WG Environmental Accounts

Slides:



Advertisements
Similar presentations
Anne Louise Friedrichsen, LIFE unit LIFE+ Results and lessons learned from the first application round 2007 Anne Louise Friedrichsen, European Commission.
Advertisements

1 Owner-Occupied Housing Summary of the pilot Item 5 of the Agenda D4 – Price Statistics HICP Working Group Luxembourg October 2007.
Working Group on Environmental Expenditure Statistics Luxembourg, March 2015 EGSS data production and dissemination (point 3.1 of the agenda) Eurostat.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
The CAP towards 2020 Implementation of Rural Development Policy State of Play of RDPs Gregorio Dávila Díaz DG Agriculture and Rural Development.
Part-financed by the European Union The Baltic Sea Region Programme by the Joint Technical Secretariat BSR INTERREG III B Neighbourhood Programme.
WG Environmental Expenditure Statistics OECD/Eurostat Joint Questionnaire on EPER Results from 2010 data collection Luxembourg, March 2011.
Contractual obligations
DIMESA JUNE Legal Base for Environmental Accounts: Next Steps
Working Party on Regional Statistics 1-2 October 2012
EU Water Framework Directive
5. Areas under organic farming
Ag.no. 16 Supplement to Eurostat Annual Report, October 2014
Jürgen Förster, Eurostat E3 Environmental and forestry statistics
GBV survey: progress EUROSTAT 20 March 2018.
The 2006/2007 Urban Audit data collection
Updating of the Reporting Guidance for the Floods Directive: Context
Eurostat – Unit E2 Annamaria Szirony
EGSS results of 2013 data collection (point 3.1 of the agenda)
Eurostat Task force on victimisation surveys,
Compliance Item 4.2 Compliance Doc. ASA/TE/743-rev1
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG Item 8 ESS Security Assurance Pascal Jacques ESTAT B2 Local Security Officer.
Ag.no.16 A65 country manuals and country assessments
MISSOC NETWORK MEETING Amsterdam, 6-7 June 2016
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Environmental goods and services sector
Main changes and Eurostat's involvement
on Priority Substances Strategic Coordination Group
Review plan of the nature reporting – update 7
NUAC meeting May Overview of data - Metadata
City statistics – state of play of data collection
Agenda Item 2.1 SES 2014: follow-up
1.
&file 22/02/2019 National Programmes under the National Emission Ceilings Directive (NECD) André Zuber, European Commission, DG Environment Working group.
on Priority Substances Strategic Coordination Group
LAMAS October 2016 Agenda Item 2.1
WG Environmental Accounts / Environmental Expenditure Statistics
Regional Government expenditure statistics
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Item 8.1 Implementation of the 2016 Adult Education Survey
Programme adoptions Cohesion Policy:
Ag.no. 15 Lessons from the 2016 A65 exercise
Item 7.1 – Overview of 2012 UOE data collection
SBS Quality reporting item 4 of the agenda
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Item 7.1 – Overview of 2013 UOE data collection
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Item 4.1 – Overview of 2014 UOE data collection
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Current state & Prospects of implementation
Water scarcity & droughts
ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189.
Item 4 Overview of the 2016 AES & 2015 CVTS data collection
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Gender Based Violence State of Play Item 5 of the draft agenda
Update on implementation WG F 27 April 2010 Maria Brättemark
European Statistical Training Programme (ESTP)
Item 3 Observed consistency and revisions
Doc.A6465/14/05 Ag.17 A65 annual review 2013
LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios
COMITOLOGY ITEMS (Point 4. on the agenda)
Doc.A6465/16/03 Ag.no.16 A65 country manuals
WP 1 Management and Coordination
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
Review of the Art 17 Reporting - update to the Habitats Committee
Teodora Brandmuller Unit E4
Item 11 Preliminary results of the second phase of the Cost analysis of European Statistics (by products) in the ESS Walter Sura, A.2 – Strategy and.
Implementing the ESS Vision 2020
2015 January February March April May June July August September
Presentation transcript:

WG Environmental Accounts 9.3 Environmental Accounting European Statistical System grants Luxembourg, 23-24 March 2009

Management of grants Brief summary on the outcome of grants 2008 Outlook on the grants programme of 2009 Comments on: Final Reports of the grants programme 2007 the payment procedure March 2009 Environmental Accounting grants

Management of grants 2008 grants Technical Description of Action based on Implementation Plan Main priorities fulfilment of data gaps Core areas: EPEA MFA NAMEA Air Methodological development of certain issues March 2009 Environmental Accounting grants

Management of grants 2008 grants Procedure (1st round): Warning email 27 February 2008 Launched 11 March 2008 Deadline 25 April 2008 Evaluation Committee 14 May 2008 Grant award report signed June 2008 Project start: as of 1 January 2009 March 2009 Environmental Accounting grants

Management of grants 2008 grants (1st round) Budget of €900,000 21 applications (20 accepted) 15 countries (incl. 16 institutions) 26 projects 5 EPEA (B –FPB-, BG, MT, SI, SE) 5 MFA (BG, ET, LV, NL, SE) 4 NAMEA Air (B –FPB-, DK, HU, NO) 4 EGSS (DE, NL, NO, SE) I March 2009 Environmental Accounting grants

Management of grants 2008 grants (2nd round) 1st round did not fully meet objectives Remaining amount: EUR 130,000 Procedure: Launched 1 July 2008 Deadline 1 September 2008 Evaluation Committee 18 September 2008 Grant award report signed 17 October 2008 Project start: as of 1 January 2009 March 2009 Environmental Accounting grants

Management of grants 2008 grants (2nd round) 4 applications 4 countries 4 projects 1 Env. Protection Expenditure (UK) 2 NAMEA Air (FI, PL) 1 NAMEA Waste (PT) all applications accepted March 2009 Environmental Accounting grants

Management of grants 2009 grants (Budget of €900,000) Technical Description of Action based on Implementation Plan 2009-2010 (revised ESEA) Fill data gaps in core areas Apply stricter approach: priority to core areas exception in case of appropriate coverage March 2009 Environmental Accounting grants

Management of grants Reports 2007 Art. 1.5 of the Grant Agreement: Final Technical Implementation Report Evaluation of more than 30 Reports Assessment against objectives in the WP March 2009 Environmental Accounting grants

Management of grants Reports 2007 Work Programme of the grant application Recommendations: Use most recent reporting tables Avoid confusing different types of breakdowns Follow work plan Be specific but leave room for the unexpected March 2009 Environmental Accounting grants

Management of grants + request for payment: Payment procedure 45 days for final technical implementation report + request for payment: Including all payment docs as stated in the grant agreement 90 days for the Commission for the approval + payment Use of Annex III: Model request for payment « Certification of honour » March 2009 Environmental Accounting grants

Thank you for your attention Management of grants Thank you for your attention March 2009 Environmental Accounting grants