CMS Week March 2005 www.te.rl.ac.uk/esdg/cms-fed/qa_web 0 presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.

Slides:



Advertisements
Similar presentations
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
Advertisements

CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
John Coughlan et al.Rutherford Appleton Laboratory14th May 20023rd CMS Electronics Week Tracker Front-End Driver Progress Report 3rd CMS Electronics Week.
Questionnaire Response
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
GCT Source Card Status John Jones Imperial College London
Tracker Strip and Pixel FEDs John Coughlan Tracker Readout Upgrade Meeting September 12 th 2007.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Tracker Summary Alan Bross MICE CM October 10, 2007.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Status of NA62 straw electronics Webs Covers Services Readout.
Tracker Week 11th February CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Tracker Week 21st April CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
TEL62 update Franco Spinella INFN-Pisa 28/3/2012 CERN- TDAQ WG.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Chris Booth Sheffield 29th March 2006
LKr status R. Fantechi.
CCS Hardware Test and Commissioning Plan
Update on CSC Endcap Muon Port Card
TTC System Status May 2007 System overview Production Status
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans

CMS Week March FEDv2 Pre-Series Q3/2004 : Manufacture and commission first 2 FEDv2s. Both at CERN. Q4/2004 : Prepare pre-series production of 25 FEDv2 boards. Final tests of FEDv2 design: Fine tuning of Front-End analogue passive components. Change Rload = 62R (now verified on FEDv2). Q1/2005 : Pre-series of (to verify full VME crate operation and then deliver to LSA centres)  5 boards delivered to RAL during Tracker week Feb. 4 boards are good. ( 1 sent to CERN, 1 at Imperial ) 1 board traced damaged BGA sent back for rework  10 further boards arrived end of last week under test.  10 remaining boards expected this Friday. Summary: Pre-series proceeding to original schedule. 3 FEDv2s now at CERN. A few more could be sent before May. Larger deliveries after Full Crate Test. FEDv1s Upgrade FEDv1s (minor mod to be compatible with FEDv2, except no S-LINK). 2 boards returned in February upgraded and pass system tests.

CMS Week March Full Crate Test at RAL To verify operation ~ 16 FEDs. And later for production tests with slink/optical/ttc systems. Received Rack (arranging for chiller) TTC interface to FED Tester ready by Easter Software ready to test now Additional Equipment still needed in April 2nd LHC 9U Crate & SBS Crate Controller adapter (PCI-X) And will need (1+1) more crates for Assembly plant tests starting this summer FED Tester Crate + FED Crate

CMS Week March Other Items Further soak tests of SLINK readout in extreme data rate conditions. Finalised design of 6U VME SLINK Transition card this month. Making 6 off. SLINK cables (see talk by Attila) Several improvements to FED firmware ready needed for final CMS operation (updated Technical Document). New unambiguous FED channel numbering scheme adopted (suggestion by Francois to match optical cabling) Other equipment CAEN interfaces, 6U->9U adapters ? TTC splitters, switch to single mode fibres ; switch to TTCci? B904 preparations ?

CMS Week March FED Final Production Final Production Schedule Q3/2004 : EU Tender for PCB & Assembly. Done. Q4/2004 : Company selection (DDi Technologies Europe Ltd). Done. Obtain Quotes including CMS custom Testing at Assembly plant. Done. Q1/2005 : Submission to CERN Finance Committee. Not required. Arrange procedures between CERN (on behalf of CMS FAs) and RAL. In progress. Q2/2005 : Sign formal contract with DDi. Starts procurement. Meeting on 21st March. Q3/2005 -> Q3/2006 : Manufacture 500 ~ 50 / month. Fully test boards in UK. At Assembly Plant and at RAL. Ship to CERN B904; re-test full crates and store until USC55 available.

CMS Week March FED Status

CMS Week March FED web pages

CMS Week March End Last Slide