API 17P TASK GROUP June 26, 2013.

Slides:



Advertisements
Similar presentations
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Advertisements

API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
API Subcommittee 17 Industry Standards for Subsea Equipment
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
SC18:TG8 API Specification Q1 Guidance Document.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group G Report January 17, 2003
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Status Report November 2007
API 17Q Proposed Technical Changes to Rev 0
API Subcommittee 17 - Specification 17D January 2016 Status
API RP 17A - Discussion Points
Submission Title: TG4m 4TV Closing Report for May 2013
doc.: IEEE <doc#>
ISO Task Group Update Wayne Mabry.
API SC6 Valves and Wellhead Equipment
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Specification on float equipment
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
doc.: IEEE <doc#>
API 17H TASK GROUP January , 2014.
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
doc.: IEEE <doc#>
API 17H ROV/ROT Interfaces
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Specification on float equipment
Task Group 4 Low Rate WPANS Opening Report
doc.: IEEE <doc#>
API 17H ROV/ROT Interfaces
Submission Title: [REVCOM Submission Information]
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
doc.: IEEE <doc#>
API 17H TASK GROUP January, 2015.
September 2009 Closing Report
Submission Title: TG4m 4TV Closing Report for September 2013
Task Group G Report January 17, 2003
CSOEM Materials Advisory Resource Group
TGg Report to the IEEE Working Group
Task Group Status January 2013
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
Presentation transcript:

API 17P TASK GROUP June 26, 2013

BACKGROUND NWI Initiated in 2006 API 17 P / ISO 13628-15 new recommended practice Effort is being led by API task group Draft relied heavily on specifications from a number of operators

SCOPE production and injection manifolds modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end terminations (PLET) T- and Y-connections subsea isolation valve (SSIV) subsea controls and distribution structures other subsea structures protection structures associated with the above.

TASK GROUP Name Company E-mail Charles White BG Norge Charles.white@bg-group.com Victor Vargas FMC victor.vargas@fmcti.com Jeff Whipple INTEC Engineering jeffrey.whipple@intec.com Eric Baltmanis ExxonMobil eric.j.baltmanis@exxonmobil.com Kim Dyson kim.dyson@intec.com Chad Hughs Chevron WHCI@chevron.com Matthew Herrold BP Matthew.Herrold@bp.com Ron Pfluger Cameron ron.pfluger@C-A-M.com Jon Stienar Knutsen Statoil/Hydro jonsk@statoilHydro.com Anders Husby DnV Anders.Husby@dnv.com

TASK GROUP Name Company E-mail Eric Hevle Nexen eric_hevle@nexen.com Marcelo Luiz Ligeiro Barbosa Petrobras marceloligeiro@petrobras.com.br Roberto Martins FMC roberto.martins@fmcti.com Maxwell Brandão de Cerqueira maxwellbc@petrobras.com.br Frederico Nicoletti Subsea 7 frederico.nicoletti@subsea7.com

CURRENT STATUS Committee Draft version has been competed and passed Completed April 2009 24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Completed March 2010 26 pages of comments (all have been addressed) Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot

CURRENT STATUS API adopt back ballot closed November 22, 2011 Result of FDIS ballot was approved Q3 2011 ISO 13628-15 has been released API adopt back ballot closed November 22, 2011 15 affirmative votes 2 negative votes (1 operator, 1 hardware supplier) 3 technical comments API recirculation ballot opened August 29, 2012

CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) 14 affirmative votes 5 negative votes Document has been published with editorial comments included API 17 P 1st edition published Jan 30, 2013

NEXT STEPS Start next revision Major work in clause 7 (materials) Reconsider comments from adopt back ballot

OPEN ISSUES Need new work item for next revision