Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.

Slides:



Advertisements
Similar presentations
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
1. 2 Earthquake effects on health care facilities 2.
VOORBLAD.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC Utility Design Study for Kitakami-site
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
CLIC / ILC Collaboration for CFS works
Presentation transcript:

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 2 Outline CFS Introduction CFS Introduction Geotechnical Conditions and Construction Methods Geotechnical Conditions and Construction Methods Description of CFS Cost Drivers Description of CFS Cost Drivers Americas and European Design Americas and European Design CFS Schedule CFS Schedule Summary Summary Asian Design – A Enomoto Asian Design – A Enomoto

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 3 CFS Introduction and Regional Overview Overall Siting Approach was to Initially Identify a Sample Site in Each of the Three Global Regions Overall Siting Approach was to Initially Identify a Sample Site in Each of the Three Global Regions Americas and European Sites Still Considered Sample Sites Americas and European Sites Still Considered Sample Sites Asian Region has Identified Two Candidate Sites Asian Region has Identified Two Candidate Sites All Regions Used the Same Beamline Lattice Design All Regions Used the Same Beamline Lattice Design Underground Enclosures were Tailored to Meet Local Site Geologic and Topographical Conditions Underground Enclosures were Tailored to Meet Local Site Geologic and Topographical Conditions Local Conditions Also Affected the Type of HLRF System Used Local Conditions Also Affected the Type of HLRF System Used Americas and Europe Used the Klystron Cluster System (KCS) Americas and Europe Used the Klystron Cluster System (KCS) Asia Used the Distributed Klystron System (DKS) Asia Used the Distributed Klystron System (DKS)

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 4 Regional Geotechnical Conditions and Underground Construction Methods (1) Americas Region Americas Region Sample Site Centered on Fermilab Sample Site Centered on Fermilab Uniform Surface Elevation Supports Surface Buildings Uniform Surface Elevation Supports Surface Buildings Uniform Galena-Plattville Dolomite Limestone Strata Uniform Galena-Plattville Dolomite Limestone Strata Tunnel Depth ~130 m Tunnel Depth ~130 m Main Underground Access by Vertical Shaft Main Underground Access by Vertical Shaft TBM Excavation Method Used for Main Tunnel Drives TBM Excavation Method Used for Main Tunnel Drives Drill and Blast Excavation Method Used for Shafts, Widened Enclosures and Caverns Drill and Blast Excavation Method Used for Shafts, Widened Enclosures and Caverns Widened Enclosures and Caverns do not Require Arched Ceilings Widened Enclosures and Caverns do not Require Arched Ceilings Klystron Cluster System (KCS) HLRF Klystron Cluster System (KCS) HLRF Most RF Equipment is Located in Surface Buildings at Shaft Access Most RF Equipment is Located in Surface Buildings at Shaft Access Electrical Equipment, Cooling Towers and Cryo Plants Located on the Surface at Shaft Access Electrical Equipment, Cooling Towers and Cryo Plants Located on the Surface at Shaft Access

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 5 Regional Geotechnical Conditions and Underground Construction Methods (2) European Region European Region Sample Site Adjacent to Existing CERN Laboratory Sample Site Adjacent to Existing CERN Laboratory Relatively Uniform Surface Elevation Supports Surface Buildings Relatively Uniform Surface Elevation Supports Surface Buildings Uniform Molasse Rock Strata Uniform Molasse Rock Strata Tunnel Depth m Tunnel Depth m Main Underground Access by Vertical Shaft Main Underground Access by Vertical Shaft TBM Excavation Method Used for Main Tunnel Drives TBM Excavation Method Used for Main Tunnel Drives Roadheaders or Rock-Breakers Used for Widened Enclosures and Caverns Roadheaders or Rock-Breakers Used for Widened Enclosures and Caverns Traditional Excavation Equipment and Special Ground Support Measures Used for Shaft Construction Traditional Excavation Equipment and Special Ground Support Measures Used for Shaft Construction Widened Enclosures and Caverns will Require Arched Ceilings Widened Enclosures and Caverns will Require Arched Ceilings Klystron Cluster System (KCS) HLRF Klystron Cluster System (KCS) HLRF Most RF Equipment is Located in Surface Buildings at Shaft Access Most RF Equipment is Located in Surface Buildings at Shaft Access Electrical Equipment, Cooling Towers and Cryo Plants Located on the Surface at Shaft Access Electrical Equipment, Cooling Towers and Cryo Plants Located on the Surface at Shaft Access

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 6 CFS Regional Design Composition

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 7 Main CFS Cost Drivers

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (1)

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (2) Americas Region Sample Site at FNAL European Region Sample Site at CERN European Region Sample Site at Dubna

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (3) Regional Differences Between the Main Linac Tunnel Cross Sections – Americas Region Regional Differences Between the Main Linac Tunnel Cross Sections – Americas Region Tunnel Diameter Tunnel Diameter Americas Cross Section is Smaller (5.0m vs. 5.2m) Americas Cross Section is Smaller (5.0m vs. 5.2m) Ventilation Systems Ventilation Systems Longitudinal System for the Longitudinal System for the Americas Tunnel Air Supply Ducts in Floor Slab Air Supply Ducts in Floor Slab Tunnel Used as Return Duct Tunnel Used as Return Duct Services & Cables in the Concrete Services & Cables in the ConcreteInvert Electronic Racks and Shielding Electronic Racks and Shielding Space for Waveguides Space for Waveguides

