Presentation is loading. Please wait.

Presentation is loading. Please wait.

ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update 24-25 /09/ 2007 ETS working group.

Similar presentations


Presentation on theme: "ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update 24-25 /09/ 2007 ETS working group."— Presentation transcript:

1 ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update
24-25 /09/ 2007 ETS working group

2 Current situation CVTS 3: situation on 20 September 2007
The relevant regulations provide for data delivery at the latest on 30 June 2007 CVTS 3: situation on 20 September 2007 No data Processing Close to validation Validated countries FI IE IT CY FR LV SI CZ GR SK AT, BE, BG, DE, DK, EE, ES, HU, LT, LU, MT, NL, NO, PL, PT, RO, SE, UK 24-25/09/2007 ETS working group

3 Next steps Quality report is expected by the end of September 2007
First data delivery with existing data within the next 2-3 weeks, in the national reform plan analysis context By the end of the year, full delivery of indicators In 2008, analysis and synthesis of the quality reports For the MS: Quality report is expected by the end of September 2007 24-25/09/2007 ETS working group


Download ppt "ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update 24-25 /09/ 2007 ETS working group."

Similar presentations


Ads by Google