Timetracker Midterm Update Senior Project II Sarah Mercier.

Slides:



Advertisements
Similar presentations
3rd Annual Plex/2E Worldwide Users Conference Page based on Title Slide from Slide Layout palette. Design is cacorp Title text for Title or Divider.
Advertisements

1 Site Editing on the Portal. 2 After signing on, click on the plus sign for Sites :
V New Functions What is new in 4.7? +planning +routing +forms +analysis +reporting +approvals +miscellaneous +remaining from 4.6.x.
PrevNext | Slide 1 Michigan Electronic Grants System MEGS MEGS Additional Features Last Updated: 2/4/2011.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Personnel Tracking for House Offices. Tracking of important staff information Customized for the House environment Generate forms to submit Generate reports.
Highlights: Simplify or expand data required to track time and attendance Configure timesheet formats by individual or group Maintain consistency with.
How are we CREATING Your Web and Global Presence.
Micro Control Solutions Stability System II rev. 6.4
HORIZONT TWS/WebAdmin TWS/WebAdmin for Distributed
Copyright © 2011, Splunk Inc.Listen to your data. Get Started with Splunk Reports & Dashboards.
Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
New Release Announcements and Product Roadmap Chris DiPierro, Director of Software Development April 9-11, 2014
Project Portfolio Management PPM User Guide Project Managers Version 1.0.
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
Extreme Planning: Agile turned to the max Exilesoft Johannes Brodwall Exilesoft Chief
What’s New in WatchGuard Dimension v1.2
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
Benchmark Series Microsoft Excel 2013 Level 2
Contract Audit Follow-Up (CAFU) 3.5 Pre-Defined & Ad hoc Reports November 2009 ITCSO Training Academy.
TIDE Presentation Florida Standards Assessments 1 FSA Regional Trainings Updated 02/09/15.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
For MIP Fund Accounting Software
Update 2 Sarah Mercier. Summary Current status ▫Implemented features ▫Known bugs ▫Changes from original plan Prototype demo ▫Before/after ▫GAE/Play!/Siena.
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
The Current System Log and Update Time Switch Weeks via Calendar View, Edit, Delete Time for Selected Week Manage and View Leave Time Submit and Print.
TimeTracker 2, Take 1  Servlets Web Interface (jsp) Servlet (business logic and processing) App Engine Datastore Form Submit R/W.
Live Meeting APIs Robert Devine Program Manager Microsoft Corporation.
Google Confidential and Proprietary 1 Intro to Docs Google Apps Apps.
User Group 2015 Version 5 Features & Infrastructure Enhancements.
Practice Insight Instructional Webinar Series Reporting
James Moore CS 491 Sponsor: Marshall University Office of Recruitment.
For rich web client applications Jeff Hemminger Object Partners, Inc.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
ZETA HRMS PRODUCT RANGE Standard ProfessionalEnterprise Basic MARKET SEGMENT.
JavaScript, Fourth Edition Chapter 12 Updating Web Pages with AJAX.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Supervisor Timesheet Approval Handbook 1. Hire Has Been Approved! Next, a student completes a timesheet! Then, you approve the timesheet! 2.
Milestone III BRIAN WYKA.  Web-based project manager  Ideal for small company  Portal for employees to interact with each other  A way for administrators.
VA Pain Coach (VPC) Mobile Applications (Apps) Phase Two (MAP2) Sprint 1 Demo/Review Report April 22, 2015.
Software Engineering Project: Research Expert Prabhavathi Kumarasamy Joshua Thompson Paul Varcholik University of Central Florida.
DotNetNuke v3 Overview Stan Schultes Stan Schultes Enterprise architect / application developer Enterprise architect / application developer Conference.
MIS 424 Professor Sandvig. Overview  Why Analytics?  Two major approaches:  Server logs  Google Analytics.
Accomplishments: Implementation Login form Dictionary Inputs Calculations(Partially Completed) Output(Partially Completed) Made a test database.
What’s new in Kentico CMS 5.0 Michal Neuwirth Product Manager Kentico Software.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Development road map February
2011 STAR Extended Pre-ID Data Corrections March 30, 2011 START TIME 9:00 a.m. Presenters: Michael McDaniel and Nicole Goward Extended Pre-ID Data Corrections.
STAR Extended Pre-ID Data Corrections March 28, 2012 START TIME 9 a.m. Presenters: Michael McDaniel and Mark Hansen Extended Pre-ID Data Corrections.
AFTERCOLLEGE SELF- SERVICE SCRAPE CONFIGURATION AND POSTING UTILITY Kai Hu Haiyan Wu March 17, Cowell 416 Midterm Presentation.
Dean Anderson Polk County, Oregon GIS in Action 2014 Modifying Open Source Software (A Case Study)
CS5604: Final Presentation ProjOpenDSA: Log Support Victoria Suwardiman Anand Swaminathan Shiyi Wei Department of Computer Science, Virginia Tech December.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
To the Unit Agreement Exhibit A Unit Tract Revision Online Training Course The purpose of this course is to provide guidance and information to ETS clients.
Google Analytics Graham Triggs Head of Repository Systems, Symplectic.
CIS-NG CASREP Information System Next Generation Shawn Baugh Amy Ramirez Amy Lee Alex Sanin Sam Avanessians.
Project Dragon Small Business Website Content Management System.
HR Training - new features, new reports and how to use them, questions
DPS Dissertation System
Branding SharePoint Using Application Customizers
Course Review HTML5 Level II Course Review
Giles County Animal Rescue
HTML5 Course Review Master a Skill / Learn for Life.
ხელმძღვანელი: დიმიტრი ქარაული
Intelligent Low-Altitude Air Traffic Management System Group 30
Presentation transcript:

