Chemical Monitoring Activity (CMA)

Slides:



Advertisements
Similar presentations
Water.europa.eu Agenda item 7d Report on the quality assessment of the monitoring database Strategic Co-ordination Group November 2010 Madalina.
Advertisements

JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
CMA-3 Support to Standardisation 8 th CMA Plenary Meeting in conjunction with NORMAN and EAQC-WISE final meetings Paris, France, 21 st October 08 Ulrich.
CMA-3 Support to Standardisation 7 th CMA Plenary Meeting Palais Beaumont, Pau, France, 14 th May 08 Ulrich Borchers, Peter Lepom, Bernd Gawlik.
Water.europa.eu CMEP progress CMEP progress Mario Carere, Bernd Gawlik, Madalina David Mario Carere, Bernd Gawlik, Madalina David WG E
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
Water.europa.eu Draft mandate WGE Chemical Status WG E Priority Substances 8-9 October 2009 Jorge Rodriguez Romero Madalina David DG Environment, European.
CIS Work Programme WFD Team, DG ENV.D.2, European Commission.
New Work Programme and mandates 2005/2006
STRATEGIC CO-ORDINATION GROUP Water scarcity Expert group
SW/MW guidance Milestones
SW/MW guidance A surface/marine part which will focus on specific monitoring features related to surface waters and marine/coastal waters along the lines.
Chemical Monitoring mandate
Proposed CIS Workshop on WFD Economic Issues
Berlin 2 May CMA 6° Plenary Meeting
Bruxelles 17 october-2007 WG E Meeting
Identification of standardisation needs in the light of the SW/MW Guidance development - 3rd CMA meeting - 23 March 2006, Brussels Ulrich Borchers,
on Priority Substances Strategic Coordination Group
JRC-Institute for Environment and Sustainability
Paris (France), 22 September 2008
European Commission DG ENV Unit C1 Water
Water Directors’ Meeting Common Implementation Strategy
Philippe QUEVAUVILLER
Standardisation - What to expect from it?
Chemical Monitoring Activity 9° Plenary Meeting Ghent
Meeting of Water Directors WFD Common Implementation Strategy
Change and adapt the Eionet water data flow to meet WFD requirements
Chemical Monitoring Activity (CMA) ( )
Philippe Quevauviller
Scientific Support to Policies
Chemical Monitoring Activity (CMA) ( )
CMA Plenary Meeting 21/10/2008 PARIS
Strategic Coordination Group 4-5 November 2009
Progress SOE –drafting group
Priority substances Water Directors meeting Paris November 2008
Draft Mandate and Proposed Approach for the Drafting Group on
SW/MW guidance A surface/marine part which will focus on specific monitoring features related to surface waters and marine/coastal waters along the lines.
New mandates for Working Groups A, C and D including GIS
Meeting of Water Directors Future Work Programme of the CIS
Project 2.7 Guidance on Monitoring
The Common Implementation Strategy – an overview
Water Framework Directive 2000/60/EC
WG C Groundwater Mandate and activities
EU Water Framework Directive
Work Programme of the CIS
Harmonisation and standardisation – Status and way forward
Plenary Session 21° October Paris
ECOSTAT 2013 – 2015 Tasks and Deliverables
Part I.
PRIORITY (HAZARDOUS) SUBSTANCES
Brussels 7 November 2007 SCG Meeting
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Organisation Water Directors Strategic Co-ordination Group
Water Science-Policy Interface (CIS-SPI) Progress report
WG C-1 activity Berlin – 3 May 2007
NORMAN Contract FP6 - Priority 6.3
Philippe QUEVAUVILLER
Strategic Co-ordination Group May 2009
Concept paper on the assessment of WFD River Basin Management Plans
Working Group C & CMA ( ) Tasks / Deliverables
WG A ECOSTAT Draft Mandate
Scientific Support to Policies
The ATM Standardisation Coordination Group
Brussels – 20 April 2007 European Commission - DG Environment
EU Water Framework Directive
Strategic Coordination Group Brussels, 5-6 November 2008
CMA-1 activity Berlin – 2 May 2007
Presentation transcript:

Chemical Monitoring Activity (CMA) 2007-2009 Philippe Quevauviller Mario Carere Chemical Monitoring Activity (CMA) 2007-2009

