Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval."— Presentation transcript:

1 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-16 Authors:

2 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11u to RevCom. This document (11-10/0872r2) was approved during the closing plenary session of the 802.11 working group on July 16, 2010. –Passed in the Working Group x-x-x

3 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 3 IEEE 802 Sponsor Ballot Results – P802.11u DraftOpenedClosedDays Ballot Type PoolApproveDisapproveAbstainReturn D8.02009-10-82009-11-730Initial154106 [90%]12 [10%]*13 [10%]132 [86%] D9.02010-4-82010-4-23151 st Recirc 154115 [92%]10 [8%]**13 [10%]140 [90%] D10.02010-6-232010-7-08152 nd Recirc 154120 [94%]7 [6%]*14 [10%]142 [92%] D10.0a2010-6-232010-7-08152 nd Recirc 154123 [97%]4 [3%]***14 [10%]142 [92%] D10.0a indicates post ballot changes * Includes one commenter with no comments ** Includes two commenters with no comments *** Since ballot close, 3 of the 7 commenters have indicated vote change to “Yes/Approve”

4 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 4 Mandatory Coordination Coordination EntityDraftDateStatus IEEE-SA Editorial (MEC)D7.0July 09“Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Not required Registration Authority Committee (RAC) Not required

5 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S.McCann (RIM), B.Kraemer (Marvell) Slide 5 Comments by Ballot – P802.11u DraftBallotNot RequiredSatisfied Known Unsatisfied Assumed Unsatisfied Total D10.0Recirc 27302075 D9.0Recirc 1596633131 D8.0Initial19013907336 Total322175510542

6 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 6 CommenterD8.0D9.0D10.0Total Stephen Palm (Broadcom)* 73 10 Gabor Bajko (Nokia) 213 Clint Chaplin (Samsung) 112 Jon Rosdahl (CSR) Total76215 Unsatisfied Comments by Commenter * Assumed unsatisfied, no response to repeated e-mails to commenter

7 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 7 Vote Changes since last ballot I From: Christopher Hansen [mailto:chansen@broadcom.com] Sent: 13 July 2010 22:51 To: Stephen McCann Subject: Re: 11u sponsor ballot I'll change my vote to yes. Chris ==================================================================================== From: WORSTELL, HARRY R (HARRY R) [mailto:hworstell@research.att.com] Sent: 15 July 2010 13:53 To: Stephen McCann Subject: Sponsor Ballot Vote on IEEE 802.11 "u" Stephen, As my only comment left on the IEEE 802.11 TG u Sponsor ballot that constituted my Do Not Approve vote was answered in document 11-10-0898-00-000u, I now change my vote to Approve. Best regards, Harry

8 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 8 Vote Changes since last ballot II From: "Venkatesan, Ganesh" Date: Thu, 15 Jul 2010 18:22:27 -0700 To: Stephen McCann Subject: FW: TGu negative voter Hello Stephen: I am satisfied with resolutions to all my sponsor ballot comments on TGu. I write this mail to inform you that I change my vote on the TGu to “APPROVE”. Thanks for your patience and diligence in addressing all concerns in a fair manner. I really appreciate it. Cheers -- ganesh

9 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 9 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. –Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

10 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 10 TGu Timeline Recirculation (TGu Draft 11.0) Open 2010-07-23 Close 2010-08-02 Recirculation (TGu Draft 12.0)2010-08-162010-08-26 Recirculation (Unchanged 12.0)2010-08-282010-09-07 EC to RevCom2010-07-16 RevCom Submission2010-09-13

11 doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 11 802.11 EC Motion – Conditional Approval to send P802.11u to RevCom Request the IEEE 802 Executive Committee for conditional approval to forward P802.11u D12.0 to RevCom. Moved: Bruce Kraemer 2 nd : –Yes No Abstain WG vote on the Motion Passed: xx y, x n, x a


Download ppt "Doc.: IEEE 802.11-10/0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval."

Similar presentations


Ads by Google