Timetracker Midterm Update Senior Project II Sarah Mercier

Overview Status of project Project Timeline Progress made Success criteria Setbacks Bugs and plans to fix them Project differences from original plan

Status of project Reordered tasks since project review Slightly ahead of schedule (in terms of percent completed)

Timeline January 18:Complete Project Review. Begin work on calculating PTO based on hire date and manually modifying PTO. Put information in leave tab. January 31:Finish PTO calculation, modification and leave tab. Begin addressing errors in timesheet printing. February 10:Finish timesheet printing (hopefully). Begin work on report generation. Begin fixing bugs with date selection. February 15:Finish fixing bugs with date selection. Midterm project update.

Timeline February 24: Finish report generation. Begin client portal and reporting. March 10:Finish client portal and reporting. Begin branding. March 21:Finish branding. Begin optimizing queries to datastore to decrease on CPU usage and speed up load times. April 5:Finish optimizing queries. Project delivery date.

Progress made Calculation of PTO (Leave) based on hire date (Leave tab) Manual modification of PTO (Adjustments tab) Client portal Report generation Charts and filter/sort tables

Progress made Entity management Timesheet operations function correctly (Fixed bugs present last semester) Timesheet printing (HTML) Branding Still need to fix logo upload

To do Branding Timesheet printing to PDF instead of HTML Bug fixes (Date selection) Optimization of queries Report generation

Success Criteria Project success criteriaWeight Logging, editing, submission, and approval/rejection of time. Management of clients, projects and employees. (Completed last semester and over break) 25 Timesheet printing.15 Calculation of PTO based off of hire date and manual modification of PTO by admins; Leave tab to display information. 20 Report generation.15 Client portal and reporting.15 Bug fixes (date selection, time entry bugs from last semester, etc.)5 Optimization of queries.5

Setbacks Unable to generate PDFs without integrating with Google Documents Errors when attempting to write content to document Dynamic CSS issues with Play! Framework Branding Inability to easily write files to the datastore Exports Timesheets Reports

Setbacks No official support for Blob management in Play!/Siena Branding – will have to use a workaround for now

Bugs and plans to fix them Date selection Currently selecting with javascript from the DOM Hoping to find some way to set the date in the initialization of the jQuery UI object PDF printing of timesheets Not really a bug, just a feature request Going to integrate with Google Documents using the Google Data API (hopefully)

Differences from original plan No integration with Gmail and Google Talk Due to proxy functionality, violates Google App Engine terms of service No mobile version of web application Too many features based on Ajax and JS Addition of charts in report generation Addition of PDF timesheet printing

Questions?