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (4) Regional Differences Between the Main Linac Tunnel Cross Sections Regional Differences Between the Main Linac Tunnel Cross Sections Tunnel Diameter Tunnel Diameter European Cross Section is Larger (5.2m and 8.0m vs. 5.0m) European Cross Section is Larger (5.2m and 8.0m vs. 5.0m) Ventilation Systems Ventilation Systems Transversal Ventilation System with Transversal Ventilation System with Longitudinal Ducts at Tunnel Crown Services & Cables in the Concrete Services & Cables in the ConcreteInvert Avoided in European Region Avoided in European Region Electronic Racks and Shielding Electronic Racks and Shielding Space for Waveguides Space for Waveguides Less Space for European Less Space for European Layout, but, as needed, Space can be made Available

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (5) Americas Region Tunnel Cross Section (Looking Downstream e- Linac) European Region Tunnel Cross Section (Looking Upstream e- Linac)

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (6) Americas Region Interaction Region European Region Interaction Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (7) Damping Ring Cross Section

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (8) Tunnel Lengths for Both Regions are the Same Based on the Same Machine Lattice Tunnel Lengths for Both Regions are the Same Based on the Same Machine Lattice The Americas Region Used the Same Diameter TBM for Main Tunnel Drives and Drill and Blast Methods to Enlarge Enclosure Areas as Needed The Americas Region Used the Same Diameter TBM for Main Tunnel Drives and Drill and Blast Methods to Enlarge Enclosure Areas as Needed The European Region Uses a Larger Diameter TBM where Technical Equipment Requires a Larger Dimensional Space The European Region Uses a Larger Diameter TBM where Technical Equipment Requires a Larger Dimensional Space All Service Tunnels for Both Regions Use a Uniform Diameter TBM All Service Tunnels for Both Regions Use a Uniform Diameter TBM

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (9) Americas Region European Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (10) Americas Region Areas of Refuge are Provided Areas of Refuge are Provided All Non-TBM Construction is All Non-TBM Construction is Considered a Cavern Fire-Protected Connections are Fire-Protected Connections are Required for Shaft Access Volumes for Sources are Mostly Volumes for Sources are Mostly Considered BDS Americas Interaction Region Americas Interaction Region has a Larger Footprint Shaft Construction Extends to Shaft Construction Extends to Tunnel Floor Level Shaft Base Caverns do not Shaft Base Caverns do not Include Shaft Volumes European Region Areas of Refuge are Not Needed Areas of Refuge are Not Needed Some Minor Tunnel Widening is Some Minor Tunnel Widening is not Considered a Cavern Protected Shaft Access is not Protected Shaft Access is notRequired Volumes for Sources are Volumes for Sources are Considered as a % of Total European Interaction Region is European Interaction Region is More Compact Shaft Construction Extends to Shaft Construction Extends to Top of Base Cavern Shaft Base Caverns does Include Shaft Base Caverns does Include Shaft continuation Volumes

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (11) Americas Region European Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (12) Americas Region European Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Civil Engineering – Americas and European Regions (13) Americas Region Surface Structure Summary and Typical Plan at Main Linac Shaft

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Electrical – Americas Region (1) Americas Region KCS Power Load Table in MW

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Electrical – Americas Region (2) Americas Region Electrical Single Line Diagram

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Electrical – Americas Region (3) Americas Region Electrical Single Line Diagram at Central Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Air Treatment – Americas Region (1) Two Separate Ducted Air Supply Systems Provide Conditioned Air to the Tunnel Enclosures Two Separate Ducted Air Supply Systems Provide Conditioned Air to the Tunnel Enclosures General Supply Air with 20% Fresh Air General Supply Air with 20% Fresh Air Emergency Supply Air to Areas of Refuge (AOR) When Needed Emergency Supply Air to Areas of Refuge (AOR) When Needed The Tunnel Enclosure Serves as the Air Return to Ducted Returns at Each ShaftThe Tunnel Enclosure Serves as the Air Return to Ducted Returns at Each Shaft Conditioned Supply Air will Maintain Tunnel Air Temperatures at 86 o F (30 o C) – Temperature Stability +/- 1 o CConditioned Supply Air will Maintain Tunnel Air Temperatures at 86 o F (30 o C) – Temperature Stability +/- 1 o C Damping Ring and BDS have Additional Fan Coil Units to Maintain Tunnel Temperature Due to Addition Heat Loading and Stricter Temperature Tolerances +/- 0.1 o CDamping Ring and BDS have Additional Fan Coil Units to Maintain Tunnel Temperature Due to Addition Heat Loading and Stricter Temperature Tolerances +/- 0.1 o C

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Air Treatment – Americas Region (2) Americas Region Typical Air Treatment Schematic

