Presentation is loading. Please wait.

Presentation is loading. Please wait.

Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.

Similar presentations


Presentation on theme: "Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015."— Presentation transcript:

1 Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015

2  State Growth Management Act requires us to plan for growth Purpose  Growth Strategy  Land Use  Transportation  Housing  Capital Facilities  Utilities  Economic Development  Environment  Parks and Open Space  Arts and Culture  Community Well-Being  Container Port  Shoreline Management Elements Comprehensive Plan framework  City vision and core values  20-year blueprint to guide future growth and investments  High-level goals and policies  Growth Forecasts (2015- 2035)  +70,000 HH; 120,000 people  +115,000 jobs

3 Comp Plan establishes the City’s growth strategy (urban centers, MICs, urban villages) Obligates City to provide infrastructure to accommodate growth targets Provides key policy framework for other SDOT and City plans Comp Plan adopted by ordinance, so helps direct implementation activities Plan must be certified by PSRC after adoption to be eligible for grant funding Seattle’s Growth Strategy

4 Planning Framework Seattle Comprehensive Plan (20-year plan) Citywide Plans Bicycle Master Plan Transit Master Plan Pedestrian Master Plan Freight Master Plan Area Plans Subarea Community -Southeast-Mt. Baker -Northgate-Ballard -U District-Uptown -SLU-Rainier Beach Operational Plans Vision Zero Action Plan ITS Next Generation Urban Forestry Performance-Based Parking Programs Examples: Safe Routes to School Pavement Management Complete Streets Travel Options Parking Management Traffic Calming Asset Management Public Space Management Climate Action Plan Move Seattle (10-year strategic plan) Projects Examples: Seawall Replacement NGate ped/bike bridge Center City Connector 23 rd Avenue E Marginal Way Third Avenue Center City bike network Market/45 th Corridor

5 Released in July: http://www.seattle.gov/dpd/cityplanning/completeproje ctslist/comprehensiveplan/documents/default.htm http://www.seattle.gov/dpd/cityplanning/completeproje ctslist/comprehensiveplan/documents/default.htm Outline of Transportation Element –Integrating Land Use and Transportation –Make the Best Use of the Streets We Have –Transportation Options –Environment –Support a Vibrant Economy –Safety –Connecting to the Region –Operations and Maintenance –Measuring Level of Service –Funding Public Review Draft of Comprehensive Plan

6 T1.6 Improve connections to urban centers and villages from all Seattle neighborhoods, particularly by providing a variety of affordable travel options (bicycle, transit, and pedestrian facilities) T2.1 Designate space in the public right-of-way to accommodate multiple travel modes. T3.1 Develop and maintain high-quality, affordable and connected bicycle, pedestrian, and transit facilities. T3.9 Develop and maintain pedestrian and bicycle facilities that enhance the predictability and safety of all users. T3.10 Prioritize bicycle and pedestrian investments on the basis of increasing use, safety, connectivity, equity, health, livability, and opportunities to leverage funding. TG6 Provide and maintain a safe transportation system that protects all travelers, particularly the most vulnerable users. T6.3 Invest in education measures that increase mutual awareness among motorists, pedestrians, and bicyclists. Example of Goals/Policies Relating to Bicycles

7 Make the Best Use of the Streets We Have Identifies policies and a framework for ROW allocation decisions Supports Move Seattle Describes ROW allocation process to internal and external audiences Guides modal plan integration

8 Right-of-Way Zones

9 Right-of-Way Functions

10 Outcome: multi-functional streets

11 ROW Allocation Decision Process Allocate space on Seattle’s streets to safely and efficiently connect people and good to their destinations while creating inviting spaces within the ROW (Goal TG2) See policies T2.1-2.8

12 Level of Service (LOS) LOS is a quantitative or qualitative measure of the performance of transportation systems and facilities Traditionally, LOS has focused on vehicle congestion (traffic volumes/road capacity) The Growth Management Act (GMA) requires LOS standards for all locally owned arterials and transit routes Puget Sound Regional Council is seeking LOS standard that focus on all modes of transportation 12

13 Current LOS Standard Screenlines to assess ratio of traffic volume to capacity Generally allow for a high level of congestion (v/c of 1.0 to 1.2) Used for arterials and transit Standard designed to be difficult to exceed Insert image 13

14 New Approach to LOS Comp Plan Goals Enhanced Multimodal Screenlines (Consider Person Trip Capacity) Performance-Based Measures (VMT, Mode Share) Tests the merits of individual projects and system performance Evaluates impacts on the system (corridors), not the merits of individual projects

15 Potential LOS Mitigations Under New Approach Bicycle parking & facilities Paid and/or reduced vehicle parking for residents and employees Transit passes & subsidies Pedestrian & bicycle access improvements Mix of uses Vanpool accommodation 15

16 Comprehensive Plan Schedule and Next Steps May 2015Release of Comp Plan DEIS and equity analysis July 2015Release of public review draft of Comp Plan update Summer/Fall 2015 SDOT advisory board, Planning Commission, and public review and comment on public review draft Early 2016Release of FEIS and Mayor’s recommended Comp Plan Mid 2016City Council approval of Plan


Download ppt "Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015."

Similar presentations


Ads by Google