West Campus Parking Deck & Roadway Update

Slides:



Advertisements
Similar presentations
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Advertisements

1 University of Houston Central Campus Parking Study Overview November 2003 WALKER PARKING CONSULTANTS.
Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
AGENDA – PUBLIC FORUM October 12, Welcome and Background – Rod Lehnertz 2.Site Evaluation Progress Report – Joe Hibbard 3.Public Discussion 4.Closing.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Citylink A Partnership Between The Coeur d’Alene Tribe, The State Of Idaho, The KMPO, and Kootenai County.
ASU Downtown Phoenix Campus City Council February 6, 2007.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Hollymount School Public Consultation Tom Procter Service Manager – Contracts and School Organisation.
Wherever Your Path May Lead …. RTS Takes You There!
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f RPA Masterplanning.
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
City of Appleton Stormwater Management Update Presented to the June 11, 2013 Utilities Committee.
Wherever Your Path May Lead …. RTS Takes You There!
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Prepared by: Alex Fisch Planning Services Division.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Ardmore Station Presented to Lower Merion Commissioners by Carl Dranoff March 11, 2009.
Smyrna’s Major Thoroughfare, Bicycle, and Pedestrian Plan TOWN COUNCIL RETREAT APRIL 14, 2015.
Charlottesville Area Transit Proposed 2012 Route Adjustments.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Transportation Master Plan Update Warden’s Forum May 7, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Arizona Forward Update
Presented by Kelsey Lang, Planning Associate June 27, 2016
City of Charlottesville
2016 Mill and Overlay Project
Town of Brighton, Department of Public Works
Welcome to the Libertyville Stormwater Master Plan Open House
Jefferson County SA Red Rocks Site Approval
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Scoping Meeting April 20th 6:00 pm
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Charlotte Douglas International Airport
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Col. Pike Multimodal: About the Project
Center City Connector 101.
City of Appleton Stormwater Management Update Presented to the
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Development Charge Public Meeting October 23, 2017
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
US-223 Connector PUBLIC MEETING
Concept Plan for Proposed Park Near Hopewell School
STREETS & STORMWATER DEPARTMENT
Civic Center Sports Field Study Session & Quarterly Update
D Line TAC Meeting #1: D Line Rapid Bus Project Planning City of Richfield Transportation Commission July 12, 2017 Katie Roth, Project Manager.
A r d m o r e T r a n s i t C e n t e r
Motor Row Streetscapes
Southwest LRT METRO Green Line Extension
Application for Zoning Amendment
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
Meadow Lake Boulevard Street Extension Project
Relevant UF Advisory Committees
M14A/D Select Bus Service
Genesys Health System Campus & Community Revitalization
Transportation Management Plan Modernization Project
Licton Springs P-Patch Food for Thought
2020 RTP Update - Proposed Changes to Transit Projects
Colorado Avenue University of Colorado, boulder
Western Orbital: M11 J11 Park and Ride Provision
Interlocal Cooperative Agreement FY 20
Downtown Parking Update Parking Advisory Committee
Presentation transcript:

West Campus Parking Deck & Roadway Update

Project Info 2006 West Campus Precinct Plan Master Plan Gate 1: Programming

Project Info 2007 University Park Master Plan Update Master Plan Gate 1: Programming

Project Info 2007 West End Plan – Borough of State College Master Plan Gate 1: Programming

Project Info 2013 Downtown Master Plan – Borough of State College Gate 1: Programming

Scope 2017/2018 West Campus Parking & Roadway Feasibility Study Study completed to assess the feasibility of new deck and roadway construction (Tim Haas, McCormick Taylor, NTM Engineering) Evaluated siting and access to deck Developed program for number of spaces with replacement of surface lots for future academic buildings and increased demand Included evaluation of stormwater accommodations for both this scope and future build-out of West Campus Municipal and Agency Coordination Meeting included staff from Borough, Ferguson Township, CATA, CRPA, and PennDOT

Scope Program: West Campus Parking Structure & Roadway Connections Located in Red A parking on West Campus Approx. 1,676 parking spaces (6 Tier) Covered bike storage on ground level CATA Bus Stop at Parking Structure Extension of White Course Drive New roadway connection from West College Avenue to provide access from West 2 Ingress/Egress locations for road connection from West College Ave and Atherton St Transit-only link considerations for roadway design

Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming Potential Sites Ferguson Township State College Borough

Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming

Project Info West Campus Parking Structure & Roadway Connections Gate 1: Programming Ferguson Township State College Borough

Considerations West Campus Parking Structure & Roadway Connections Parking Structure needs to be operational before work can start on new buildings that impact parking on West Campus Traffic Impact Study initiated in Spring to collect traffic data and while school is in session and prior to road work on Atherton Street Stormwater Basin expansion to accommodate both initial and future growth in West Campus Drainage Area Design/Build team to be selected in July to start design in early fall Final siting and access considerations to be influenced by on-going College of Engineering Master Plan

Project Info West Campus Parking Structure & Roadway Connections Proposed Concept – Stormwater Basin