Project focus areas FY20+ Potential contract opportunities

Slides:



Advertisements
Similar presentations
D. Y. Patil Collage of Engg & Tech.
Advertisements

BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Electrical and Mechanical Aspects of Dam Safety
SAME “Meet the Chiefs” Don Erickson, P.E., PMP
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
US Army Corps of Engineers BUILDING STRONG ® Gary Hinkle, PE June 10, 2014 Mid-West Electric Consumers Association Board of Directors Meeting Sylvan Lake,
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
Yards Creek Rotor Poles
HYDRO-ELECTRIC POWER PLANT Prepared by SREEJITH K. & NICE MENACHERY APME APME JEC JEC.
Columbia River Lock Users Meeting Portland District Corps of Engineers August 14, 2007 US Army Corps of Engineers Portland District Portland District.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
Pacific Northwest Waterways Association 2008 MID-YEAR MEETING Inland Project Report: Little Goose, Lower Monumental, the PSMP and the Five Year Funding.
US Army Corps of Engineers BUILDING STRONG ® Seattle SAME “Meet the Chiefs” COL Steve Miles, P.E., PMP 21 June, 2011.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Small and Large Business Federal Opportunities Meet the Chiefs Workshop June 3, 2015.
Energy Resources Nonrenewable.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
SAME “Meet the Chiefs” LTC Shawn Patrick Deputy Commander
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District SAME 21 June 2011 David A. Caldwell, Lieutenant Colonel Commander and District Engineer.
June 2006 Middle Fork Project Project Maintenance June 20, 2006.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
HYDRO POWER PLANT
Alternative Energy Sources Hydroelectric, Geothermal, Wind.
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
Middle Fork Project Potential Project Betterments October 1, 2007.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
1. A generating station which utilized the potential energy of water at a high level for the generation of the electrical energy is known as a hydro-electric.
Touchet Consolidation Washington Department of Fish and Wildlife.
You can type your own categories and points values in this game board. Type your questions and answers in the slides we’ve provided. When you’re in slide.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
Electric Generators: supply electrical energy!
City of Gainesville Facilities Management Department Citizen’s Academy April, 2016.
Assoc. Prof. Dr. Tarkan Erdik
Customer fund program update
Micro-hydro Understand the fundamental principles and
CEDAR SPRINGS DAM IMPROVEMENTS
Assoc. Prof. Dr. Tarkan Erdik
Highveld Industrial Park Storage Warehouse No. 3
RECLAMATION Power O&M Program Great Plains Region
Engineering Technology Division
Dworshak FPOM Tour March 8, 2017 File Name.
RECLAMATION Power O&M Program Great Plains Region
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Presented by: Sandra Easter
Siskiyou Power Authority
East Carolina University Compressed Gas Safety Training Program
AVIAN ABUNDANCE AND DETERRENT MEASURES AT NWD DAMS
UNIT 8 CANAL HEAD WORKS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
Hydro electric (Hydel) Power Plant
Illinois Waterway 2020 Consolidated Closure
Avian Task Group Bob Cordie Biologist The Dalles Lock and Dam
Hydro electric (Hydel) Power Plant
Ladner Harbour.
Hydraulic Structures HYDRAULIC STRUCTURES.
Bellringer What is one form of biomass? How do we use it for energy?
Nonrenewable Resources
Maintenance.
Presentation transcript:

Project focus areas FY20+ Potential contract opportunities

Dworshak Dam Hydropower: Regulating Outlet Valve Upgrade, FY20 Intake Gantry Crane Replacement, FY20 Tailrace Gantry Crane Rehab, FY20 Bridge Crane Fall Protection Upgrade, FY20 General: Boiler Upgrades, FY21 Smolt Release Pipe Repairs, FY21 Life Safety Alarm System, FY22 Supplies/Services (FY20): Bald Eagle Survey Sanitation Services Unleaded Fuel Supply Janitorial Services Elevator Maintenance

lower granite lock and dam Hydropower: Trashrake Crane and Rake Upgrade, FY20 Turbine Maintenance Platform (Supply), FY20 Isophase Bus Refurbishment, FY20 Powerhouse Annunciation and Controls, FY21 Unit 2 Blade Sleeve Upgrade, FY22 Life Safety Fire Alarm System Upgrade, FY22 General: Navigation Lock Miter Gate Inspection and Bird Netting, FY20 Levee System Drainage Lines Repairs, FY20 Irrigation Pump (Supply), FY20 Weed Control (Service), FY20 Janitorial Services, FY20 Access and Walkway Improvement, FY21 Navigation Lock Tainter Valves, FY22

