Gas Lift Workshop – 2003 ISO Update

Slides:



Advertisements
Similar presentations
Update on ISO Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group
Advertisements

1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
ISO ESP Systems Task Group Leader, Shauna Noonan
WP4 – Task 4.4 LCA Activities
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
ISO activity for Motorcycle OBD connector
Institutionalizing the GHG Protocol Kevin Boehmer, Canadian Standards Association Mark Barthel, British Standards Institution WBCSD/WRI Side Event - The.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423 and API 6A WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries.
Meeting No.LocationDateHostGeneral Topics to be Addressed 1Houston02/05/98CamcoOrganize ISO Gas-Lift Committee 2Houston05/04/98CamcoDraft Outline for ISO.
19th January 2012 Don Wells (Hess)
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Swissmedic Swiss Agency for Therapeutic Products Hallerstrasse 7 CH-3000 Bern From Step 2 to Step 3 of the eCTD Introduction 2nd Follow-up.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Supply Chain Management Report for SC 18 January 2013.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by David Q. McDowell Chair, USTAG ISO TC130 USTAGs and Joint Working Groups.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
ISO/IEC FDIS : 2017 โดย นางสาวรัชฎาธร กังวาลไกล ผู้เชี่ยวชาญเฉพาะด้านการรับรองระบบงาน สำนักงานคณะกรรมการการมาตรฐานแห่งชาติ
Status of in-progress work of CEN/TC235 on revision of
Next Meeting – 6/24/06 Quebec City Notes from Phil Winters, CAFS
DROPS Focus Groups Human Factors
NBSAC Resolution US Coast Guard NBSAC October 2009
CEN/TC 12 and ISO TC67 SC4 Plenary meeting
Updates from SC18 Summer Meeting
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
API 14L Specification for Lock Mandrels and Landing Nipples
Update on the revision of ISO/IEC 17025
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
Impact on SC 6 Documents by Kenneth Young
INCLUDE BACKGROUND PICTURE
Gas Lift Workshop Breakout Session
ISO Task Group Update Wayne Mabry.
For more information or to nominate papers, displays, etc., contact:
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
API 14H Task Group Status Proper Classification of Document
Utility Meters Working Group
CHAIR - JIM BENNETT EXXONMOBIL
API SC 10, Work Group 3 Update:
Comments on IWG R55 proposal to GRRF
Impact on SC 6 Documents by Kenneth Young
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
Barents 2020 Phase 4 - Working Group RN04
WG Technical Editor’s Report
API 14H Task Group Status Proper Classification of Document
Water Directors’ Meeting Working Group D (Reporting) activities
For more information or to nominate papers, exhibits, etc., contact:
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
CHAIR - JIM BENNETT EXXONMOBIL
Final Version (after MS revision)
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Difference between regulated light source and light source modules
API 17H TASK GROUP June 26, 2013.
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

Gas Lift Workshop – 2003 ISO 17078 Update Wayne Mabry Manager – Gas Lift Manufacturing Schlumberger

Topics of Discussion Update ISO 17078.1 Update ISO 17078.2 2 WJM 4/26/2019

ISO/CD 17078‑1 Side-pocket mandrels Task group established 1998 Working Draft started 1998. Committee draft (CD) released 2001 Draft International Standard (DIS) released 2002. Final Draft International Standard (FDIS) projected released 2003 International Standard projected completion 2004. 3 WJM 4/26/2019

ISO/CD 17078‑1 Side-pocket mandrels Environmental Service Grades ¾      E1: "Standard" service. ¾      E2: "H2S" or "sour" service. ¾ E3: "CO2" service. ¾ E4: "Special" service. The user/purchaser shall specify the characteristics of the "special" service. 4 WJM 4/26/2019

ISO/CD 17078‑1 Side-pocket mandrels Design Verification Grades ¾       D1: Basic level of design verification. ¾ D2: Intermediate level of design verification (destructive testing). ¾     D3: Highest level of design verification (FEA/strain gauge testing and special wireline operational test). 5 WJM 4/26/2019

ISO/CD 17078‑1 Side-pocket mandrels Product Validation Grades ¾        V1: Basic level of product validation. ¾        V2: Intermediate level of product validation (5 % samples external & kick-over tested). ¾        V3: Highest level of product validation (100 % external & kick-over tested). 6 WJM 4/26/2019

