API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
TIA Engineering Manual 6 th Edition Preview and Overview.
API 16 AR Specification for Drill-through Equipment Remanufacturing
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
API TG for 6A718 Inclusion of Additional Alloy 718 Strength Classes Rashmi Bhavsar 27 June 2013 Washington, DC.
Subcommittee On Pressure Relief Systems API CRE Update Clark Shepard Spring 2010.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
NAAQS Altitude Effects Ozone Transport Commission Annual Meeting June 11, 2014 Baltimore, MD Will Ollison 1220 L Street, NW Washington, DC
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
Zoning Ordinance Update 15 MAY Purpose and Intent Update Comprehensive Plan ( ) Update Zoning Ordinance (2012) Implementation and Adjustment.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Doc.: IEEE /XXXr0 Submission March, 2004 Matthew Sherman, BAE Systems Slide 1 Motions Internal for LMSC 1 st Vice Chair (And supporting slides)
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Accredited Standards Committee C63® - EMC
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
802.11F Meeting Report March 2001 Month 1998 doc.: IEEE /xxx
Status Update on API 16Q / 16R / 16F
API 16A June 2017 Specification for Drill-through Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
ISO TC64/SC4/WG2 May 2011 status
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
Subtracting Real Numbers
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
2016 Exploration & Production Summer Standards Conference
Specification on float equipment
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 16 AR Specification for Drill-through Equipment Remanufacturing
IEEE Revision Timeline
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API RP 59 Well Control Operations Chair – Tom Proehl
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems Chairman – Alex Sas-Jaworsky PE Vice-Chairman – Steve Deshotels Secretary – Jessica Lin

History First Edition – March 2009 Reaffirmed December 2014 Second Edition – TG Work Continues 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Current Activities “Success Path” Evaluation of CT Well Control Barriers Completed Recommended Changes in CT Unit Accumulator Configuration Adopted (Compliance with API Spec 16D) Scheduled WebEx Meetings Focused on Revising Section Text by 4th Qtr. 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Current Activities Continuing Work With STD 53 and TG-1 to Maintain Consistency Where Well Control Concerns are Common Between Equipment and Applications Projecting Completion of RP Section Rewrites in 1st Qtr 2018 Projecting Submission of 1st Letter Ballot in 2nd Qtr 2018 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org