CSC Status Report Status reports;

Slides:



Advertisements
Similar presentations
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Advertisements

Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
University of Wisconsin
LKr status R. Fantechi.
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
CSC EMU Muon Port Card (MPC)
T1 Electronic status Conclusions Electronics Cards:
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
Electrical and electronic systems projects
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
The IFR Online Detector Control at the BaBar experiment at SLAC
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
CSC Turn ON Status Report by Fred B.
Pierluigi Paolucci & Giovanni Polese
Configuring the Peripheral Crates
Sector Processor Status Report
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
FED Design and EMU-to-DAQ Test
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

CSC Status Report Status reports; 19-April-05 CSC Status Report Status reports; Issues with System reliability and Maintainability (LV, HV, Electronics modules and crates, internal interfaces) External Interface reliability (Cooling, Power, TTC, DAQ) Prepared for CSC by Fred Borcherding FNAL 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 Overview Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares Issues with System reliability and Maintainability LV > Wiener Maraton system (air cooled) Problems with OPFC modules CANBus communication problems with Maraton units HV > Resistors Electronics modules and crates On-chamber Electronics Other Electronics internal interfaces External Interface reliability Cooling Power TTC DAQ 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

Status of Electronics > Installed 19-April-05 Status of Electronics > Installed Status of Electronics > Installed / Total at CERN / Good Spares Status of Crates and boards, how many are needed, how many are at CERN and how many are good spares The following few slides are included for completeness 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE 30520306050001xxxxx CFEB one type, 5(4) per chamber 2268 /?? /19 ALC 30520112030001xxxxx ALCT ME1_1 72 /?? / ?? ALC 30520112030288xxxxx ALCT288 ME1_3 72 /?? /10 ALC 30520112030384xxxxx ALCT384 ME1_2, ME234_2 214/?? /11 ALC 30520112030672xxxxx ALCT672 ME2_1, ME3_1, ME4_1 108 /?? /4 ALM 30520112130001xxxxx ALCT_MEZ one type, 1 per chamber 468 /?? /?? LVD 30521222040001xxxxx LVDB one type, 1 per chamber 468 /?? /?? LVM 30521222130001xxxxx LVMB one type, 1 per chamber 468 /?? /?? AFE 30520106050001xxxxx AFEB one type, many per chamber ?? /?? /?? NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards – these are not in the sums above 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC 305216030320050xxxx pcrate crate 75 /60 /15 CBP PC 305203021620050xxxx pcrate back plane 70 /60 /10 CRB PC 305203180220050xxxx pcrate regulator brd 88 /60 /28 PCM PC 305216031320060xxxx PCMB 79 /60 /19 ELM PC 305205121320050xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 CCB PC 305203030220050xxxx Clock and Control 84 /60 /24 DMB PC 305204130220040xxxx DAQ Mother Brd. 550 /468 /82 MPC Trigger PC 305213160320050xxxx Muon Port Card 70 /60 /10 TMB Trigger PC 305220130220050xxxx Trig Mother Brd. 570 /468 /102 RAT Trigger PC 305218012020050xxxx RPC ALCT Trns. 690 /468 /222 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 CSC HV HV ME1/1 > CAEN System installed /total /spares Cc HV1 3052## Crate 2 /2 /0 Cc HV1 3052## Board 16 /18 /2 HV > UF Custom System installed /total /spares HV UF Custom System installed /total /spares HDS 30520804192005xxxxx Distribution-36 126 /159 /33 HDL 30520804122005xxxxx Distribution-30 144 /173 /29 HDC 30520804032005xxxxx Distrib Crate 30 /34 /4 HDP 30520804162005xxxxx Distrib Patch 8 /9 /1 HMB 30520813022005xxxxx Master board 40 /48 /8 HMC 30520813032005xxxxx Master Crate 8 /10 /2 HPS 30520816192005xxxxx Primary HV src 8 /10 /2 HCC 30520803032005xxxxx Control comp 2 /3 /1 HLV 30520812222005xxxxx LV power supply 2 /3 /1 HMP 30520813162005xxxxx Master Patch 2 /1 /3 HLP 30520812162005xxxxx LV patch panel 2 /4 /2 HCP 30520803162005xxxxx Control patch 2 /4 /2 HPC 30520816032005xxxxx Primary HVPS ctr 2 /3 /1 (spare parts) 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 CSC Track Finder CSC TF installed /total /spares CCC Trigger TF 3052000000200500000 9U CAEN VME 1 /3 /1 0 Trigger TF 3052200603200500000 wiener crate ( trigger) 1 /2 /1 0 Trigger TF 3052200602200500000 TF backplane 1 /3 /2 DDU Trigger TF 3052 200500000 DDU 1 /2 /1 DDE Trigger TF 3052040405200500000 DDU extender 1 /3 /1 TSP Trigger TF 3052201916200500016 SP 12/17 /2 CCB Trigger TF 3052030302200500025 CCB 1 /3 /1 0 Trigger TF 3052000000200500005 muon sorter 1 /5 /3 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

