Walter Brooks Executive Director Regional Planning Commission November 2, 2012.

Slides:



Advertisements
Similar presentations
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Advertisements

Planning for New Neighborhoods linked to Transit: Santa Monica’s
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Connecting Communities Planning Grant & Planning Tools Curtis Baker, Planning Administrator Krista Beniston, Planning Coordinator October 12,
Presentation Outline What is a Healthy Neighborhood? Planning Trends and Impacts on Health Planning Tools for Healthy Communities.
Public Works: Building Sustainable Communities
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
The National Context for Smart Mobility John V. Thomas, PhD US EPA Smart Growth Program.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
A POLICY PLAN FOR NORTH MICHIGAN AVENUE AND THE SURROUNDING DISTRICT 2013 IDA ACHIEVEMENT AWARD SUBMISSION: PLANNING CATEGORY.
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
2015 Interregional Transportation Strategic Plan CTC Meeting December 10, 2014 Bill Figge, Acting Deputy Director Planning and Modal Programs.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Ohio Transportation Planning Conference July 16, 2014.
GEORGIA DEPARTMENT OF TRANSPORTATION INTERMODAL DIVISION - TRANSIT Presented to G.A. MPO CONFERENCE November 2012.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Where the Home Is Matters Planning for Healthy and Equitable Communities Julie West, MPH Jim Krieger, MD, MPH Public Health – Seattle & King County May.
Amy Johnson Executive Director Palmetto Cycling Coalition Advocating Locally for a Better Transportation Network.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
ECIA A Regional Response to Local Needs CHANDRA RAVADA Director of Transportation Introducing Long Range Transportation Plan.
U.S. Department of Housing and Urban Development Roger Jacobs Field Office Director Sioux Falls Field Office 4301 West 57 th St., Suite 101 Sioux Falls,
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
On the Road to a New Metropolitan Transportation Plan Spokane Regional Health District Board of Health April 25, 2013.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Mayor Karl Dean, Chairman Integrating Health and Transportation: Policy, Projects, Data Collection and Monetization Rochelle Carpenter National Health.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Regional Mobility Plan I. Introduction This process for creating a regional mobility plan is designed for geographic areas with a small to medium sized.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Area Plan Overview Public Comments and Area Plan Changes Environmental Analysis Schedule Presentation Overview.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
INDOT Office of Traffic Safety Manager, Mike Holowaty
ARCH – 4601 Feasibility Study Presentation
Complete Streets Award Program
What is the Regional Transportation Plan?
Nolanville Main Street Sidewalk & Bicycle Connectivity
FHWA Bicycle and Pedestrian Program
Intercity Bus Study 5311/Update
ROOSEVELT CITY GENERAL PLAN 2010
I Street Bridge Replacement Project
Environmental Impact Statement (EIS)
Presentation transcript:

Walter Brooks Executive Director Regional Planning Commission November 2, 2012

(October 1, 2012 thru December 31, 2014)

PERFORMANCE MANAGEMENT APPROACH Identifies National Goals (23 USC 150 (b)) 1. Safety 2. Infrastructure Conditions 3. Congestion Reduction 4. System Reliability 5. Freight Movement and Economic Vitality 6. Environmental Sustainability 7. Reduced Project Delivery Delays

Shall include identification of transportation facilities (including major roadways, transit, multimodal and intermodal facilities, nonmotorized transportation facilities, and intermodal connectors) that should function as an integrated metropolitan transportation system, giving emphasis to those facilities that serve important national and regional transportation functions.

Performance – Based Federal Program Emphasis on Multimodal Investments (Retain Flexing Provision) Corridor Planning with Environmental Linkages

US DOT Establishes Performance Standards and Measures (13 hwy. and 2 transit areas) State DOTs and MPOs set Measurable Targets for each Performance Measure Conduct Sound Multimodal Planning Process Develop Plans and Programs and Select Projects to Demonstrate Target Acheivement US DOT to Track State and MPO Progress in Achieving Performance Targets (7/6/17)

Long Range Transportation Plan (MTP) Short Range Transportation Pan (TIP)

Average Annual Investments 1999 – Current $239M/year 2040 Plan System Preservation42% Safety & Operations27% Bike/Ped10% New Capacity21% Transit Discretionary $Competitive Pot New Starts50% Local Share Operating CostTMAs 100% Local Small Urbans 50/50% Inter-City RailFRA (not FTA)

Total Investments $203M - 87 Projects

250+ Engineers and Planners 40+ Police in 8 Jurisdictions

Bicycle fatalities are 27% Pedestrian fatalities 15%

Harrison Avenue

Road overlay & ADA access improvements through Submerged Roads Program String of commercial enterprises reopened, led by banks and followed by restaurants including Reginelli's, Lakeview Deli, the Steak Knife, Lakeview Harbor and Mondo (Susan Spicer)

Enhancement of existing development patterns Vibrant, mixed-use neighborhood with a stable residential base Pedestrian-oriented core centered on 18 th Street Compatible transitions between the mixed-use core, residential areas, and heavier commercial areas at the periphery Fat City: Strategic Plan Vision

Walkable mixed-use 18 th Street as Main Street of Fat City Upper floor: mix of office, lodging, and residences Street level: restaurants, specialty retail, and entertainment uses 65 height max

Under construction Overlay 8 streets Installation of ADA compliant ramps Sidewalk replacement- in-kind where needed Improved signage and striping for pedestrians and bicyclists Construction cost: $13.5M Work complete before Super Bowl

5000+ ADA ramps installed through Submerged Roads New Orleans CBD improvements on high volume ped/transit routes Jefferson Parish ADA Transition Plan to identify barriers to accessibility and create a schedule for making improvements

Awarded Bronze Level Bicycle Friendly Community by League of American Bicyclists Lane striping coordinated with Bike Master Plan Bike-on-bus Coordination Complete Streets policy Training Workshops

150+ yrs old & pedestrian only Address civil & structural needs in addition to architectural rehabilitation Aligns with CNO priorities of public safety, sustainable communities, and promoting family recreation areas $1.1M cost

RPC initiated a market analysis and feasibility study based on community vision Army Corps of Engineers announced its intentions to locate a permanent pump station in the West End vicinity 1 st Public Meeting held Jan 2012, 2 nd Public Meeting held July