Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE P SC-Maintenance Closing Report

Similar presentations


Presentation on theme: "IEEE P SC-Maintenance Closing Report"— Presentation transcript:

1 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Bob Heile Chair, IEEE Bob Heile, Decawave

2 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Had one meeting on Tuesday AM1 REVIEW PROPOSED CHANGES TO OM AND VOTED TO APPROVE THE CHANGES BELOW: Clause : deleted “For an WG letter ballot to be considered valid the abstention rate shall be less than 30%”. Clause 10.3: added following text “that is substantially similar to the ballotable draft”.   Clause : deleted Note 2: “a voter should not vote abstain for more than one (1) of the last three (3) mandatory WG letter ballots”     Bob Heile, Decawave

3 IEEE P802.15 SC-Maintenance Closing Report
July 2019 IEEE P SC-Maintenance Closing Report Motion Approve changes on previous slide to OM Revision 23 Mover: Second: Bob Heile, Decawave


Download ppt "IEEE P SC-Maintenance Closing Report"

Similar presentations


Ads by Google