Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.A6465/14/05 Ag.17 A65 annual review 2013

Similar presentations


Presentation on theme: "Doc.A6465/14/05 Ag.17 A65 annual review 2013"— Presentation transcript:

1 Doc.A6465/14/05 Ag.17 A65 annual review 2013 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting in Luxembourg on 24th & 25th March 2014

2 Content of this presentation
Data supply Approach used in 2013 Different calculations Content of report

3 Main conclusions – Submission
31st July target date for SRQ submission was largely achieved change of national contact for ES (6.9 personnel change), HR (18.11 first time), LU (1.10 personnel change), AT (14.10 personnel change) Other late receipt from DK (30.9), EE (11.10), HU (22.8), RO (5.8), SK (11.10), SE (17.9) Data incomplete for: RO (only staff numbers, not salary) FI (detailed review of methodology)

4 Main conclusions – Validation
Explicit validation by target date achieved for 14 countries Tacit/subsequent validation for 6 : CZ, DK, EL, LU, PT, SK Problems resolved bilaterally for 5 : BG, MT, PL, SE, UK HR participating for first time

5 Main conclusions – Supplied Data
Data supplied for upper/median/lower steps in grade for 21 countries. Non supply linked to specific national circumstances: No data for upper and lower steps for DK, PL, SK, SE No data for median step in grade for IT, LU, UK No data for modal grade for any country Data married = single for BG, CY, PL, SE, UK (no distinction in national remuneration system)

6 Main conclusions – Sample coverage
Sample coverage 100% except for CZ (88%), CY (97%), LV (98%), HU (95%), AT (90%), PT (85%), SI (75%) SK (30%), EE (53%), UK (69%)

7 Main conclusions – eDAMIS
eDAMIS successfully used by 21 countries from EE, IE, HR, LU, NL, AT, UK Automatic updating procedure  use of eDAMIS even more important (audit trail)  Demonstration at end of today

8 Reminder of the agreed approach for 2013
At March 2013 WG, renewed at Sept WG Required due to expiry of Annex XI General methodology per A65/08/08, adapted for Global specific indicator: all 28 member states Inflation in headquarters: BE HICP Eurostat also did whatif? Calculations Finally, Regulation 1023/2013 (October) imposed a pay freeze

9 2013 Annual Adjustment scenarios
Sample 2013 GSI HICP BELU +1.5 101.5 +1.6 101.6 EU 11 -1.7 98.3 -0.1 9.9 EU 28 -1.4 98.6 +0.1 100.1

10 2013 ESTAT report A64 elements: became SWD(2013)453
A65 elements: prepared  not transmitted No formal Commission Communication or proposed Regulation for A65 part Agreement to present at A6465WG March 2014 Apart from separation A64+A65, similar structure of A65 part to report for 2012 and previous years Expanded to cover EU28

11 Outline of 2013 ESTAT report (A65 part)
Main text Short (15p); key tables; main results for staff and for pensioners. Annex 1 Short (24p); explanations, analyses, detailed tables. Annex 2a, 2b Long (230p); detailed remuneration tables; (traditionally a room doc.) Annex 2c Short (23p); control indicators. Annex 3 Moderate (56p); time series analysis. Addendum Short (4p); alternative calculations.

12 Potentially affected remuneration of
Staff of EU institutions Permanent officials Temporary agents Contract agents Pensioner + European School Teachers But not this year, due to pay freeze Similarly, by collaboration: Coordinated Organisations, EPO, EuroControl, CERN, ESO

13 A64 (CC) content of report did apply
Staff of EU institutions outside Brussels & Luxembourg European School Teachers, Researchers under FP7 (Marie Curie), Education exchange under LLL (LdV, Comenius) (Joint sickness insurance scheme) (Mission expenses) Coordinated Organisations, EPO, EuroControl, CERN, ESO, UN ICSC, certain MS foreign services General public


Download ppt "Doc.A6465/14/05 Ag.17 A65 annual review 2013"

Similar presentations


Ads by Google