LS1@LHC BLM planning 03/02/2014.

Slides:



Advertisements
Similar presentations
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Walls crates cables gas chambers electronics CERN adb.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Update on the Laser Beam Line
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
SunSatFriThursWedTuesMon January
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Infrastructure availability and Hardware changes Slides prepared by Niko Neufeld Presented by Rainer Schwemmer for the Online administrators.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Cabling for LHCb Upgrade
Framework Schedule from EYETS 2016 to LS2
BE-BI Activities and Status: LHC and Injectors
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
and Loudoun County School
VELO-installation meeting CERN, January 17, 2006
RICH Status from last RICH meeting
Injectors BLM system: PS Ring installation at EYETS
Helium spill in LHC tunnel
Holidays.
Injection region BLMs – ECR
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Nearly the end of a long story...
Bernd Panzer-Steindel CERN/IT
Disabling Rules.
2017/2018 – SAP/Kinder Calendar
GIS Portal Racks Project
BLM planning 24/02/2014.
BLM planning 03/03/2014.
LS1 status 28/04/2014.
LS1 status 24/03/2014.
07/07/2014 * status, all * AccTest framework
LS1 status 17/03/2014.
RPC Readiness for installation
South Milford Pre-School Playgroup
South Milford Pre-School Playgroup
Teacher name August phone: Enter text here.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
Re-Installation (days)
Tunnel hardware installation
LS1 status 07/04/2014.
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
2015 January February March April May June July August September
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
PCMB Address Assignments per Station/Rack/Crate
Presentation transcript:

LS1@LHC BLM planning 03/02/2014

Surface racks   P1, P2, P5, P6, P7, P8 (1/2) : done Pt3 : February Pt4 : February, March (Bernd’s request) From: Christos Zamantzas Sent: 31 January 2014 14:35 To: Slava Grishin; Seghaier Ben Amor Cc: Ewald Effinger Subject: Rack configuration Hi Slava, Here is the latest version of the rack configuration in the LHC. We have agreed with Ewald to change the position if the “Left” crates, because it will allow us to reuse many of the fibres. Regards, Christos

Tunnel racks and HV divider HV divider installation: ~60% HV dividers was installed in 6 LSS, but rest of cases are special : R5 – presentation of special cases R6 – not installed . presentation Schedule for installation, including P6 and P7 and special cases in rest of Points( wall, not enough space, not easy accessible) New cables L5: restoration of racks after He spill test, after Feb 7th Racks – CFC cards and take in to account the problems ( ventilator…)

BLM re-installation (not yet approved, Marzia) 1)Sector 6-7: Weeks 5, 7, 8 ( week 6 – no access) 24.02 – Walkway reinstallation   2)Sector 5-6: Week 6 (and this sector will be done) 17.02 – Walkway reinstallation 3)Sector 7-8: From 24.02, Weeks 9,10,11 17.03 – Walkway reinstallation 4)Sector 8-1: From 17.03, Weeks 12,13,14 and w15 up to 10.04 (+ 2 working days -exchange of persons of installation team) 14.04 – Walkway reinstallation 5)Sector 1-2: From 11.04, Weeks 16,17,18 and w19 up to May 7th  (April 18,21 and May 1st – holiday at CERN) 08.05 – Walkway reinstallation 6)Sector 2-3: From May 8, Weeks 20,21,22 (May 29th – holiday at CERN) 02.06 – Walkway reinstallation 7)Sector 3-4: From 02.06, Weeks 23,24,25 + up to 24.06 (June 9 – holiday at CERN) 24.06 – Walkway reinstallation 8)Sector 4-5: From 24.06, Weeks 26,27,28 15.07 – Walkway reinstallation

BLM re-installation Sector 6-7: According to LS1 schedule and constrains for ARC+DS Sector 6-7: R6 – done from Q7-Q34 with connectors, except QBBI.8R6 L7 – will work weeks 7 and 8 Sector 5-6: R5 – done with connectors, except for 3 open ICs L6 – will be done on this week LSS: LSS: Pt3 re-installed LSS: R5 - prepared but not installed 4 and 5 cells Schedule for LSS re-installation and new installation (Slava)

Divers Label for new “short” cable (BJBDV - BJBAP) Slot Labels Databases ( ~840 new expert names) Test (electrical, battery) Rad Source test ( 2 sources) Label for new “short” cable (BJBDV - BJBAP) ECR LHC-BLM-EC-0003 (BJBDV) LIC’s after GIF for installation – this week or middle of March