Chemical Monitoring Activity (CMA) (2007-2009) Objectives & justification Need for continuous exchanges on chemical monitoring issues, in the light of the on-going technical progress, and follow-up of the monitoring programmes Specific inputs required about standardisation in support of chemical monitoring (links to CEN/TC 230) Practical works (with PRBs) on chemical monitoring Follow-up of QA_QC discussions in relation to the development of EAQC-WISE

CMA (2007-2009) Tasks / Deliverables STRATEGIC CO-ORDINATION GROUP WG E PLENARY CMA (GW, SW/MW) WG C or WG E (joint meetings) CMA-1 Exchange of best practices CMA-2 QA_QC CMA-3 Standardisation (CEN TC/230) Sharing best practices Identification of gaps and needs Analytical methods, sampling Practical exercises Sediment and biota Follow-up of COM decision Discussion of common strategy (EAQC-WISE) Identification of standards Follow-up of CEN work Links with RTD

CMA (2007-2009) Chemical Monitoring in the CIS Activity CMA-1 (Monitoring best practices) Objectives To coordinate exchanges on best practices and establish recommendations needed by Member States in the context of the implementation of the WFD monitoring programmes. This activity will be developed in close connection with the Working Group E on Priority Substances. The activity will cover, in particular: The finalisation of the "Surface/Marine Water Chemical Monitoring" guidance initiated in 2006, which needs to integrate elements arising from the proposal for a new Directive on Priority Substances; Exchanges on Best Practices/experiences on monitoring programme design (grouping of bodies, number of monitoring stations, monitoring frequency), sampling (and related uncertainty) selection of parameters, calculation methods of background concentrations, new emerging tools for monitoring and update information on available analytical methods (covering both surface and ground water) through case studies and organisation of field trials aiming to test methods; Recommendations on sediment and biota monitoring in the light of requirements of Article 16 of the WFD (focus on priority substances).

CMA (2007-2009) Chemical Monitoring in the CIS Activity CMA-2 (Quality assurance and control) Objectives To develop a common strategy for quality assurance and control for chemical monitoring data covering both priority substances in surface/marine waters and pollutants monitored in groundwater. The activity will cover, in particular: The finalisation of the "QA_QC Commission Decision" initiated in 2006, which is aimed to be adopted by comitology (legal basis: Article 8.3 WFD); Development of a common strategy for quality assurance and control in close connection with the EAQC-WISE project (European Analytical Quality Control in support of WISE: SSP project), aiming to identify common requirements and establish a European network in support of routine monitoring laboratories.

CMA (2007-2009) Chemical Monitoring in the CIS Activity CMA-3 (Standardisation) Objectives To evaluate standardisation needs and take appropriate actions. The CMA expert group will act as a discussion group to identify possible standardisation needs linked to chemical monitoring (and possible research needs linked to standardisation) and to establish recommendations to be further considered by the WFD Committee and CEN. The activity will cover, in particular: Discussion on standardisation needs related to WFD chemical monitoring and evaluation of expressed needs (this should concern the analysis of physico-chemical parameters and chemical substances monitored under the WFD in (surface/marine and ground) water, sediment and biota; Establishment of list(s) of existing standards and/or standards that should be developed for communication to both the CIS Strategic Coordination Group and the Working Group 1 of CEN/TC-230 and for decision on further action; On the basis of the above, proposal of existing standards to the WFD Committee for adoption by comitology and/or development of new standards (possibly involving pre- or co-normative research) mandated to CEN, followed by adoption by comitology;.

Agreed stepwise procedure Step 1: Identification and proposal of the WFD relevant standards by CIS groups and CEN Step 2: Present the proposal to the CIS Strategic Co-ordination Group (SCG) Step 3: Endorsement at the WFD Committee to be included in Work Programme Step 4: DG Environment request to CEN (mandate) Information exchange with CIS groups Step 5: CEN develops the standard Step 6: Commission Decision adapting Section 1.3.6 of Annex V through comitology

Going further: Links with research Step 1: Identification of needs (standards & research-related)=CIS Step 2: Proposal to CIS Strategic Co-ordination Group (SCG) Step 3: Endorsement at the WFD Committee to be included in Work Programme Step 3a: Undertaking research (FP7, COST, EUREKA, JRC) Step 4: DG Environment request to CEN (mandate) CIS – WFD; CEN-STAR, SABE ? 6 months DG ENTR ? Information exchange with CIS groups Step 5: CEN develops the standard 12-18 months Step 6: Commission Decision adapting Section 1.3.6 of Annex V through comitology