1 FLL Construction Playbook RWY 10R / 28L April 17, 2012- May 6, 2013 Phase 1 Only ~ RWY 9R Closes.

Similar presentations


Presentation on theme: "1 FLL Construction Playbook RWY 10R / 28L April 17, 2012- May 6, 2013 Phase 1 Only ~ RWY 9R Closes."— Presentation transcript:

1 1 FLL Construction Playbook RWY 10R / 28L April 17, 2012- May 6, 2013 Phase 1 Only ~ RWY 9R Closes

2 Phase 1 ~ April 17, 2012 to May 6, 2013 Relocated Bomb Threat (101) Run Up Area

3 NOTAMS & Construction Notices on the Digital NOTAM Site http://notams.aim.faa.gov/notamSearch/

4 Airport Construction Notices FLL Construction Notice will be published on April 17, 2012

5 5 FLL Airport Capacity during RWY 9R Closure 5

6 6 9L 9R 13 Total ADR: 36 Total AAR: 32 Total Airport Ops: 68 EAST VMC Peak Demand RWY 13 ARVL ~ RWY 9L DEPT VISUAL/RNAV VISUAL RWY 13 AAR 32 NORTH SIDE 32 0 SOUTH SIDE 090 0 6 060

7 7 9L 9R 13 Total ADR: 32 Total AAR: 28 Total Airport Ops: 60 EAST MVFR/IMC Peak Demand RWY 9L ARVL ~ RWY 9L/13 DEPT ILS/RNAV RWY 9L AAR 28 NORTH SIDE 28 0 SOUTH SIDE 090 0 7

8 8 9L 9R 13 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 EAST VMC/IMC 9L/27R CLOSED RWY 13 ARVL ~ RWY 13 DEPT LOC/RNAV RWY 13 AAR 0 NORTH SIDE 24 24 SOUTH SIDE 24 DEPT 24 ARVL 8 H090

9 9 27R 27L 31 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 WEST VMC/IMC RWY 27R ARVL ~ RWY 27R DEPT VISUAL RWY 27R AAR 24 NORTH SIDE 24 0 SOUTH SIDE 270 0 24 Arvl 24 Dept 9

10 10 27R 27L 31 Total ADR: 24 Total AAR: 24 Total Airport Ops: 48 WEST VMC 27R CLOSED RWY 31 ARVL ~ RWY 31 DEPT VISUAL/RNAV RWY 31 AAR 0 NORTH SIDE 24 24 SOUTH SIDE 270 0 24 Arr 24 Dep 10

11 11 27R 27L 31 Total ADR: 22 Total AAR: 20 Total Airport Ops: 42 WEST IMC 27R CLOSED RWY 31 ARVL ~ RWY 31 DEPT RWY 31 RNAV/GPS ONLY AAR 0 NORTH SIDE 20 20 SOUTH SIDE 270 0 20 Arr 22 Dep 11

12 12 FLL Approach Procedures Visual Approach 13/31 RNAV Visual 13/31 Localizer/DME RWY 13 RNAV (GPS) RWY 13 RNAV (GPS) RWY 31 12

13 13 LOC/DME RWY 13 13

14 14 RNAV(GPS) RWY 13 14

15 15 RNAV VA RWY 13 15

16 16 RNAV VA RWY 13 16

17 17 RNAV (GPS) RWY 31 17

18 18 RNAV VA RWY 31 18

19 19 RNAV VA RWY 31 19

20 20 Temporary Relocation Aircraft 101 Site = The Penalty Box & Engine Run Up Area 20

21 21 DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION Ft. Lauderdale-Hollywood International Airport Traffic Control Tower 4150 SW 12 Terrace Ft. Lauderdale, FL 33315 LETTER TO AIRMEN NO. 20XX-XX SUBJECT: FLL - Runway 9R27L Closure FLL - Runway 13/31 Decommissioned FLL – Hot Spot Use for RWY 31 Ops ISSUED: EFFECTIVE: CANCELLATION: TBD 21

22 22 Contact for Support Telcons TBD Supporting Documentation http://www.mitrecaasd.org/TFMForums User Name: forums Password: customers