T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show.

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
East Hampton High School July 2013 – July 2014 Design Phases.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
TIGER GRANT Informational Meeting March 30, 2010 MARCH 30,
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Software Solutions for Landscape Professionals Change Orders made easy with DS|Manage360 Planning for Profitability 2012 Webinar Series June 28, 2012 Presenter:Marcus.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
ENERGY SURVEYING Please Click through this presentation.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Public Health - Always Working for a Safer and Healthier Washington Washington State Department of Health Division of Environmental HealthOffice of Drinking.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
The New York City Watershed Agreement “A commitment to Partnership”
Community Development Department ACTION ITEM – MODERATE PRIORITY Building, Permitting and Inspection Processes: Simplification/Streamlining CITY COUNCIL.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Missouri Certified Sites Program Missouri Department of Economic Development Presented By: Joel McNutt & Jo Ann Dent.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Connecticut Department of Energy and Environmental Protection.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Platting Update Orange County BCC January 27, 2015.
Chapter 6 Industrial Development. -The first planned industrial park was in 1896 in Manchester, England. -The first in the United States was in Chicago.
Ohio EPA Targeted Brownfield Assessment and Technical Assistance Programs.
Host Agency Safety Consultation What the law says you must do.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
Joshua Dault Planner III Santa Rosa County Development Services Santa Rosa County Commercial Permitting.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Dredging Engineering: Building & Maintaining Underwater Highways
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
La Center, Washington: Balancing Pipelines and Populations 1.
Michael deLamare Requirements Management Program Functions R-9.
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
EPA Storm Water Run Off Review and Reading Assignments.
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Minnesota CLE June Webcast Extravaganza Environmental Law Basics for the Business and Real Estate Practitioner Joseph G. Maternowski, Hessian & McKasy,
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Perris Water Filtration Plant Membrane Upgrade – Phase I
PITT COUNTY SOLID WASTE & RECYCLING
9/18/2018 Bids CONTRACTING Khamis…..
How to Build a Great Team
CHAPTER 3 Developing the Event Site
Anatomy of AN infrastructure project
Delta Water Supply Project
Richland Creek Water Supply Program Program Update
Presentation transcript:

T HE O THER C OSTS OF THE P ROJECT Things to Consider When Planning New Work 12 th Annual International Aboveground Storage Tank Conference & Trade Show March 3, 2010

O VERVIEW Planning the Project: looking at the whole picture Project Process & Checklist: what to consider Planning Tools and Tips:

P LANNING THE P ROJECT Project Progression… DefinePlanDesignProcureConstruct

P LANNING THE P ROJECT What are Other costs… Product Systems Tanks Piping/Mechanical Electrical/Controls Rail Docks Other Costs Stormwater Management Fire Protection Geotechnical/Soils Issues Permitting/Approvals Design and Management Fees

P LANNING THE P ROJECT Other costs… Focusing on line-item costs can be misleading…. Additional liability comes from potential: Re-Work $ Schedule Delay $$ Unusable Real Estate Assets $$$ Operations Impact $$$$ Failed Customer Commitments $$$$$

P LANNING THE P ROJECT Depends on procurement method… Single-Source EPC Full-Service Design, Bid & GC Multiple Design contracts and Construction contracts Just build it…now (not recommended)

P LANNING THE P ROJECT …in 3 steps Develop a scope Vet the project Assemble a Concept Package Planning the Project Planning Process Planning Tools and Tips

P LANNING THE P ROJECT Develop a scope… Written scope of construction with photos Flow Diagrams (redlines or new) Site Layout …or any combination of these. Planning the Project Planning Process Planning Tools and Tips

P LANNING THE P ROJECT Vet the project… with local operations with permit authorities with providers (rail, pipeline, harbormasters, etc) with major vendors (tanks, heaters, etc) Planning the Project Planning Process Planning Tools and Tips

P LANNING THE P ROJECT Assemble concept package… Scope of Construction Site Layout Cost Estimate Permit information Project Schedule Planning the Project Planning Process Planning Tools and Tips

Considerations… Who can impact my project Typical permits/approvals Permit investigation Internal requirements Other projects/permits Useful documents to have Use a checklist/form Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Who can impact my project… City, County, and State Provider (rail, pipeline, etc) EPA (or DEP, DENR, EPD, DEQ) DOT US CG US ACE Marine/Harbor Association Neighbors/Stakeholders Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Typical permits/approvals… Planning/Zoning Land Disturbance Stormwater/Water Quality Fire Dept Building/Foundation Air (construction, operation) NPDES Rail Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

What if there is permitting… Assemble Permit Tracking form Permit contact, schedule, fee What is the permit trigger? Is it admin or technical? Are there predecessors? Is it a predecessor to others? Is permit needed for all, some or operations only Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Internal requirements… Find out what approvals are needed internally – safety, environmental, operations, etc. Is PHA/HAZOP needed? Assign contact person from the beginning for each Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Useful documents to have… Surveys (ALTA, topo, hydro) Geotechnical investigations API 653s and pump data SPCC and NPDES 70E Arc Flash/One-lines/Bills Current/active Permits Fire-flow tests Easements/Agreements Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Use a checklist or form… Develop a standard checklist for project planning (or borrow) Keep track of permits, approvals, documents, etc Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Use a checklist or form… Develop a standard checklist for project planning (or borrow) Keep track of permits, approvals, documents, etc Planning the Project Planning Process Planning Tools and Tips P LANNING P ROCESS

Tips… Vet the project – operations, permits, and providers Every permit and regulation has a trigger… Know it. Plan for the worst (reasonable) Set aside 10% for construction contingency Planning the Project Planning Process Planning Tools and Tips P LANNING T OOLS AND T IPS

Tips… Gather documents, now Know the approvals needed, when theyre needed, and which comes first Have a standard Project Plan package – use it every time Planning the Project Planning Process Planning Tools and Tips P LANNING T OOLS AND T IPS

Todd M Eldridge, P.E (office)