ESSC Nov 2008 > CSC Status Report by Fred B. 19-April-05 CSC FED FED Crates > Wiener 9U VME installed /total /spares FED FED 3052060504200510000 FED Crate 4 /4 /0 (1 sp PS) FED Boards > OSU Custom Brds installed /total /spares CVC FED 3052032203200510000 CAEN 6U CC 4 /5 /1 One sent to CAEN for repair, good spare is loan from pool DCC FED 3052040303200510006 Clock and Control 4 /6 /2 2 more to be shipped to CERN DDU FED 3052040421200510032 Data Board 36 /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG 3052071419200510001 GBit Ethernet switch 8 /10 /2 (1 sp installed) 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

Issues with System Reliability and Maintainability 19-April-05 Issues with System Reliability and Maintainability LV > Wiener Maraton system (air cooled) Problems with OPFC modules The front panel switch has been a problem – the quick connect to the switch becomes unreliable Plan is to have the connection soldered after agreement with Wiener The Soft Start can fail and damage module Turning the power OFF and then back ON too quickly can cause the failure This is a feature of the slow ramp-down inside the module For now the fix is administrative Only experts cycle switches > with proper time interval observed Shifters instructed (& procedures) to switch ON only if they are found OFF > never cycle CANBus communication problems with Maraton units Recently observed > not yet diagnosed CANBus PC crashes – could be symptom or cause Note LV stays ON and hardware protections stay in place But DCS monitoring and software protections are lost Reboot computer Cannot communicate with Maratons Cycle power to Maraton(s) – see problem above Then communication can be restored Works BUT have to restart and reinitialize electronics for multiple crates plus 9 chamber per crate. Also cannot be done on the fly but requires time between runs. 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

Issues with System Reliability and Maintainability 19-April-05 Issues with System Reliability and Maintainability HV > problems with resistors in UF custom system A resistor is used for each channel to measure the exact voltage applied to that channel >> over 10,000 channels The resistor used has failed to retain its factory specifications The resistance moves up or down significantly over relatively short time periods This change can be calibrated out but would require re-calibration before each run We will replace these resistors during the coming shutdown Modules will be removed from tower racks in cavern Resistors will be swapped in the ISR clean room area QA, tests and calibrations will be carried out at ISR Modules will be re-installed The process will be carried out sequentially so that most of the HV for CSC is operational at all times. Electronics modules and crates On-chamber Electronics Old problem with fuses on ALCT boards is corrected Very limited access makes repair of ‘normal’ failures very difficult > thus we have an inventory of deferred interventions Other Electronics PROM issues for pcrate boards Program for onboard FPGA’s is stored in local PROM and reloaded at each hard reset These PROM’s loose their program with the result that the connected chamber is lost to the readout A reprogram of the PROM brings it back without problem But need to find a solution > being worked on internal interfaces > no issues 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.

External Interface reliability 19-April-05 External Interface reliability Cooling During CRAFT running the cooling on detector and in counting rooms has been reliable We are working to add additional DCS linked temperature sensors in CSC cavern racks to detect problems in a finer grained way and to monitor trends Power Power upstream of our LVPS has been reliable. TTC > no particular problems DAQ Occasionally the CSC FEDS have sent FMM warnings and errors generated by problem front-end boards Since the Central Trigger stops a run on an FMM warning or error we have disabled FMM reporting by our front-end boards This will result in a negligible loss of data We will review this decision when we are allowed access to fix the small number of boards CSC along with other systems have problems associated with start of run the source has been identified in the software and fixes will be implemented 6-Nov-08 ESSC Nov 2008 > CSC Status Report by Fred B.