Comparative Emergency Management

Slides:



Advertisements
Similar presentations
Tehran University of Medical Sciences Institute of Public Health Research Health in Emergency & Disaster Department (HE&DD) D isaster: Basic Terminology.
Advertisements

Hazard and Risk Analysis What are the socio-economic and political trends? Consider recent assessment / reviews / baseline studies / analytical exercises.
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
Session 171 Comparative Emergency Management Session 17 Slide Deck.
Establishing Basic Parameters: Risk Assessment
Week 91 Example A device containing two key components fails when and only when both components fail. The lifetime, T 1 and T 2, of these components are.
PROJECT RISK MANAGEMENT
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Prepare + Prevent + Respond + Recover + Mitigate Benefit Cost Analysis (BCA) 1.
Session 301 Factors in Assessing Risk Mitigation Actions Impact reducing the identified risks and vulnerabilities in the community Probability that each.
Session 011 Hazard Risk Management Establish the Context Objectives Stakeholders Criteria Define key elements Identify the Risks Hazards analysis Vulnerability.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Project Risk Management
Session 6Slide 6-1 Risk Management Lessons from Outside the United States Session 6 Slide Deck.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Risk Evaluation Determines the relative seriousness of hazard risks as they affect the local community Session 20.
Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.
1 Risk management and Investigation Peter Roberts
1 What do we call Ourselves? Hazards Risk Managers of Course Greg Shaw GWU ICDRM The George Washington University Institute for Crisis, Disaster, and Risk.
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
Project Risk Management
What is Business Analysis Planning & Monitoring?
PRM 702 Project Risk Management Lecture #28
Risk Management & Liability Informa Brownfield Hospital Development Summit June 2009.
Assessing climate change risk. Introduction Welcome & Acknowledgement Background Workshops  action plan General Manager’s support Housekeeping Facilities,
Basics of OHSAS Occupational Health & Safety Management System
MITIGATION PREPAREDNESS RESPONSE RECOVERY FOUR PHASES OF EMERGENCY MANAGEMENT Pre-event Post event Pre-event.
WMD & Emergency Planning Steps Session 12. Emergency Planning Steps Vulnerability Assessment Mitigation Efforts Emergency Response Planning Recovery.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Risk Management Presented By: Prof. Dr. Samir Afifi.
Introduction to Risk Management C7 Slide 1. The Concept of Safety  ‘Safety’ refers to the reduction of risk to a tolerable level  Risk = Likelihood.
Hazards Risk Management Course Revision Project Update George Haddow June 2012.
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
Risk Assessment and Management. Objective To enable an organisation mission accomplishment, by better securing the IT systems that store, process, or.
UNDP Handbook for conducting technology needs assessments and Preliminary analysis of countries’ TNAs UNFCCC Seminar on the development and transfer on.
Risk analysis workshop Dec Objectives of the workshop: Impact Intervention  Discuss the function of hazard and risk analysis in contingency planning.
Risk Management. 2 Policy and planning Key Messages Assess all likely risks, be prepared and practice. Structure the risk management process simply and.
Session 181 Risk Analysis RISK = LIKELIHOOD X CONSEQUENCE.
THE LOW DOWN ON RISK ASSESSMENT HOW SAFE ARE OUR CITIES?
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Session 8Slide 8-1 The Mitigation Plan Session 8 Slide Deck.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Introduction to Hazards Risk Management
Health Emergency Risk Management Pir Mohammad Paya MD, MPH,DCBHD Senior Technical Specialist Public Health in Emergencies Asian Disaster Preparedness Center.
The Risk Management Process
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Session 7 Crisis and Risk Communication Session 7 Slide Deck Slide 7-1.
Risk assessment and Natural Hazards. Concept of vulnerability (e.g. fatalities in two contrasting societies) Deaths 1 …………………………………………
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Risks and Hazards to Consider Unit 3. Visual 3.1 Unit 3 Overview This unit describes:  The importance of identifying and analyzing possible hazards that.
DISASTER VULNERABILITY, RISK AND CAPACITY
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
People and Culture Office Safety, Health and Wellbeing
Ensuring a safe workplace
8 Managing Risk (Premium).
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
Research Project Overview
Project Risk Management
Quantitative Risk Assessment
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Management
Presentation transcript:

