Combiner functionalities

Slides:



Advertisements
Similar presentations
Georgia Tech Digital Back-end µHRG interface Curtis Mayberry School of Electrical and Computer Engineering Georgia Institute of Technology January 13 th,
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Oscilloscope Watch Teardown. Agenda History and General overview Hardware design: – Block diagram and general overview – Choice of the microcontroller.
8xADC AMC board Tomasz Klonowski Warsaw University of Technology PERG – ISE
ESODAC Study for a new ESO Detector Array Controller.
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Capstone Fall 2005 GFX-One Guitar Processor Team Carpal Tunnel October 6 th 2005.
Aztec PC Oscilloscope Michael Mason Jed Brown Josh Price Andrew Youngs.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
The 6713 DSP Starter Kit (DSK) is a low-cost platform which lets customers evaluate and develop applications for the Texas Instruments C67X DSP family.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Power Supply Controller Architecture
APS BPM and power supply applications on micro-IOCs W. Eric Norum
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
ECE 477 DESIGN REVIEW TEAM 2  FALL 2011 Members: Bo Yuan, Yimin Xiao, Yang Yang, Jintao Zhang.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
ATtiny23131 A SEMINAR ON AVR MICROCONTROLLER ATtiny2313.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Fast Fault Finder A Machine Protection Component.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis of the Input Monitor in the BLEDP.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
BLECS-Combiner Presentation Context Functionalities BP and alarms table Memory contents State Some questions Next steps 1.
SKIROC status Calice meeting – Kobe – 10/05/2007.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
THE MOST SUCCESSFUL C2000 MCU
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Team Epimetheus Wireless Robot Module
The Data Handling Hybrid
Beam Wire Scanner (BWS) serial link requirements and architecture
RF acceleration and transverse damper systems
Microcontrollers, Basics Fundamentals of Designing with Microcontrollers 16 January 2012 Jonathan A. Titus.
Serial Communication Buses: I2C and SPI
2007 IEEE Nuclear Science Symposium (NSS)
Baby-Mind SiPM Front End Electronics
Injectors BLM system: PS Ring installation at EYETS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Ewald Effinger, Bernd Dehning
Firmware Structure Alireza Kokabi Mohsen Khakzad Friday 9 October 2015
DCH FEE 28 chs DCH prototype FEE &
Status of the Beam Phase and Intensity Monitor for LHCb
ECE 3430 – Intro to Microcomputer Systems
Audit of the BLM LHC system
Beam Loss Monitor System Reliability and False Signals
Commissioning and Testing the LHC Beam Interlock System
LHC BLM system: system overview
External Review on LHC Machine Protection, B.Dehning
Front-end electronic system for large area photomultipliers readout
University of Illinois, at Urbana-Champaign
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Test and start‐up procedures
SKIROC status Calice meeting – Kobe – 10/05/2007.
LHC Beam Loss Monitoring System
Status of CC-PC Evaluation Board
LHC BLM Software audit June 2008.
VME64x Digital Acquisition Board
LIU BWS Firmware status
Presentation transcript:

Combiner functionalities BEAM PERMIT CONTROL Beam dump line survey from the Threshold comparators (TC) through P0 daisy chain lines. TESTS Related to the Beam Interlock Related to the HV (use of VME DBT) ANALOG GENERATION Control of the HV with 0-10V Modulation of the HV ANALOG ACQUISITION Monitor of the HV1 : U level & U modulation (separate channels) I level Monitor of the HV2 : same as HV1 VOLTAGES SURVEY VME 5V, 3.3V, ±12V P0 FPS 5V, ±15V HV PS1 & PS2 min/max V & I

Combiner functionalities : Tests BIL Beam Inhibition Lines (test of the lines between DAB and Combiner). Inhibition test for the LBIS (LHC Beam Interlock System - Combiner). HTAT step of the HT. Step of the HT activating a TEST_CFC on the tunnel card. HTLF Low frequency modulation of the HT Modulation of the high tension power supplies an analysis of the running sums. HT monitoring Continuous check of the voltage and current for the 2 power supplies. VME Supplies monitoring Continuous check of the 5V, 3.3V and ±12V. P0 Floating Supplies Continuous check of the 5V and ±15V.

Beam permit decision unit Combiner functionalities Beam permit related parts BLETC Beam Dump (M & UM) Beam permit decision unit P0 Connector Power Supplies Comparators Logic Beam Energy (Serial) Auto-test Bloc CTRV Beam Energy (Serial) BLECS (up) Post-mortem Beam permit P2 Connector Beam info BLECS (down) or BIS FPGA Beam permit Comparators HV1 12 lines HV2 VME PS 4x P0 PS 3x

Combiner functionalities Beam permit related parts Beam Permit from TC (M) Beam Permit decision unit Beam Permit to BIS (MA) Beam Permit from TC (U) Beam Permit to BIS (MB) Beam Permit from BLECS (MA) Beam Permit to BIS (UA) Beam Permit from BLECS (MB) Beam Permit to BIS (UB) Beam Permit from BLECS (UA) Post-mortem or Login Beam Permit from BLECS (UB) Beam Energy Failure Auto-Test Failure Inhibits Time Stamps (orbit counter) FPGA Synchro & Clocks from BOBR