ISO/CD 17078‑1 Side-pocket mandrels Quality Control Grades ¾       Q1: Basic level of quality control. ¾   Q2: Intermediate level of quality control (5 % samples NDE tested). ¾       Q3: Highest level of quality control (100 % radiographic tested). 7 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices for Side-pocket Mandrels Working Draft under development since 2002 Committee draft (CD) - January 2004 Draft International Standard (DIS) - August 2004 Final Draft International Standard (FDIS) - January 2005 8 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices API RP’s and Standards Included in ISO Specification API Standards included: ¾      11V1 Gas Lift Valves and Mandrels ¾     RP-11V2 Recommended practices for gas lift valve performance testing. ¾ RP-11V7 Recommended practices for repair, testing and setting gas lift valves. 9 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Other Topics Other Topics include: ¾      Environmental service classification ¾      Design verification requirements ¾      Product validation requirements ¾      Quality control requirements ¾      Elastomer testing requirements ¾      Qualifications for flow control device shop technicians ¾      Qualifications for gas-lift user/purchaser personnel 10 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Environmental Service Grades ¾      E1: "Standard" service. ¾      E2: "H2S" or "sour" service. ¾ E3: "CO2" service. ¾ E4: "Special" service. The user/purchaser shall specify the characteristics of the "special" service. 11 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Design Verification Grades ¾ D1: Basic level of design verification. D2: Intermediate level of design verification D3: Highest level of design verification D4: Highest level of design verification plus 12 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Design Verification Tests     ISO/CD 17078‑2 Flow Control Devices Design Verification Tests Design Verification Test Annex Design Verification (D) Grades   D1 D2 D3 D4 Documentation H Documentation of D1 tests. Grandfathering. D1 plus documentation of D2 tests. D2 plus documentation of D3 tests. D3 plus documentation of D4 tests. Interface testing I D1 tests per Annex I. D2 tests per Annex I. D3 tests per Annex I. Same as D3. Insertion testing J D1 tests per Annex J. Same as D1. Probe or travel testing K D1 tests per Annex K. Load rate testing L D1 tests per Annex L. Flow testing None D2 tests per Annex L. D3 tests per Annex L. Back check testing M D1 tests per Annex M. D2 tests per Annex M. Same as D2. D4 tests per Annex M. Close or open testing N D1 tests per Annex N. Actuation life cycle testing O D3 tests per Annex O. Erosion testing P D4 tests per Annex P. Shelf testing Q D1 tests per Annex Q. Port/seat leakage rate testing R D1 tests per Annex R. 13 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Design Verification Grades Product validation grades ¾        V1: Basic level of product validation. ¾        V2: Intermediate level of product validation ¾ V3: Highest level of product validation ¾ V4: Highest level of product validation plus 14 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Design Verification Grades   ISO/CD 17078‑2 Flow Control Devices Design Verification Grades Product Validation Test Annex Product Validation (V) Grades   V1 V2 V3 V4 Documentation H Documentation of V1 tests. V1 plus documentation of V2 tests. V2 plus documentation of V3 tests. V3 plus documentation of V4 tests. Probe or travel testing K None V2 tests per Annex K. V3 tests per Annex K. Same as V3. Load rate testing Flow testing L V1 tests per Annex L. V3 tests per Annex L. Back check testing M V1 tests per Annex M. Same as V1. V3 tests per Annex M. Open testing N V1 tests per Annex N. Close testing V2 tests per Annex N. V3 tests per Annex N. Shelf testing Q V1 tests per Annex Q. Port/seat leakage rate testing R V1 tests per Annex R. 15 WJM 4/26/2019

ISO/CD 17078‑2 Flow Control Devices Quality Control Grades ¾       Q1: Basic level of quality control. ¾      Q2: Intermediate level of quality control ¾       Q3: Highest level of quality control 16 WJM 4/26/2019

ISO/CD 17078‑3 Latches and Wireline Tools Projected milestones ¾       WD started 2003. ¾      WD to be submitted to WG4 2004 ¾      CD to be submitted for comments 2004 ¾      DIS to be submitted to comments 2005 ¾      FDIS to be submitted for approval 2005 ¾      FDIS to be approved 2006 17 WJM 4/26/2019