LITTLE GOOSE lock and dam Hydropower: Trashrake Crane and Rake Upgrade, FY20 DC System & Low Voltage Switchgear Replacement, FY21 Powerhouse Annunciation and Controls, FY21 Powerhouse Roof Replacement, FY21 Life Safety Fire Alarm System Upgrade, FY22 General: Juvenile Fish Facility Standby Generator, FY20 Barge Dock Fender Repairs, FY20 Navigation Lock Leak Repair, FY20 Workboat (Supply), FY20 Pest and Weed Control, FY20 Tugboat Services Contract, FY20 Navigation Lock Tainter Valves, FY21

Lower monumental lock and dam Hydropower: Spare Transformer Containment Pad, FY20 Isophase Bus Refurbishment, FY20 Bridge Crane Wheel/Drive System Upgrade, FY20 Powerhouse Annunciation and Controls, FY21 DC System & Low Voltage Switchgear Replacement, FY22 Life Safety Fire Alarm System Upgrade, FY22/23 Tailrace Stop Logs, FY22 Iso Phase Bus/Housing Upgrade (Supply), FY23 General: Spillway Gate Gear Reducer (Supply), FY20 Coffer Cell Repair, FY20 Compressed System Upgrade, FY20 Vertical Barrier Screen (fish) Upgrade (Supply), FY20 Navigation Lock Tainter Valves, FY22 Navigation Lock Electrical System Upgrade, FY22

ice harbor lock and dam Hydropower: Oil/Water Separator, FY20 Intake Gate Gantry Crane Controls, FY20 Station & Main Unit Air Dryers (Supply), FY20 Cathodic Protection (Supply), FY20 Intake Gate Hydraulic System Upgrades, FY21 Powerhouse Annunciation and Controls, FY21 Exciter Control Upgrade (Supply), FY22 General: Floating Guide Wall Wire Rope (Supply), FY20 Park Attendant Service Contract, FY20 Pedestrian Security Gates, FY20 Spillway Backup Generator, FY22 Navigation Lock Upstream Gate, FY21+ Replace Fish Ladder Weir Gates/Hoists FY21+  

McNary lock and dam Hydropower: Powerhouse Controls, Exciters and Governors Upgrade, FY20 Sump Oil Skimmer, FY20 Intake Gantry Crane Replacement, FY20 Megger Protective Relay Test Set (Supply), FY20 Tailrace Gantry Crane Replacement, FY20 Station Service Turbine Repairs, FY20 Trash Rack Rehab, FY20 Spillway Gate and Hoist Upgrade, FY21 Isolated Phase Bus Upgrade, FY21 Powerhouse Drainage, Unwatering Upgrade, FY22 Life Safety Fire Alarm System Upgrade, FY22 General: Navigation Lock Derrick Crane Replacement, FY20 Spillway Gate Rehab, FY21 Levee Pump System Upgrades, FY21 Waste Water Connection, FY21 Navigation Lock Downstream Gate Fabrication/Replacement, FY21+ Navigation Lock Unwatering Pumps, FY23

mill creek dam Maintenance Building Upgrade, FY20 Road Upgrade/Improvements, FY20 Diversion Dam Low Flow Radial Arm Repair, FY20 Weed Control Services, FY20

lucky peak dam Guard Rails and Road Improvements, FY20 Office Building, FY22+

District Headquarters HQ Building Office Space Additions, FY20 District Managed Printer Services, FY20 HQ Landscaping/Xeriscaping (DB), FY20 District Spillway Gate Rehab/Upgrades, FY21+ District Head Gate Repair Upgrades, FY20 For more detailed information, please see: https://www.nww.usace.army.mil/Business-With-Us/Small-Business/ Contract Opportunities