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Piped Utilities – Americas Region (1) Tunnel and Enclosure Groundwater Inflow and Condensate Drainage Estimated as 21 m 3 /h/km Tunnel and Enclosure Groundwater Inflow and Condensate Drainage Estimated as 21 m 3 /h/km Duplex Sumps Discharged Through Shafts Duplex Sumps Discharged Through Shafts 132 in Main Linac 132 in Main Linac 121 in Central Region and IR 121 in Central Region and IR 32 in Damping Ring 32 in Damping Ring Surface Holding Tanks will Provide Monitoring Capability Prior to DischargeSurface Holding Tanks will Provide Monitoring Capability Prior to Discharge Sprinkler Systems Throughout Underground Enclosures and Surface BuildingsSprinkler Systems Throughout Underground Enclosures and Surface Buildings Domestic Water and Sanitary Facilities Typically at the Base of Shafts and in Surface BuildingsDomestic Water and Sanitary Facilities Typically at the Base of Shafts and in Surface Buildings

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Process Cooling Water – Americas Region (1) Americas Region KCS Heat Load Table by Area System in MW

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Process Cooling Water – Americas Region (2) Americas Region Typical Process Cooling Water Schematic

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Process Cooling Water – Americas Region (3) Americas Region Chilled Water Schematic at Central Region

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Safety Equipment – Americas Region (1) Based on Requirements in National Fire Protection Association (NFPA) Standard for Subterranean Spaces, 2005 Edition Based on Requirements in National Fire Protection Association (NFPA) Standard for Subterranean Spaces, 2005 Edition Verified Single Main Linac Tunnel Solution Verified Single Main Linac Tunnel Solution Supported by Two Studies Conducted by Hughes Associates, Inc. Supported by Two Studies Conducted by Hughes Associates, Inc. Code Analysis and Recommendations Code Analysis and Recommendations Single Tunnel Analysis Using Fire Dynamics Simulator (FDS) which is a Computational Fluid Dynamics Program Developed by the USA National Institute of Standards Single Tunnel Analysis Using Fire Dynamics Simulator (FDS) which is a Computational Fluid Dynamics Program Developed by the USA National Institute of Standards Personnel EgressPersonnel Egress Hazardous Equipment and Shaft Elevators Protected by 2 hr. Fire Rated Walls and Doors Hazardous Equipment and Shaft Elevators Protected by 2 hr. Fire Rated Walls and Doors Main Linac Tunnel Serves as Escape Route Main Linac Tunnel Serves as Escape Route Emergency Lighting, Illuminated Exit Signage and Directional Signs Emergency Lighting, Illuminated Exit Signage and Directional Signs Automatic Sprinkler ProtectionAutomatic Sprinkler Protection Addressable Fire Detection SystemAddressable Fire Detection System

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Safety Equipment – Americas Region (2) Plan Views at Shaft Base Caverns and Areas of Refuge

Global Design Effort - CFS 13 December 2012 PAC Review - KEK Safety Equipment – European Region (3) Based on European, French and Swiss Safety Requirements Based on European, French and Swiss Safety Requirements Single Main Linac Tunnel Solution Single Main Linac Tunnel Solution Avoiding Refuge Areas (Alcoves) Offering No Protected Exitway Avoiding Refuge Areas (Alcoves) Offering No Protected Exitway Transversal Ventilation System Transversal Ventilation System Tunnel Divided in Compartments Separated by Fire Doors and Fire Walls Every ~ 500m Tunnel Divided in Compartments Separated by Fire Doors and Fire Walls Every ~ 500m Negative Pressure Created in Compartment Affected by Fire, Positive Pressure in Adjacent Compartments Negative Pressure Created in Compartment Affected by Fire, Positive Pressure in Adjacent Compartments Prevention of Smoke Propagation from One Compartment to the Next Prevention of Smoke Propagation from One Compartment to the Next Emergency Lighting, Illuminated Exit Signage and Directional Signs Emergency Lighting, Illuminated Exit Signage and Directional Signs Extensive Fire Safety Study Conducted for CLIC, Applicable for ILC Extensive Fire Safety Study Conducted for CLIC, Applicable for ILC

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 33 Construction Schedule – Americas and European Regions e- BDS (3.33km) e+ BDS (2.25km) Courtesy M Gastal

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 34 Summary Regional Conditions have had a Large Impact on the ILC Conventional Facilities Design Regional Conditions have had a Large Impact on the ILC Conventional Facilities Design In Both the Americas and European Regions Civil Design was Primarily Completed by In-House CFS Personnel Supported by Outside A/E Consultants In Both the Americas and European Regions Civil Design was Primarily Completed by In-House CFS Personnel Supported by Outside A/E Consultants In the Americas Region a Complete Mechanical and Electrical Design was Completed by Outside A/E Consultants Supported by CFS In-House Personnel In the Americas Region a Complete Mechanical and Electrical Design was Completed by Outside A/E Consultants Supported by CFS In-House Personnel Compared to the RDR the Overall Design Maturity has Greatly Improved in All Regions Compared to the RDR the Overall Design Maturity has Greatly Improved in All Regions