New Public Transport Infrastructure

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
CityCo, Piccadilly Hoteliers Forum
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
9/7/2012 MBS UU.
Luas Cross City Main Infrastructure Works April 2015.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
1 Nottingham-Lincoln Stakeholder Board – Network Rail update Doreen Marsh – 26 th February 2015.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
High Speed 2 The decision and next steps Jonathan Mitchell.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
TRACECA PROJECT EVALUATION
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Transport Update Chris Carter Transport Strategy Manager.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
September 2015 DART Expansion Programme & DART Underground Project.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
Draft Transport Strategy
Update to Dublin Chamber of Commerce Network Direct Paddy Doherty Thursday 18 th November 2010.
Core Strategy Dublin City Development Plan
Salford Core Strategy Eccles Political Executive Briefing 14 November 2008.
Airport DART Link The Council’s View Sean McGrath Senior Executive Engineer Fingal County Council.
Crossrail 2 London Assembly Regeneration Committee.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
UK Working Group: Territorial Cohesion. Territorial Description: London.
Greater Nottingham Aligned Core Strategies Option for Consultation (15 th February until 12 th April 2010) Karen Shaw Nottingham City Council.
SEStran Regional Model Midlothian Local Development Plan Transport Appraisal Final Summary Report.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Proposed Route Modifications
TfN Freight AND RAIL UPDATE
ARCH – 4601 Feasibility Study Presentation
SMART URBAN FUTURES PRESENTATION
Potomac Yard Metrorail Station
A Position Statement 14th October 2016
NGTA Halton Planning and Public Works Committee
Cycling infrastructure spending 2017
Western Orbital Local Liaison Forum 11TH September 2017.
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
Manchester Airport -sustainable development plan – Surface access
Fishermans Bend Draft Framework Transport Recommendations
SMART URBAN FUTURES PRESENTATION
KEYNOTE STAGE SPONSOR.
Update on Accessibility and Transport
Capital Programming Committee South Coast Rail Phase 1 Service
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Delivering East West Rail
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Derek Mitchell, Simon Harris, Alice O'Donnell, Grainne McLoughlin.l
Official Plan and Zoning By-law Amendment Application
Shropshire Local Plan Review Consultation on Preferred Sites
KEYNOTE STAGE SPONSOR.
Harbour Island Force Main Replacement
East Sussex Strategic Partnership Transport Update 20 March 2019
Innovation in Railways NTA Ireland
Presentation To Cherrywood Inquiry (Luas B1)
Delivering the North East Chelmsford Growth Ambition
Western Orbital: M11 J11 Park and Ride Provision
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Histon Road LLF Resolutions and Programme
Presentation transcript:

New Public Transport Infrastructure October 2018

National Development Plan 2018 – 2017 Key Public Transport Projects Metrolink DART Expansion BusConnects

LUAS & Metro

MetroLink Project MetroLink

MetroLink comprises the previous scheme known as Metro North, running between Swords and St. Stephen’s Green, and what has been referred to as Metro South, extending from St. Stephen’s Green to Sandyford Delivers a full north-south high capacity spine from Swords to Sandyford by 2027

M50 to Swords 3,000 space park and ride site proposed at north end of the scheme Metro remains in bored tunnel until just south of Swords Route remains on the R132 Swords Bypass but as an elevated metro running above the median

City Centre to M50 Section Optimum route is via Phibsborough with a station at Cross Guns Bridge - integrates better with the DART proposals and provides a very good interchange facility Metro is in bored tunnel all through this area

City Centre Section Key Points Avoids duplicating line of Luas Cross City Doesn’t terminate at St. Stephen’s Green – connects to Green Line at Charlemont Links to DART system at Tara Station Core city centre stations are at St Stephen’s Green East, Tara Street and O’Connell Street Avoids major interference with St. Stephen’s Green

Changes from the original Metro North Connects to the Green Line from day 1 Connects to the DART at Tara Street and Glasnevin providing an integrated rail system Doesn’t duplicate the Luas Cross City line Avoids the major interference with St. Stephen’s Green station under the roadway on St. Stephen’s Green East Removes the complex station previously planned for O’Connell Bridge, which had major construction impacts St. Stephen’s Green East Station. Pink is station box. Hatched area is area for construction but can be reduced on park side. (Tunnel not shown but runs north-south through the pink box.

Changes from the original Metro North Routes through Phibsborough rather than Drumcondra due to the better interchange with the heavy rail system at Glasnevin Stn Severs the Green Line at Charlemont, with southbound Luas services from Broombridge terminating at Charlemont, but with an easy interchange to Metro The line south of Sandyford is likely to operate as a separate Luas line, but the final decision on this will be taken at a later stage

Why are we Upgrading the Green Line to Metro? Existing system will be unable to cater for the future level of passenger demand on this corridor. In future years passenger growth along this line will increase significantly due to: The build-out of Cherrywood - a town of 18,000 population and 12,000 jobs The increase in Sandyford with much larger numbers of jobs and residents Transport modelling indicates that over the next two decades, passenger levels on the Green Line will reach approximately 11,000 passengers in the northbound direction, reaching 13,000 passengers by 2057. The maximum capacity of Luas (all 55 trams) is about 8,000 passengers per hour

Public Consultation Public Reaction to MetroLink Justifiable concerns regarding property and land impacts Justifiable concerns relation to construction and operational impacts Some concerns regarding particular station locations and tunnel launch sites Visual impacts in certain areas Upgrade of the Greenline People are generally supportive of MetroLink

Issues being considered Connection to the Green Line Impact of tie-in on Green line Mitigation of impact on property Mitigation of visual impact on Swords Bypass Twin or Single bore tunnel

Twin Tunnels or Larger Single Tunnel

Next Steps Amend Emerging Preferred Route and carry out second consultation in November Preferred Route to Preliminary Design Stage Develop Statutory documents (Environmental Impact Assessment Report) for Railway Order Application Q4 2019 Develop procurement strategy for construction and operations stages Updates available on www.metrolink.ie

Rail Integration

New rail interchange points at: Charlemont Tara Street Glasnevin O’Connell Street

Greater Dublin Area Public Transport Network