RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

FAASTeam CFI Workshop 8 Pilot Deviations Including Runway Incursions
Advanced Piloting Cruise Plot.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Flight Operations View
Course Schedule three Assessment Scenarios Discussion Groups Discussion Groups.
ICAO Safety Management Systems (SMS) Course
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
SILVER COMET FIELD AT PAULDING NORTHWEST ATLANTA AIRPORT FIVE YEAR CAPITAL IMPROVEMENT PROGRAM.
1 FLL Construction Playbook RWY 10R / 28L April 17, May 6, 2013 Phase 1 Only ~ RWY 9R Closes.
Flight Crew Activities During a Typical Flight
Airports And ATC Written for the Notre Dame Pilot Initiative
Colorado Springs Airport
AF 202 Airport Operations.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner.
Airfield Lighting Designs Salt Lake City International Airport
Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager.
Instrument Approach Charts
Squares and Square Root WALK. Solve each problem REVIEW:
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
1 Los Angeles World Airports | LAX Interim Runway Safety Improvement Project Update of Interim Safety Improvement Planning Presentation to Board of Airport.
Week 1.
Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.
Weekly Attendance by Class w/e 6 th September 2013.
1.6 – Solving Compound and Absolute Value Inequalities
By: Nurhan Tan, NAS Planning & Integration Date: Sept. 16, 2009 Federal Aviation Administration ACA Association of California Airports Conference S. Lake.
This story relates to a aircrew that was taking a C-141 to Robins AFB for some depot work. During preflight the crew noticed via NOTAM’s that half of.
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
RADIONAVIGATIONAL EQUIPMENT AT THE AIRPORT cpt. Ing. Milan HANZLÍČEK 1.
Runway & Taxiway Markings
Instrument Ground Training Module 5
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Airport Obstruction Issues And ASM GAA Workshop February 25, 2015 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Approach Charts and Procedures
1. This airport sign indicates? A) Left turn to Taxi A
Welcome Air Traffic Control Procedures For: SAFECON 2015 Competition.
FLASH CARDS The AOPA Air Safety Foundation (ASF)
Air Law 1.01 Aerodromes References: FTGU pages 91-98
Aircraft Characteristics
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Lecture 12:Approach Lighting System
Airport Lighting Brett Malloy
Ballina Byron Gateway Airport Presentation November 2012.
Mark George Survival Factors Division
Runway 16L-34R Overlay RFQ Presentation. AGENDA Review of the RFQ Process Overview of the 16L/34R Overlay Overview of Section 4 - Scope of Work Review.
By: FAASTeam Federal Aviation Administration Land and Hold Short Operations (LAHSO)
Airport Markings & Signs
A Runway/Taxiway marking and signage quiz
Airports, Airspace and Flight Information Chapter 3, Section A.
Scenario on airport works Session 5 Presentation 1.
Wes Timmons, Director of Runway Safety, FAA April 2009 Federal Aviation Administration Runway Safety: Sun ‘N Fun Update.
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
KNDZ Runway Repair Course Rules Phase II Jan 16 – Jul 16 R&I Summary.
Ohio Aviation Association Airport Airspace Zoning Ohio Airports Conference April 12 and
Final approach Instrument landing system
Presentation transcript:

RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013

Updates Since Last Meeting: Runway 28 Extension 1.Decreased duration of reduced runway length – NOW = 10 days 2.Relocation of existing PAPI prior to threshold relocation 3.Installation of temporary REIL for threshold relocation 4.ASOS relocation time: ONE DAY. (to be schedule after glide slope relocation) 5.Runway opens to 6,900 length after 10 day threshold relocation is over Runway Overlay and Marking 1.Night work Runway 10/28 2.Maintenance of standard markings 3.Day work Runway 18/36

10 9/13/13Reopen Runway 6,900, (Localizer only) 9/13/13 12/13/ FAA Publishes flight procedures (Full ILS) 12/13/13 12/13/13 1

NOTE: Aircraft must use Taxiway G to access the end of Runway 28 Construction Access Phase I

Construction Access Phase II NOTE: Aircraft must use Taxiway D to access the end of Runway 28

Construction Access Phase III NOTES Aircraft departing Runway 28 must back- taxi from Taxiway H and turn around on the runway for maximum available takeoff length. Aircraft landing Runway 10 and traveling beyond Taxiway H must turn around on the runway and back-taxi in order to exit the Runway via Taxiway H End Runway 28 5,900 ft. End Runway 10 5,500 ft.

Final PAPI Glide Slope