TGy March Closing Report

Slides:



Advertisements
Similar presentations
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /1444r4 Submission Jan 2013 Adrian Stephens, Intel CorporationSlide Jan 2013 Motions Date: Authors:
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
Task Group G Report January 17, 2003
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
TGaf San Francisco Closing Report
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
TGaf Waikoloa Closing Report
November 2008 doc.: IEEE /1437r1 July 2010
TGz Beijing May 2010 Closing Report
TGy January Closing Report
IEEE Motions in July Plenary DCN:
TGaf Geneva Closing Report
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
TGaf Indian Wells Closing Report
TGaf San Antonio Closing Report
TGy March Report Date: Authors: March 2008 March 2008
TGaf Waikoloa Closing Report
Mar 2010 Closing Plenary Motions
IEEE TGaf DRAFT Meeting Plan and Agenda
TGu Motions Authors: March 2010 Date: March 2010
Motion #1: TGaq EC Report
TGu Teleconference Motions
TGad March 2011 Closing Report
TGy Jan Opening Report Date: Authors: January 2008
TGak November Closing Report
July 2011 Closing Plenary Motions
TGad May 2011 Closing Report
November 2010 Closing Report
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
Task Group G Report January 17, 2003
TGy March Report Date: Authors: March 2008 March 2008
TGy Nov Opening Report Date: Authors: November 2007
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
TGaf San Antonio Closing Report
P802.11aq Report to EC on approval to forward draft to RevCom
May 2008 Closing Plenary Motions
TGs San Diego Closing Report
IEEE aj May Closing Report
September 2008 doc.: IEEE /1003r0 Sep 2010
Presentation transcript:

TGy March Closing Report doc.: IEEE 802.11-08/0387r0 March 2008 TGy March Closing Report Date: 2008-03-19 Authors: Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

March 2008 doc.: IEEE 802.11-08/0387r0 March 2008 Abstract This submission summarizes the TGy activity for IEEE 802.11 Orlando (March 2008) meeting Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

March 2008 doc.: IEEE 802.11-08/0387r0 March 2008 TGy Report 08/318r2 March Report, 08/0359r0 March Plenary Meeting minutes, 08/0319r2 March Sponsor Ballot Conditional Report TGy started after March 2006 plenary, received 39 submissions, created 72 body pages of draft text 1190 participant hours, resolved 1633 comments There were 12 comments with processing errors – thanks for commenter’s forbearance while we corrected our mistakes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

March 2008 doc.: IEEE 802.11-08/0387r0 March 2008 Motions (3) Motion: To approve document 08/0319r2 as the report to the 802 Executive Committee (EC) on the requirements for conditional approval to forward 802.11y to RevCom. Moved: Rich K Second: Jim R Vote: 13-0-0 Motion: Passes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

March 2008 doc.: IEEE 802.11-08/0387r0 March 2008 Motions (4) Move to request conditional approval to send the draft of 802.11y to RevCom upon the conclusion of a Sponsor Recirculation Ballot that meets all requirements for recirculation ballots. Moved: Jim R Second: Rich K Vote: 12-0-0 Motion: Passes P802.11y Draft 8.0 had a 94.9% approval on the last Sponsor Recirculation Ballot. There were 5 voters that had voted Disapprove. 1 of the 5 NO voters changed to an Approve vote. Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

Attendance March 2008 Tuesday AM1: Peter Ecclesine, Cisco Systems doc.: IEEE 802.11-08/0387r0 March 2008 Attendance Tuesday AM1: Peter Ecclesine, Cisco Systems Rich Kennedy, ETS-Lindgren Eldad Perahia, Intel Corp Jim Petranovich, Viasat Douglas Chan, Cisco Systems Dan Lubar, Relay Services Dick Roy, Connexis Jim Raab, Dell Computer Jeremy Landt, Transcore Alaistair Malarky, Mark IV Industries Wayne Fisher, ARINC Brian Hart, Cisco Systems Tushar Moorti, Broadcom Randy Roebuck, SIRIT/OmniAir Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems