CSC Electronics Installation and Commissioning CSCE I&C

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ELENA installation progress F. Butin / ELENA collaboration.
Integration and Services RE3/1 and RE4/1
Cabling for LHCb Upgrade
Technical Coordination Parallel Session November 2011, FNAL
Integration and Services RE3/1 and RE4/1
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
TileCal upgrade EVO meeting Demonstrator tesks
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
CMS November Upgrade Week
EMU Slice Test Run Plan a working document.
Jan Królikowski Warsaw University
Chamber Design and Integration RE3/1 and RE4/1
CSC Organization in 2013 Jay Hauser To be updated at
CMS RPC Endcap RE1 Status Report
Regional Cal. Trigger Milestone: Major Production Complete
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
Regional Cal. Trigger Milestone: Production & Testing Complete
RPC Detector Control System
New Calorimeter Trigger Receiver Card (U. Wisconsin)
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
RE3/1 & RE4/1 Parameter Space Services
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Electronics Installation and Commissioning CSCE I&C 19-April-05 CSC Electronics Installation and Commissioning CSCE I&C Fred Borcherding 11-Nov-19 PC I&C

YE+3 in UXC55 YE+3 sitting under lowering shaft 19-April-05 YE+3 in UXC55 YE+3 sitting under lowering shaft Lifting hardware being removed It fits Tower levels mate to balconies Hope to start CSC installation on disks in early January 2007 11-Nov-19 PC I&C

GAS Room Gas room is being prepared RPC Gas CSC Gas 11-Nov-19 PC I&C 19-April-05 GAS Room Gas room is being prepared RPC Gas CSC Gas 11-Nov-19 PC I&C

USC55 Work area and underground control room LV racks S2 S1 19-April-05 USC55 Work area and underground control room Table for laptops and work benches LV racks One for CSC S2 Electronics racks on right PC racks on left S1 Electronics racks Open space on right Future work space?? 11-Nov-19 PC I&C

USC55 Level S1 S1 Counting Room Ready for serious installation 19-April-05 USC55 Level S1 S1 Counting Room FED racks with doors And layout drawing HE1/1 with door HV racks with doors Ready for serious installation After Christmas shutdown 11-Nov-19 PC I&C

19-April-05 Schedule Milestones There are several ‘external events’ that drive our schedule Pre Lowering Now through movement to shaft Permanent work only within a disk, no disk to disk work Post Lowering (Dec-Feb) Arrival in UXC55 and movement to +Z end of pit Same as above but now have a moving target Disk positioned in UXC55 (Jan-Mar) In position at +Z end but no connections done May have special access problems Cable chain and ‘services’ to YE+1 (April) Cable chain and ‘services’ to YE+2 Cable chain and ‘services’ to YE+3 Ditto for –Z Most time here is pre-lowering Everyone’s schedule will be impacted by these Milestones Services ONLY through CABLE CHAINS include Power to turbines Power to LVPS Cooling water to racks and chambers Fiber Optic installation Dates with Milestones are gross guesses really & mine alone Milestones are for USC55 as well HV cannot be applied until cable chains and services connected to a disk LV cannot be applied … Fiber optic links cannot be installed … The pre lowering of –Z can be split into significant periods Now through finish DT installation No face work But scaffold on YE-1 DT finished through YB0 lowering May open somewhat for face work Scaffold? YB0 lowering through –Z Endcap lowering Wide open spaces SX5 is ours But once minus endcap starts its lowering it will probably be on critical path and not allowed much time to complete connections and commissioning 11-Nov-19 PC I&C

Work Lists Generic Pre Lowering for +Z Post Lowering 19-April-05 Work Lists Generic Pre Lowering for +Z Install in USC55 Install long cables from USC55 to UXC55 plus Post Lowering Whatever work can be done Disk positioned in UXC55 Work on racks Work on rack to CSC connections Work on PP to rack routings Cable chain and ‘services’ to YE+1 Connect from YE+1 hardware to USC55 Test this hardware Commission this hardware Cable chain and ‘services’ to YE+2 Same as above for 2 Cable chain and ‘services’ to YE+3 And for 3 Pre Lowering for –Z Install long cables from USC55 to UXC55 minus Work within each disk on surface Seriously consider what temporary services you will need to make full use of this time & to shorten time after lowering Peripheral Crate Electronics Pre Lowering for –Z Test TS4 (8,9) CSCs Other work finished!! Post Lowering Install bottom racks Disk positioned in UXC55 Continue work on racks Do PC I&C on bottom racks with LGB Install FO boxes and jumper cables on all racks Run LGB tester on all PCs Cable chain and ‘services’ to YE+1 Connect FO jumpers to modules When LV and Water available add to CSC Commissioning Cable chain and ‘services’ to YE+2 Same as above for 2 Cable chain and ‘services’ to YE+3 And for 3 Prepare final racks PC I&C in final racks with LGB Develop Little Green Barrack, LGB Incorporate ME1/3 Install temporary hardware for slice test Also do all steps above to +Z up to Cable … 11-Nov-19 PC I&C

Project Status Task Person Schedule BAR code FED S. Durkin yes yes 19-April-05 Project Status Task Person Schedule BAR code FED S. Durkin yes yes PC Computers S. Durkin yes - DAQ Farm S. Durkin yes - CSC & PC El M. Ignatenko yes yes LVPS A. Golyash yes no PCMB A. Golyash yes partial HV for ME1/1 V. Karjavine generic no HV A. Madorski generic yes Track Finder D. Holmes generic yes CSC Gas V. Andreev generic no (needed?) Alignment O. Prokofiev, V. Sknar generic yes Fiber Optics T.Y. Ling, F. Geurts generic no DCS B Clare generic - 11-Nov-19 PC I&C

19-April-05 No Balcony The balcony is missing on the near (+X) side at the far +Z end Opening to small shaft access from pit Will present access problems for work 11-Nov-19 PC I&C

Safety Underground Extra safety tips: Have a lamp on your helmet 19-April-05 Safety Underground Extra safety tips: Have a lamp on your helmet Learn your way around the labyrinth Take first aid training 11-Nov-19 PC I&C

Conclusion Beginning to look like an experiment 19-April-05 Conclusion Beginning to look like an experiment MTCC finished OK YE+3 lowered USC55 looking like an electronics room(s) Work will now take place on surface and underground SX5, UXC55 and USC55 Our detector has been split into two detectors Much different conditions for +Z and –Z ends -Z much the same as to now; cold, dirty and cramped all external connections to each disk are temporary +Z eventually ‘permanent’ connections but not a first new experience working underground 11-Nov-19 PC I&C