Module 5 Improvement/upgrade plan

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

Work-Planning and Reporting
1. Session structure Overview Mini-exercise Actions Challenges Benefits/output Exercises Module 10 WSP review 2.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
1. Session structure Overview Actions Definition Challenges Outputs Exercises Module 11 WSP revision following incident 2.
1. Module 1 Assemble the WSP team Session Structure Overview Actions Challenges Outputs Exercises 2.
1. Module 2 Describe the water supply system Session structure Overview System components and description Outputs Challenges Factors to consider Exercise.
1. Session structure Overview Definition & examples Actions Outputs Challenges Exercises Module 4 Control measures & risk reassessment 2.
Human factors Training & Competence CaspianExplorer.com.
1 Water Quality Monitoring through implementation of Water Safety Plan Dr A Gunasekar WHO Country Office for India.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Safety Hazard Identification on Construction Projects Gregory Carter1 and Simon D. Smith2 ASCE, February 2006.
Sultanate of Oman Oman Drinking Water Safety Plan.
1. Session structure Overview Example definition Actions Example output Challenges Exercises Module 3 Identify hazards and assess risks 2.
Water quality management training for operational staff 1.
Risk Assessment – An Essential Standard
Basics of OHSAS Occupational Health & Safety Management System
1 EPA Advice Note on Water Safety Plans in Ireland Derval Devaney EPA 28/29 February 2012.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Software Project Management
Unit 14: Developing a Corrective Action Program Unit Introduction and Overview Unit objectives:  The purpose of a CAP  How a CAP benefits and supports.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 8 Prepare management procedures 2.
Proposed Supply Chain Risk Management Process Flow Supply Chain Risk Leadership Council 20 April 2009 DRAFT.
1. Session structure Overview Actions Outputs Challenges Exercises Module 6 Monitoring control measures 2.
1 ICAO Developments in Safety Management Captain Len Cormier CTA COSCAP-NA.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 9 Develop supporting programmes 2.
Information Security: Model, Process and Outputs Presentation to PRIA WG November 10, 2006.
2.2.3 Managing risk in a humanitarian response Learning objectives: At the end of this session, participants will be able to: Define risk List potential.
Monitoring Know the importance of monitoring in humanitarian response Be aware of different elements of monitoring Identify challenges and tips for effective.
{ Risk Management. Step 1. Identify the hazards Identify all hazards associated with the systems of work Risk Management Four Step Process.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Risk Assessment Meeting Introduction Slides --- Your Hospital’s Name --- Hospital at Night Patient Safety Risk Assessment:
Risk Assessment Meeting Introduction Slides --- Your Hospital’s Name --- Hospital at Night Patient Safety Risk Assessment:
1. Session structure Definition Actions Outputs Challenges Exercises Module 7 Verify WSP 2.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Module 3 Identify hazards and assess risks
Risk management «Once we know our weaknesses, they cease to do us any harm.» G.C. Lichtenberg.
CompTIA Security+ Study Guide (SY0-401)
People and Culture Office Safety, Health and Wellbeing
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
An Overview on Risk Management
Module 7 Verify WSP Session structure Definition Actions Outputs
ISO 14001: 2004 Environmental Management Review Presentation
Scrutiny of RIAs Problem Definition and Objectives
WSP quality assurance tool
People and Culture Office Safety, Health and Wellbeing
Water quality management training for operational staff
Fundamentals of Monitoring and Evaluation
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
Module 2 Describe the water supply system
Module 8 Introduction to Validation
Module 1 Assemble the WSP team
Module 8 Prepare management procedures
Module 9 Develop supporting programmes
Project Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Module 10 WSP review Session structure Overview Mini-exercise Actions
Module 11 WSP revision following incident
People and Culture Office Safety, Health and Wellbeing
WHO Global Influenza Programme
Module 6 Monitoring control measures
Effective Risk Management in Decision Making Process
Мinistry of finance of the kyrgyz republic meeting of the pempal TCOP working group on public sector accounting мinsk, Belarus, October 03-05, 2016.
Simulation Activity: Yield and cost based on allocation of HTS resources IAS 2018 Amsterdam, Netherlands July 25th, 2018.
Welcome to the CSBM workshop:
RISK MANAGEMENT.
Root Cause Analysis Identifying critical campaign challenges and diagnosing bottlenecks.
Presentation transcript:

Module 5 Improvement/upgrade plan Session structure Why do we need an improvement/upgrade plan? Overview Actions Challenges Outputs Exercises

? Module 5 Improvement/upgrade plan Do you know what to do? Why do we need an improvement/upgrade plan? Prioritize action for each uncontrolled or ineffectively controlled risk Implement short-, medium- and long-term activities Maximize effectiveness of resources ? Do you know what to do?

Module 5 Improvement/upgrade plan Overview Improvement/upgrade plan involves Development Implementation Maintenance Monitoring and review of upgrades Required due to absent or ineffective control measures Should explicitly state who is responsible

Introduction of new controls could introduce new risks Module 5 Improvement/upgrade plan Introduction of new controls could introduce new risks

Module 5 The plan (iterative process) New risks? Uncontrolled risks? Short Medium Long term Develop plan Implement plan Evaluate plan Amend plan Recalculate the risks Update the WSP

Module 5 Improvement/upgrade plan Example plan Review example plan in workbook Invent a new “action” Complete rest of table: Arising from Improvement plan Accountabilities Due Status What other factors need to be considered when developing an upgrade plan (see Appendix G)? E.g. Is there a need for research and development?

Module 5 Improvement/upgrade plan Challenges Ensuring WSP is up to date Securing finances Lack of resources Ensuring new risks are not introduced or are mitigated

Module 5 Improvement/upgrade plan Outputs A prioritized improvement/upgrade plan for addressing each uncontrolled risk Implementation of short-, medium- and long-term activities for upgrade A process for monitoring the plan

Module 5 Improvement/upgrade plan Exercise In small groups Develop a suitable “health awareness campaign” for your water supply area (10 minutes) Identify key factors that need consideration for financial investment of a system upgrade activity to be realized – outline a draft proposal (20 minutes)

Module 5 Improvement/upgrade plan Summary of WSP stage 2 – system assessment Describe the water supply system (Module 2) Identify the hazardous events/hazards & assess the risks (Module 3) Determine & validate control measures, reassess & prioritize risks (Module 4) Develop, implement & maintain an improvement/ upgrade plan (Module 5) Catchment Treatment Distribution User Any agent or event that can cause harm. Likelihood and consequence of occurrence What is preventing hazardous events/hazards from occurring? How can you be sure these controls are suitable? A plan is needed if existing controls are ineffective or absent