Comparative Emergency Management Session 9 Slide Deck Session 9

Session Objectives Provide a Detailed Definition and Description of Risk in the Context of the Emergency Management Profession. Provide a background on the various forms of consequences considered in a hazard risk assessment and analysis. Explain how Likelihood and Consequence may both be represented as either qualitative or quantitative values. Describe the Process by which Hazard Likelihood and Consequence are Analyzed. Explain how Individual Risks are Evaluated in a Standardized Format. Explore Examples of Risk Management in Practice Session 9

Risk Affects all people and all communities without exception, irrespective of geographic or socioeconomic limits Every economic, social, policy, or political action or choice made by government and its constituents, and the businesses that operate in those communities, involves specific, often unknown, factors of risk Risk is Individual and Collective Session 9

Risk Equation RISK = LIKELIHOOD X CONSEQUENCE Session 9

Consequence Factors Deaths / Fatalities (Human) Injuries (Human) Damages (cost, reported in currency, generally US dollars for international comparison) Session 9

Direct Losses “those first order consequences which occur immediately after an event, such as the deaths and damage caused by the throwing down of buildings in an earthquake” (Smith, 1992) Examples: Fatalities, Injuries, Relocation Costs, Cleanup/Repair Costs Session 9

Indirect Losses May emerge much later and may be much less easy to attribute directly to the event. Examples: Income Loss, Mental Illness, Loss of Institutional Knowledge Session 9

Tangible Losses Those for which a dollar value can be assigned. Examples: Response Costs, Repair Costs, Inventory Loss Session 9

Intangible Losses Cannot be expressed in universally accepted financial terms. Examples: Cultural Loss, Stress, Mental Illness, Aesthetic Loss Session 9

Quantitative Analysis of Risk Uses mathematical and/or statistical data to derive numerical descriptions of risk. Gives a specific data point (dollars, probability, frequency, or number of injuries/fatalities, for example) Session 9

Qualitative Analysis of Risk Uses defined terms (words) to describe and categorize the likelihood and consequences of risk. Allows each qualifier (word) to represent a range of possibilities. Session 9

Additional Consequence Measures Complexity or Difficulty Associated With Emergency Operations Disruptions to Lives and Livelihoods (Social Disruption) Disruption to economy Environmental impact Session 9

Depth of Analysis The amount of time and money available The seriousness of the risk The complexity of the risk Session 9

Full Damage Consequence Analysis Losses to Structures Losses to Contents Losses to Structure Use and Function and Cost of Displacement Session 9

Qualitative Example 1 Session 9

Qualitative Example 2 Session 9

Qualitative Example 3 Session 9

Risk Matrix Session 9

FEMA Risk Matrix Values Class A. High-risk condition with highest priority for mitigation and contingency planning (immediate action) Class B. Moderate to high risk condition with risk addressed by mitigation and contingency planning (prompt action) Class C. Risk condition sufficiently high to give consideration for further mitigation and planning (planned action) Class D. Low-risk condition with additional mitigation contingency planning (advisory in nature) Session 9

Risk Registers Name of Risk Qualitative Likelihood Value Qualitative Consequence Value Level of risk Priority Rating Additional Information as needed Session 9

SMAUG Methodology Seriousness Manageability Acceptability Urgency Growth Session 9

Australia / New Zealand Communicate and Consult Establish the Context Objectives Stakeholders Criteria Define key elements Identify the Risks Hazards analysis Vulnerability analysis Analyze the Risks Review controls Likelihoods Consequences Level of risk Evaluate the Risks Evaluate risks Rank Risks Treat the Risks Identify options Select the best responses Develop risk treatment plan Implement Monitor and Review Session 9