P802.16Rev4 to Sponsor Ballot: Conditional Approval Request

Slides:



Advertisements
Similar presentations
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
Advertisements

Doc.: IEEE Submission March 2015 Motions and Supporting Material for EC Meeting Agenda Items Friday, March 13, 2015 Estrel.
Submission doc.: IEEE IEEE q - Conditional Approval to Start Sponsor Ballot Slide 1Bob Heile, Wi-SUN Alliance June 2015.
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
802.11e Portland Report July 16, 2004 July 16, 2004
IEEE P Motions at the July Plenary EC Meeting
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
doc.: IEEE <doc#>
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
<month year> doc.: IEEE ptc November 2013
d 100G to Sponsor Ballot (unconditional)
July s Spectrum Resource Measurement to Sponsor Ballot (conditional) Bob Heile, Wi-SUN Alliance.
P802.11z conditional approval report to ExCom
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
Working Group March Plenary EC Closing Motions Package
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f RevCom request support package.
p Approval to Start Sponsor Ballot
Motions and Supporting Material for EC Meeting Agenda Items
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
Steve Shellhammer Chair
Motions and Supporting Material for EC Meeting Agenda Items
IEEE Motions at the November Plenary EC Meeting
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
IEEE Motions in July Plenary DCN:
February 19 doc.: IEEE /424r1 May 2006
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
October Supporting Material and Motions for the EC Telecon October 2, 2018 Bob Heile, Chair Bob Heile, Wi-SUN Alliance.
Month Year IEEE Motions in July Plenary DCN:
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the July EC Closing Meeting
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the February EC Telecon
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2010
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
Overview of WG Letter Ballot Process
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Motion – P Rev/D2 to Sponsor Ballot
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
November 11, 2010 Dallas, Tx Session #70
Sheung Li Task Group J Chairperson March 19, 2004
March Supporting Material and Motions for the Closing EC Meeting March 9, 2018 Hyatt Regency O’Hare Bob Heile, Wi-SUN Alliance.
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
P802.11j Sponsor Ballot Procedure 10
July 15, 2010 San Diego, USA Session #68
Recording Secretary, IEEE 802 LMSC
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution.
IEEE P SC-Maintenance Closing Report
Presentation transcript:

P802.16Rev4 to Sponsor Ballot: Conditional Approval Request IEEE 802.16-17-0034-01-Gdoc P802.16Rev4 to Sponsor Ballot: Conditional Approval Request 13 July 2017

General Conditions: OM (v20) Clause 11 Conditional approval is only appropriate when ballot resolution efforts have been substantially completed and the approval ratio is sufficient. “Substantially complete" is when there is a very low likelihood of receiving valid new Disapprove comment(s)/vote(s) upon the next recirculation ballot.

Rules: OM (v20) Clause 11 motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and WG responses. • Schedule for recirculation ballot and resolution meeting.

Approved PAR and CSD Approved PAR (2017-02-17): https://development.standards.ieee.org/P948800033/par Title: Standard for Air Interface for Broadband Wireless Access Systems – Amendment: Fixed and Mobile Wireless Access in Channel Bandwidth up to 1.25 MHz No CSD: revision without new functionality

Date the ballot closed Open Close WG Letter Ballot #41 2017-03-17 2017-04-16 Recirc #41a 2017-06-26 2017-07-06

Vote tally including Approve, Disapprove and Abstain votes Return ratio requirement met (87.5%)

Comments that support the remaining disapprove votes and WG responses Comment resolution 6 comments in Recirc #41a all from Approve voters Addressed all comments Draft revision D3 to follow

Schedule 2017-07-21 Initiate WG recirc #41b 2017-07-31 Close WG recirc #41b 2017-08-02 resolution committee telecon if necessary 2017-08-04 Initiate Sponsor Ballot 2017-09-03 Close Sponsor Ballot

802.16 WG Motion 802.16 WG: 2017-07-13 Move to: To conditionally forward P802.16Rev4 for Sponsor Ballot Approved 5-0-0