West Campus Parking Deck & Roadway Update
Project Info 2006 West Campus Precinct Plan Master Plan Gate 1: Programming
Project Info 2007 University Park Master Plan Update Master Plan Gate 1: Programming
Project Info 2007 West End Plan – Borough of State College Master Plan Gate 1: Programming
Project Info 2013 Downtown Master Plan – Borough of State College Gate 1: Programming
Scope 2017/2018 West Campus Parking & Roadway Feasibility Study Study completed to assess the feasibility of new deck and roadway construction (Tim Haas, McCormick Taylor, NTM Engineering) Evaluated siting and access to deck Developed program for number of spaces with replacement of surface lots for future academic buildings and increased demand Included evaluation of stormwater accommodations for both this scope and future build-out of West Campus Municipal and Agency Coordination Meeting included staff from Borough, Ferguson Township, CATA, CRPA, and PennDOT
Scope Program: West Campus Parking Structure & Roadway Connections Located in Red A parking on West Campus Approx. 1,676 parking spaces (6 Tier) Covered bike storage on ground level CATA Bus Stop at Parking Structure Extension of White Course Drive New roadway connection from West College Avenue to provide access from West 2 Ingress/Egress locations for road connection from West College Ave and Atherton St Transit-only link considerations for roadway design
Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming Potential Sites Ferguson Township State College Borough
Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming
Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming Ferguson Township State College Borough
Considerations West Campus Parking Structure & Roadway Connections Parking Structure needs to be operational before work can start on new buildings that impact parking on West Campus Traffic Impact Study initiated in Spring to collect traffic data and while school is in session and prior to road work on Atherton Street Stormwater Basin expansion to accommodate both initial and future growth in West Campus Drainage Area Design/Build team to be selected in July to start design in early fall Final siting and access considerations to be influenced by on-going College of Engineering Master Plan
Project Info West Campus Parking Structure & Roadway Connections Proposed Concept – Stormwater Basin