Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
Advertisements

1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur X-Ray Optics October 12, 2004 X-Ray Prototype Optics Specifications John Arthur.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
John Arthur Mirror June 23, Effects of LCLS X-Ray Mirrors John Arthur Presenting work by Peter Stefan and Mike.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Coherent X-ray Imaging Instrument
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
LUSI Coordination with LCLS
Experimental Facilities Planning
Operation and Safety ART Review Harald Sinn.
DOE Review May, 2005 Steve Lewis
LCLS Instrument Development
LCLS Ultrafast Science Instruments
Proposed Offset Mirror System
Stefan Moeller – XES Manager May 14, 2009
Development of LCLS Far Experimental Hall Hutches
John N. Galayda – Director of LCLS Construction March 30, 2009
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
X-ray Pump-Probe Instrument
X-Ray Endstations Update
AMO Early Science Capability
Project Management Issues John N. Galayda, SLAC April 24, 2002
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
FEE Diagnostics and Commissioning
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
DOE Review 7-9 February, 2006 Steve Lewis
Photon Systems Breakout Lehman Review July 11, 2007
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
LCLS XTOD Mechanical and Vacuum Systems; Gas Attenuator
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Lehman Review February 7-9, 2005
Presentation transcript:

LCLS Photon Systems Overview John Arthur SLAC

New LCLS Organization Collects all X-Ray Activities into Photon Beam Systems

LCLS Photon Systems Includes LCLS x-ray and laser groups X-ray Transport, Optics and Diagnostics (XTOD) managed by LLNL (Richard Bionta) X-ray Endstation Systems (XES) managed by SLAC (Stefan Moeller) LCLS Laser Systems managed by SLAC (Bill White)

XTOD Scope Transport the x-ray beam, in vacuum, to all the experimental stations Condition the x-ray beam, with attenuators and apertures Analyze the x-ray beam, with sophisticated diagnostics

XES Scope The X-Ray Endstation Systems group provides the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely

Instrument MIE and XES A ~$50M MIE project has been proposed Will build 4 x-ray instruments for LCLS Instrumentation needs are becoming much more clear XES has decided not to build generic instrumentation but rather, LCLS will dedicate all project effort for experimental instrumentation to one area of science: Soft X-ray Atomic Physics (AMO)

Instrument MIE and XES Detectors LCLS experiments need new detector technology Dual development strategy for fast 2-d detectors Several technologies look promising, no clear leader LCLS will pursue one strategy MIE will try a different technology Both prototypes should be ready by 2009

LCLS Detector Development Program Silicon Pixel Array Detector technology Subcontracted to Gruner group at Cornell About $3.5M total over 4 years MOU in signing stage Detector scientist to be hired soon Periodic review by LCLS Detector Advisory Committee Detailed specs being developed to match needs of single-particle imaging experiment

Recent Developments affecting all X-ray Systems (and Conv. Facilities) Suggested Plan for Offset Mirrors in Front End Suggested Redesign of Far Experimental Hall These ideas are in the development stage, not yet official But they look very promising Have been endorsed by SAC

High Energy background problem Unfiltered LCLS beam contains significant background from spontaneous harmonics (Ec ~ 150 keV) and from Bremsstrahlung from scattered electrons (GeV) Much of this background lies directly on axis, and it is time-coincident with the FEL pulse This is a nuisance for radiological shielding, and a huge problem for data taking

Solution: Offset mirrors in the FEE Upstream of all LCLS experiments FEL radiation reflected (>95%) SiC 1.5mrad SiC 1.5mrad 24mm offset Background from high harmonics and Bremsstrahlung not reflected

Two mirror pairs, one pair inserted at a time SiC gives cutoff at 24 keV Be gives cutoff at 2 keV SiC 1.5mrad Be 13mrad SiC 1.5mrad 24mm offset 8.0m

Reflectivity vs energy for a flat SiC mirror at 1 Reflectivity vs energy for a flat SiC mirror at 1.5 mrad incidence angle R > 95% for E < 24 keV R < 10% for E > 28 keV From Berkeley CXRO calculator: <http://www.cxro.lbl.gov/optical_constants/mirror2.html>

Proposed new layout of FEE 7 ft Fe 3 ft concrete 4 ft Fe Mirrors GAS ATTEN COLLIM STOP STOP SOLID ATTEN ~30m

Advantages of Offset Mirrors Keep high-energy radiation out of experiments Eliminate troublesome background Note: nearly all synchrotron beamlines use some offset Keep high-energy radiation farther away from experimenters Reduce shielding requirements, make hutches more easily accessible

Far Experimental Hall Redesign Response to concerns of experimenters and LCLS Technical Advisory Committee Now in Title-1 planning stage

Problems with FEH Experimental hutches (7x8m) TOO SMALL Office and shop space (Vac., Mech.,Electr.) Experimental hutches (7x8m) TOO SMALL FEL beams

New design superimposed on old

Future tunnel to other stations New FEH design Entrance 14ft tunnel Fire door Fire door 15x25ft control cabin 46ft tunnel Sliding hutch door passage below beam pipe 6ft 10ft 28x33ft hutch 10ft 29x33ft hutch 36x33ft hutch 10ft 30ft transition Toilets 20ft tunnel Future tunnel to other stations 212ft

Advantages of new design Wider main tunnel Reduced corridor space More space for x-ray optics Large hutches Slightly higher cost

Summary Photon sections of LCLS are just starting up Major staff increase Experimental needs coming into focus Design changes Offset mirrors FEH redesign