H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
1 July 8, 2011 Boxes were moved between ground floor and console room floor. –Safety equipment and supplies identified and unpacked. –LN2 tank was unpacked.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
TOTEM Electronics Status
Rack Design Proposal as of 01/03/2013
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
EMU Slice Test Run Plan a working document.
Electrical and electronic systems projects
Electronics for RPC Upscope
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
Regional Cal. Trigger Milestone: Production & Testing Complete
Hardware Needs (Near Term)
B904 Status Report by Fred B.
Track Finder Crate, Backplane and Parts
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
Pierluigi Paolucci & Giovanni Polese
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
Pierluigi Paolucci & Giovanni Polese
Can I Help You? Can I help you? Can I help you?
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
TTC Fiber Distribution
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Equipment Management DB Rack Wizard USC55 Underground Counting Room Prepared by Fred Borcherding FNAL PPD/CMS 1-Sep-19 PC Locations and Names

USC55 Counting Room S1 S2 S4 – LVPS area >> Under UPS HV S1A10 – CSC - HV - Spare (Empty in RW) S1A11 – CSC – HV S1A12 – CSC – HV S1A13 – CSC – HV S1A14 – CSC – HV - Spare (Empty in RW) S1G10 – CSC – HV – ME1/1 TF – Track Finder S1D04 – TF S1D05 – TTC FED S1G06 – CSC – +Z FED, Fiber Boxes S1G07 – CSC – Gigabit Switches, FB S1G08 – CSC – -Z FED, Fiber Boxes S2 S2G19 – S2G18 – S4 – LVPS area >> Under UPS S4F04 – OPFC crates for Maraton LV S4F0x – DCS PC’s for LVPS 1-Sep-19 PC Locations and Names

S1 Floor Plan Overhead view of lower level electronics room 1-Sep-19 PC Locations and Names

S2 Partial Floor Plan CSC DCS in S2G18 CSC PC’s in S2G19 1-Sep-19 PC Locations and Names