Forth Estuary Forum 28th Nov 2013

Slides:



Advertisements
Similar presentations
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Advertisements

The Renewable Future for the UK
O&M Modelling for Large Scale Offshore Wind Farms
Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
AEGEAN INTERCONNECTION PROJECT Athens, 24 th May, 2011.
Econnect Ltd Independent specialists in the grid integration of renewable energy...
Oceans of opportunity Harnessing Europes largest domestic energy resource European Offshore Wind Conference September 2009 Justin Wilkes Head of.
Europe's priorities Our goals Why a 2030 framework now?
PPI NIOC Pars Oil & Gas Company South Pars Gas Field Development – Phase 19 1 Load Out of Jacket 19C Offshore Facilities Load Out of T.D.A.D.
Offshore Wind Floating Foundations the competitive technology
Managing Trees for Energy Andrew Clark (Fuel Quality & Compliance Manager) Energy Made Better.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Offshore Wind 2004 From Vindeby to Nysted A Manufacturer’s Experience Henrik Stiesdal Bonus Energy A/S.
Managing Director, HVPD Ltd
Ilinca Julian, Heikki Ojanen, Juha - Matti Lukkari.
© ABB Group May 1, 2015 | Slide 1 Large scale integration of Offshore Wind Power Design Considerations Peter Sandeberg /ABB, EOW 2009,
Wind Energy Wind power is the conversion of wind energy into a useful form of energy, such as using wind turbines to make electricity, wind mills for mechanical.
THE MONOPOD BUCKET FOUNDATION Recent experience and challenges ahead Christian LeBlanc1, Kim Ahle1, Søren A. Nielsen 2, Lars B. Ibsen 3 1) DONG Energy,
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
Offshore Wind Project Logistics & Unique Site Technology Investigation – Fabrication - Installation Presentation to: Virginia Offshore Wind.
Growing Offshore in Turbulent Times Michael Hannibal, Head of Sales, Offshore Business Unit, Siemens Wind Power.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Windpower. The contribution of Renewable Energy Sources to the world energy suply in 2040 – Projections in Mtoe.
Scroby Sands Offshore Wind Farm Update 18 April 2002 Anne-marie Coyle.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Walney Extension offshore wind farm Meeting with the Planning Inspectorate Bristol 1 st March 2013.
Energy From the Severn Estuary Trinity College, Bristol, March 10 th 2007.
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
Deep Water Offshore Wind Energy By Paul D. Sclavounos Horns Rev Wind Farm (Denmark) - Rated Power 160 MW – Water Depth 10-15m.
Hydrodynamic Analysis and Optimal Design of Floating Wind Turbine and Ocean Wave Energy Systems Paul D. Sclavounos Professor of Mechanical Engineering.
Wave Energy Technologies: Criteria for Success
C-Power NV is a Belgian company established for the development and implementation of a farshore wind farm on the Thorntonbank. Welcome Objective Partners.
Centrica – An Energy Utility Perspective Gearόid Lane Director, British Gas New Energy 29 th April 2009.
Claire Gibson, Wave Hub General Manager 19 February 2013
Fair Head Tidal & West Islay Tidal An overview of the consenting process Fourth Annual HMRC Forum 24 th April 2013 Clodagh McGrath: Environmental Manager.
Wind Farm Design and Engineering Mark Legerton Head of Engineering and Supply Chain April 2010.
Technical and Economic Analysis for Far Offshore Wind Farm Accommodation Nick Chung Ioannis Karakitsos Godstime Martins Pablo Morato Dominguez Olga Uflewska.
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
Scottish Renewable Energy Infrastructure Plan Emerging Conclusions Euan Dobson 3 November 2009.
Prof. R. Shanthini 02 Feb 2013 Module 06 Renewable Energy (RE) Technologies & Impacts (continued) - Use of RE sources in electricity generation, in transport,
OWEMES OWEMES 2009: Brindisi (21 – 23 May, 2009) Structure of the presentation:  Part One: Introduction on TPWind  Part Two:SRA / MDS  Part Three:
Stephen Kerr Beatrice Offshore Windfarm. STW Offshore Wind Supply Chain 2 nd February 2010 Inverness.
DOE Peer Review May 10, 2006 Golden, CO Walt Musial Leader-Offshore Projects National Renewable Energy Laboratory Offshore Wind.
Dan Finch Moray Offshore Renewables Ltd. DELIVERING ROUND 3 Inverness 2nd February 2010 MORAY FIRTH OFFSHORE RENEWABLES Ltd.
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
Floating Offshore Wind Turbines Floating Offshore Wind Turbines An Aeromechanic Study on the Performance, Loading, and the Near Wake Characteristics of.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
NAVITUS BAY UPDATE Sean Matthews Project Engineer 20 March 2013.
M.E.F. Mechanical Energy Factory Mechanical Power Converter & Re-Generator System.
Offshore Wind Farms An overview… UE VISION FOR % energetic efficiency -20 % greenhouse gas emissions 20 % of energy from renewable.
An Overview of the Technology and Economics of Offshore Wind Farms
Offshore Wind Energy in the region – EMDEN (Germany)
Restricted © Siemens AG 2014 All rights reserved.siemens.com/answers Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference.
North Coast Wind Farm Tolano Environmental Consulting.
Energy System Investment Models Paul Rowley & Simon Watson CREST Loughborough University.
Building Offshore Wind in England: Centres of Offshore Renewable Engineering (C.O.R.E) British Embassy, Lisbon, 25th October 2012.
15ELP044 – Unit 4 Uncertainty, Risk & Energy Systems Paul Rowley & Simon Watson CREST Loughborough University.
SME opportunities in the drive towards 2030 targets
Planning and Realisation of Wind Farms
HYDROELECTRIC CORPORATION
Renewables: Moy Wind Farm
Estimation of the Optimum Wind Turbine Size for Two Different Offshore Sites and Wind Farm Rated Powers MSc. Candidate: Shajid Kairuz Fonseca Supervisor:
Renewables Capability Presentation All Energy May 2017
Icebreaker Wind Supply Chain Open House
PROJECT GRANTED UNDER INDO-EUROPEAN COOPERATION ON RENEWABLE ENERGY
Straddling the Divide – Oil & Gas in to Renewables I Alan MacLeay – Engineering Director Renewables 10 November 2018.
Introduction Life cycle impacts to be considered for several LEANWIND innovations, including: foundation design vessel design novel O&M methods Initial.
The supply chain’s role in the journey to ‘subsidy free’
Hybrid Offshore Wind and Tidal Systems
Presentation transcript:

Forth Estuary Forum 28th Nov 2013 The Seagreen Project in the Firth of Forth Round 3 Zone Nick Brockie, SSE Renewables Seagreen Offshore Project Manager

Seagreen Wind Energy Limited SSE Renewables and Fluor Ltd joint venture (partners on Greater Gabbard OWF development) For development, construction and operation of offshore wind farm projects in the Firth of Forth Round 3 Zone Contractual Zone Development Agreement with The Crown Estate Target generation capacity 3,500MW, up to 7 offshore wind farms. The Crown Estate development partner, sharing some development costs.

SSE Renewables Offshore Wind Part of SSE plc - approximately 11,500MW electricity generation capacity Over 3,000MW Renewables capacity (hydro, onshore wind, offshore wind) Operational offshore wind farms Greater Gabbard 500MW (with RWE) Walney 1&2 370MW (with Dong) Also 4,400MW coal fired; 4,500MW gas and oil fired capacity

SSE Renewables Offshore Wind Significant investment in development of offshore wind capacity by SSE Renewables, with a range of partners Galloper OWF (consented May 2013) - up to 500MW Beatrice OWF (Moray Firth) - up to 1,000MW Firth of Forth R3 Zone (Seagreen) - up to 3,500MW Islay OWF - up to 750MW Dogger Bank R3 Zone (Forewind) - up to 9,000MW Hunterston – National Offshore Wind Turbine Test Facility

SSE Renewables Offshore Wind Beatrice Firth of Forth Zone Islay Hunterston Dogger Bank Zone Walney 1&2 Greater Gabbard, Galloper

SSE Renewables Offshore Wind National Offshore Wind Turbine Test Facility at Hunterston

Offshore Wind Turbines Mitsubishi Sea Angel Siemens NG6 Rotor - 154m Hub height - 100m No Gearbox – direct drive 6.0 MW (2 x 3.0MW Generators) Rotor - 167m Hub height - 110m Hydraulic drive 7.0 MW (2 x 3.5MW synchronous generators)

Firth of Forth Zone - Seagreen Phase 1 Offshore Project Zone area 2,850km2 23km min to 80km offshore Water depth 35m to 70m 3 Development Phases Phase 1 (offshore application Oct 2012) 400km2 total area Up to 150 WTGs 1,050MW max capacity Export cable landfall Carnoustie

Firth of Forth Zone – Seagreen Phase 1 Offshore Project

Firth of Forth Zone – Seagreen Phase 1 Onshore Project HVAC HVDC Landfall at Carnoustie 19km underground cable New substation at Tealing Planning consent achieved November 2013!

HOW TO BUILD AN OFFSHORE WIND FARM? Key Components Met mast(s) Wind turbine generators Array cables Offshore substation Export cables (offshore and onshore) Onshore substation

Firth of Forth Zone – Seagreen Phase 1 Offshore Project Indicative wind farm layouts (150 WTGs)

Offshore Wind Farm Design – Foundations and Substructures Monopile Multileg (jacket) Gravity base Suction pile

Foundation and Substructure Design Considerations Water depths Ground conditions Construction / logistics Installation method Environmental impact Cost!!!

Offshore Substations Collection point for array cables Steps up voltage Export back to onshore substation HVDC or HVDC OSP AC 500MW DC 1GW Length (m) 45 86 Breadth (m) 50 Height (m) 40 55 Weight (te) 2,500 16,000

Offshore Wind Farm Construction Port facilities lay down and load out Installation vessels Jack-up, transport barge, cable lay, ROV support, guard, floating heavy lift, personnel transfer vessel.. etc Capacities and Operability

Cable Installation Array cables and Export cables Buried in the seabed - ploughing or jetting Cable Protection – rock dump or concrete mattress

Offshore Wind Farm Operation and Maintenance 25 year working life Monitoring and service Preventative and corrective maintenance Minimise downtime and lost revenue O&M Vessels Crew transfer vessels (helicopters?) Heavy lift Survey / ROV Offshore service vessels? Floating accomodation?

Firth of Forth Round 3 Zone - Phase 1 Offshore Project Project Alpha visualisation – Braes of Lunan