Download presentation
Presentation is loading. Please wait.
1
TGy January Closing Report
doc.: IEEE /0123r1 January 2008 TGy January Closing Report Date: Authors: Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems
2
January 2008 doc.: IEEE /0123r1 January 2008 Abstract This submission summarizes the TGy activity for IEEE Taipei (January 2008) meeting Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems
3
January 2008 Motions (3) To authorize an y ad hoc Sponsor Ballot comment resolution meeting on February 11th and 12th in San Jose, CA starting at 12:00 ET Moved: Rich K (ETS-Lindgren) Second: Brian H. (Cisco Systems) Vote: Unanimous approval Motion: Passes Peter Ecclesine, Cisco Systems
4
January 2008 doc.: IEEE /0123r1 January 2008 Motions (4) Motion: Move to approve the comment resolutions for the y Sponsor Ballot, conditional on that ballot passing, and to reaffirm all comment resolutions in the opening meeting of 's next plenary. Moved: Rich K (ETS-Lindgren) Second: Doug Chan (Cisco Systems) Vote: 5-0-0 Motion: Passes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems
5
Schedule Projected at Taipei (Jan)
January 2008 doc.: IEEE /0123r1 January 2008 Schedule Projected at Taipei (Jan) January 2008 (Taipei, Taiwan) In Sponsor Ballot until Jan 30th Feb 11, 12 Ad Hoc SB Comment resolution, start 1st SB re-circ March 2008 (Orlando) Sponsor Ballot Comment Resolution, 2nd SB Re-circ ExCom Conditional Approval to end May 2008 (Jacksonville) WG Approval June 2008 RevCom Approval Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems
6
Attendance Tuesday AM1: Peter Ecclesine (Cisco Systems)
January 2008 doc.: IEEE /0123r1 January 2008 Attendance Tuesday AM1: Peter Ecclesine (Cisco Systems) Rick Kennedy (ETS-Lindgren) Doug Chan (Cisco Systems) Brian Hart (Cisco Systems) Eldad Perahia (Intel Corp) Dorothy Stanley (Aruba Networks) Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.