BaBar LST Upgrade Richard F Boyce

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

M16A4 SERVICE RIFLE HANDLING PROCEDURES ICS0102, Chart 1 20 July 2005.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
BaBar: The Detector Richard F Boyce 21 October 2003.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
Origami Flower Instructions. 1. Arrange the origami paper on a flat surface, color side down, with one corner pointing at you.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Lines Identifying Different Types of Lines. LINES There are many different types of lines. Can you think of any? vertical horizontal diagonal perpendicular.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
3.2 Solving Systems of Equations Algebraically Substitution Method Elimination Method.
1.What are they? 2.Why do we need to draw them? 3.How do you draw them? 4.Exercises.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
Minds On - Trapezoid In your math notebook – Draw a picture of a trapezoid. Name two characteristics of a trapezoid.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Wall Frames 2 M. S. Martin Feb Click mouse to bring in each point or item until complete.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
Look at the shapes below. How do I know which ones are pentagons?
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
Kapton module ass. Spacers for pins 3.6 m m 1.25 mm.
China Gracemac Paper Limited. 1 Lift the printer cover door.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Replacing the Main Monitor 1.Open Lower Main Door, and turn off machine power 2.Open the upper main door 3.Disconnect the video and power plugs from the.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
Side Rail Sag Measurement T. Hayakawa, K. Inami, K. Suzuki (Nagoya) and T. Kohriki (KEK) PID upgrade meeting.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Neutrino v2.1 structural assessment
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
Present status of the flux return yoke design
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
PANDA Yoke of the Magnet
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
SiD Muon Yoke Structure - Deformation Studies -
SVT Module design F.Bosi
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Materials Training 11/10/2018.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Module Installation
Jute Padding 1974 TCS before removal
Adjusting Tilt and Turn Inswing Door or Window
Limited Streamer Tubes
Level 0.
Five Sections Usage idea: Change colors and font to fit the style you want for your presentation. Section Three Section One Section Five Section Four.
10-6 Similar Figures (page )
1 1/8” 1 1/8” 1 1/8” 3/8 boarder 1 1/8” 1 1/8” 1 1/8”
All About Shapes! Let’s Go!.
Surface Area of a Cylinder
Limited Streamer Tube Project Summary
Difference between 3 COF and 6 COF Open cells in 22” Segment
Identifying Different Types of Lines
Presentation transcript:

BaBar LST Upgrade Richard F Boyce Ohio State University Meeting 24-26 April 2003

The BaBar Detector consists of a central barrel with a pair of doors at each end Rear Doors Barrel Forward Doors

A section through the detector shows its complexity

The BaBar Barrel Calorimeter is supported by four cantilevered arms

The 3 and 9 o’clock corner plates support the Barrel Calorimeter Let’s replace the top and bottom chambers

This is the barrel calorimeter support to be removed

The plates sag under gravity load, this increases with the brass load

How much does the detector change shape with the removal of the corner plates? Less than 0.2 mm!

Make a work platform to remove the old RPC’s

View of top work platform without BaBar

Side view of top work platform