Course Structure.

Slides:



Advertisements
Similar presentations
Albania Good practices and Gaps 13 December 2013.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
IAEA International Atomic Energy Agency Regulations Part II: Basic Concepts and Definitions Day 8 – Lecture 5(2)
Authorization and Inspection of Cyclotron Facilities The activities and responsibilities of the Regulatory Body GSR Part 1.
Nuclear and Treaty Law Section Office of Legal Affairs
Definition, Role and Documentation of the Safety Case: Quick Review
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Authorization and Inspection of Cyclotron Facilities Staff Requirements.
Authorization and Inspection of Cyclotron Facilities Inspections.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
19-20 March 2009 IAEA, Vienna RER/9/096 Regional Planning Meeting "Strengthening National Infrastructures for the Control of Radiation Sources" (TSA-1),
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.10 Documents to be Submitted to the Regulatory Body.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
Authorization and Inspection of Cyclotron Facilities Design, Layout and Shielding.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kyrgyz Republic.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ROMANIA.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
Authorization and Inspection of Cyclotron Facilities Radiation Protection of Staff.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Management and Safe Disposal of Radioactive Waste COUNTRY STATUS:ZIMBABWE By Rujeko Lynette Mpandanyama Tunis, March 2014.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency Burkina Faso Delwendé NABAYAOGO RAF9038 Final Coordination Meeting Arusha, Tanzania 2 – 5 December 2013.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
Expert Review of the Licensing Documentation of the Centralized Facility for Long-Term Storage of Disused Sealed Radiation Sources Oleksii Tokarevskyi.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Take 5 for Safety E. Lessard January 19, Credited Controls  Credited controls: controls determined through safety analysis to be essential for.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
(3.6) General requirements on resources for the establishment of IMS
Supporting “PEACEFUL SAFE AND SECUR APLICATION”
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
Module Planned exposure situations Public exposure (GSR Part 3)
Nuclear and Treaty Law Section Office of Legal Affairs
Regulation of Nuclear and Radiation Activity in Georgia
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
THAILAND Training and Tutoring Feedback
SESSION 3 Policy Framework
Nuclear and Treaty Law Section Office of Legal Affairs
RADIATION SAFETY IN NUCLEAR MEDICINE
Communication and Consultation with Interested Parties by the RB
Emergency Services/Operations
Research and Test Reactor Decommissioning Inspections
Judith Melin Director General Nuclear Power Inspectorate
Legal and Regulatory Framework for Nuclear Installations in IRAN
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop: Drafting School for Regulations. Radiation Safety Stream Country IAEA.
Current Radiation Protection Legislation in Slovakia
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Radwaste: status & way forward
Radiation Safety External hazards & antagonistic threats
S.M. Oyeyemi, T .C. Akpa, T.A. Faru
Radioactive Waste Management in the Czech Republic - the Role of Regulatory Body Poster describes the National framework, policy and strategy for radioactive.
The Transport standards
Safety requirements for predisposal management
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Course Structure

2) The Activities and Responsibilities of the Regulatory Body 1) Objectives and Scope 2) The Activities and Responsibilities of the Regulatory Body 3) Overview of Cyclotron Facilities 4) Cyclotron Accelerators: Operation and Components 2

5) Hot Cells and Production Systems 6) Interlocks, Alarms and Safety Systems 7) Design, Layout and Shielding 8) Radiation Protection Programs 9) Staff Requirements 3

10) Radiation Protection of Staff 11) Radiation Protection of the Public 12) Documentation of Procedures and Records Keeping 13) Radioactive Waste 14) Discharges in Cyclotrons Facilities 4

15) Accidents and Emergency Response Planning 16) Transport of Radionuclides 17) The Authorization Process 18) Authorization for the Construction of the Facility 19) Authorization for the Operation of the Facility 5

20) Authorization for the Decommissioning of the Facility 21) Inspections 6