KCDC Knox County Development Corporation www.kcdc.com 812.886.6993 Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.

Slides:



Advertisements
Similar presentations
Installation Law Briefing
Advertisements

Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
ALUR Wall System.
ONE STOP Real Estate Services G ill G roup
Framing.
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Construction Explanation.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Doors Wood Framed Doors.
Engineering Graphics & Design Civil content
FVCC Fire Rescue Forcible Entry.
Built Rite Industries Los angeles, CA & Savannah, GA Office Kit Presentation ©. Copyright of Built Rite Industries, LLC.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Module Reading Plans and Elevations
Ceilings are described as being either:
Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Objectives of Elemental Estimation 1.To reveal the distribution of costs among the constituent element of the project. 2.To relate the cost of any constituent.
Summary of NFPA 101 Interior Finish Requirements
An-Najah National University Faculty of Engineering
Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Floor Systems and Foundation Support
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Constructing Homes and Other Buildings
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Chapter 22 Selecting Interior Finishes
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Balloon Frame North-American invention, 1833
Building Simulation. BMEABMEA uilding odeling nergy nalysis.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
The OHIO SCHOOL FACILITIES COMMISSIONAssessor & RPC Summit; July 1, 2008.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Estimating and Scheduling CEE 492
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
CONSTRUCTION Housing
Leads Institute of Technology & Engineering
Rosemead.
Children’s Section of the Library Entrance lobby from Main Street looking east.
Major Steps In Building a SFR
How Completed Interiors Are Achieved: Designing & Building
Multistory Office Building
Chapter 10 Construction Basics.
Presented By YOUR NAME, CHI, PHI A-Pro Home Inspection Services
6.02 Recognize components of construction
ActivRAC® Layout Considerations
How & When to Get Permits for Work in Your Home
R Single-Family Home Repair Exemption
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
House Construction Budget Plan
Presentation transcript:

KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building

Design Specifications Building Code: Current Indiana Requirements Wind Load : 85 mph Seismic Zone : 2 Building Specifications: Manufacturing Area Framing: Gable, Interior Columns Width: 200 Length: 250 Eave: 28 Roof Cover: 24 ga. Standing Seam Roof Wall Cover: 26 ga. Exterior Wall Panel w/ Kynar 500 Finish Trim: Alum. Gutters and Downspouts Insulation: 6 Fiberglass Batt –Roof, 4 Fiberglass Batt –Walls Accessories: 2 Loading Docks, w/ Overhead Doors,Manual, Insulated

Design Specifications Office Area Framing: Single Slope Width: 72 Length: 60 Eave: 16 Roof Cover: Standing Seam Metal Wall Cover: Glass Curtain Wall/ Metal Panels

Project Specifications And Proposal Scope EXTERIOR Site work Erosion Control Clear and Grub Strip and Stockpile Topsoil Cuts and Fills to Sub-Grade Building Excavation and Backfill 8 Stone Fill Under Floor Slab Strom Drainage Footing Drain w/ Roof Drains Tied In Site Drainage Water Lines to 5 Outside Building 2 Domestic Water Line 6 Sprinkler Line Excavation and Backfill for Electric, Phone, Cable, etc. Paving Re-spread Topsoil and Seed

Exterior Cont. Roofing Insulation and Ceilings New Gutters and Downspouts 4 Wall Insulation, 6 Ceiling Insulation Interior Walls Separating Manufacturing Area From Office Area Foundation Perimeter Insulated With 2 Rigid Insulation Area Above Ceilings to be Insulated with 6 Batt Acoustical Ceilings in Office Areas 2x4 Standard Lay-in Tiles and Grid Ceilings in Pre-Engineered Building to be Exposed 24ga. Standing Seam Roof, 20yr. Warranty Exterior Doors Qty.(4) 3070 Steel Insulated w/ Locksets Qty. (2) Overhead Doors, 8x8, Manual Insulated Steel

Interior Concrete Furnish and Install all Required Concrete Work 6 Thick, 4,000psi, Wire Reinforced Slab in Manufacturing Area,4 in Office Area Equipment Pads as Negotiated Flooring Sealed Concrete in Manufacturing Area, Vinyl Floor and Carpet in Office Area Painting Painted, Gypsum Board Interior Partitions in Office Area Interior of Manufacturing Area to be Painted and Exposed Plumbing/ HVAC ADA Approved Fixtures Water Heater, Mop Sink,Hose Bibbs HVAC –25 Tons Office Area Ductwork,Economizer,Fresh Air Exhaust 1 Exhaust Fan in Each Restroom All Gas Piping Unit Heaters in Manufacturing Area

Electrical New Underground 3-Phase Service, Size to be Determined Lighting: 400w Metal Halide in Manufacturing Area, 2 x 4 Recessed Florescent Fixtures in Office Area Exit and Emergency Lights Switches and Receptacles Per Code Wiring to HVAC Equipment Electric Service for Specific Equipment Not Included Offices Interior Partitions Exterior Walls to Have 8 Liner Panel on Interior, Gyp. Board. In Office Area Interior Partitions to Be 3 5/8 Steel Studs w/ Fire Rated Gyp. Board Wall Separating Office From Manufacturing to Be Two Hour Fire Rated Interior Doors To be Flush Wood,Knock Down Frames, Includes All Hardware

Project Costs Building: $ 1,826,000 Site Improvements: $ 150,000 Land Costs: 10ac $ 100,000 TOTAL: $ 2,076,000

Completion Time Construction plans can be completed within 30 days,upon final approval of design Permits, approvals - 30 days Construction can be complete in days, weather dependent