relate to draft text changed, draft text affected by changed text or an existing unsatisfied DISAPPROVE comment from a DISAPPROVE voter. LB155 comments are on Slide 6. f.The WG Chair shall immediately report the results of the ballot to the Sponsor including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale for ruling any vote invalid. –The ballot closed on: 7 August 2009 –The vote tally is: 177 Approve, 15 Disapprove, 38 Abstain –The comments associated with remaining disapproves are on the next slide

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 5 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved during working group ballot may be found in document: , a copy of this is attached, 000v-lb-150-comments.xls v-lb-150-comments.xls –Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 6 LB155 comments The LB155 comments may be found in document: , a copy of this is attached, see 000v-lb155-comments.xls v-lb155-comments.xls –Double click on the icon to the right to open this.

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 7 Post LB155 vote and comment changes from Clint Chaplin, changing his vote to “Approve with comment” –Bruce, –This is to officially change my vote status at this time on IEEE v to "Approve with Comments" –Clint (JOATMON) Chaplin from Qi Wang withdrawing LB 155 comments 10, 11, 12 –Dorothy, –I withdraw LB155 CID_12 and will resubmit it during the upcoming 11v sponsor ballot. –Qi Wang –Dorothy, –I withdraw my LB155 comments with CID-10 and CID-11 (as indicated in 09/929r1) and will submit them in the upcoming sponsor ballot. –Qi from Nakjung Choi changing his comment to “T” to “TR” – Hi, Dorothy. – Please change my LB155 comment from “TR” to “T”. – Thanks in advance. –Nakjung Choi from Yongho Seok changing his comment to “T” from “TR” –Please change my LB155 comment from “TR” to “T”. –Regards, –Yongho

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 8 TGv draft text stability Jan-07Jul-07Jan-08Jul-08Jan-09Jul-09 # pages AP MIB added

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide WG Letter Ballot Results – P802.11v Ballot ID Ballot Close Date TitleBallot TypePoolReturn%ReturnAbstain % Abstain Appr ove Disap prove %Appro ve Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Technical Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 Recirculation Jul 09 Second Recirculation Ballot for Draft 6.0 Post ballot results Recirculation Aug 2009 Third Recirculation for Task Group-v Draft 7.0 Recirculation Sept 2009 Third Recirculation for Task Group-v Draft 7.0 Post ballot results Recirculation

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide WG Letter Ballot Comments – P802.11v Ballot ID Ballot Close Date TitleBallot Type Number of Comments received Dec 2008Technical Letter Ballot for Task Group-v Draft 4.0 Technical586 (418T, 168E) 1464 Apr 2009Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation321 (225T, 96E) Jun 2009Second Recirculation Ballot for Task Group-v Draft 6.0 Recirculation140 (93T, 47E) 1557 Aug 2009Third Recirculation Ballot for Task Group-v Draft 7.0 Recirculation24 (12T, 12E)

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 11 TGv Timeline Third recirculation (TGv draft 7.0) Open 23-Jul-09 Close 7-Aug-09 Clean recirculation (TGv draft 7.0)25-Sep-0910-Oct-09 Pool formation17-Aug-091-Oct-09 First sponsor ballot5-Oct-094-Nov-09 Second sponsor ballot3-Feb-1018-Feb-10 Third sponsor ballot30-Mar-1015-Apr-10 Fourth sponsor ballot15-May May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SBJun-10 or Sep-10

doc.: Submission September 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 12 References