Combiner functionalities Registers structure VME Register VME MUX DEBUG DEBUG Other source Application External memory Interface DEBUG VME Register

Combiner functionalities Auto-test overview BLETC BLECS “Combiner” Control 0-6.8V VME HV (Vin*300) Real excitation signal SURFACE Optical Link BLECF TUNNEL Current BLM chamber HV 0-2000V

Beam permit decision unit Combiner functionalities Auto-test related parts BLETC VME SLAVE Control Registers FPGA P1 & P2 Con. VME MASTER SRAM Control Access SRAM HV1 DAC SPI Auto-test logic P2 Connector Beam permit decision unit ADC HV2 SPI I2C Phase & Gain tracking Signal Generation NV Memory Potentiometers LEDS

Real Excitation Signal Combiner functionalities Auto-test related parts Real Excitation Signal NV Memory 2-PORT RAM 4x128x32bits Phase & Gain tracking Thresholds Decision Unit TC (16 max) 2-PORT RAM 4x128x32bits Phase & Gain tracking Thresholds Decision Unit VME MASTER UNIT 1 TC 2-PORT RAM 4x128x32bits Phase & Gain tracking Thresholds Decision Unit 2-PORT RAM 4x128x32bits Phase & Gain tracking Thresholds Decision Unit Excitation Signal frequency 0.3Hz Sample per period 128 Number of period 3 Number of channel in parallel 16 (1 TC) Total time for one create 3*1/0.3Hz*16TC = 160s The combiner need to access the VME bus every 1/.3Hz*128 = 26ms

Combiner functionalities BEAM PERMIT CONTROL Task : Receive the Beam Dump request From the Threshold Comparators (TC) and transmit it to the Beam Interlock System (BIS) +5V TC N (DAB) COMB 1 Beam permit Comb – Comb Comb - BIS Beam dump TC - TC TC - Comb TC N (DAB) COMB 2 +3.3V TC 1 (DAB) TC 2 (DAB) TC N (DAB) BIS COMBINER 3

Combiner functionalities BEAM PERMIT CONTROL Beam dump lines : From TC to TC From TC to the Combiner Lines from TC board N-1 Lines to TC board N+1 or to the Combiner Lines from FPGA Needs frequency >1MHz to retrig the One shot

Combiner functionalities BEAM PERMIT CONTROL Beam permit lines : From Combiner to Combiner From Combiner to Beam interlock (BIS) Lines to Combiner board, next create or to the BIS Lines from Combiner board N-1 Lines from FPGA of the combiner representing all other sources of beam dump: Voltage survey, non satisfying test, etc

Combiner functionalities BEAM PERMIT CONTROL Beam permit lines Combiner to BIS

Combiner functionalities BEAM PERMIT CONTROL PCB Implementation Beam Dump lines from the TC Beam permit lines from previous combiner to next combiner or BIS

Combiner functionalities ANALOG GENERATION The high voltage power supplies for the ionization chambers are controlled by analog signals 0-10V. There is an analog sum done between the 2 outputs of the DAC, the modulation signal is attenuated with a potentiometer digitally controlled. To the HV supply 0-10V Voltage Control Serial Peripheral Interface From the FPGA 16 bits DAC8532 Analog SUM Offset Modulation Pot digitally Controlled (8 bits steps) Inter Integrated Circuit (I2C) bus to the FPGA

Combiner functionalities ANALOG GENERATION SCHEMATIC

Combiner functionalities ANALOG ACQUISITION The high voltage power supplies have monitor analog output to view the voltage and current levels, there is 1 channel for the current and 2 channels of digitalization for the voltage (offset and low frequency modulation ADC Buffer LP Filter From the HV supply 0-10V Voltage Monitor Serial Peripheral Interface To the FPGA Instrumentation amplifier Inter Integrated Circuit (I2C) bus to the FPGA Offset compensation +15V GAIN Digital pot. Digital pot. +0V From the HV supply 0-10V Current Monitor Buffer LP Filter

Combiner functionalities ANALOG ACQUISITION

Combiner functionalities ANALOG  DIGITAL CONVERSIONS PCB Implementation Analog generation for the 2 HV PS Digitalization of the information coming from the 2 HV power supplies RC filter close to the connector to cut the eventual high frequencies induced by the digital components

Combiner functionalities VOLTAGES SURVEY HV SUPPLY There is a second survey of the HV power supplies level with comparators with fixed level (to be determined) Lower and higher limit for the voltage and lower and higher limit for the current. Resistor calculated for the schematic shown U min = 1333V U max = 1666V

Combiner functionalities VOLTAGES SURVEY VME & P0 floating PS VME POWER SUPPLIES: 5V, 3.3V, ±12V P0 FLOTING POWER SUPPLIES: 5V, ±15V

Combiner functionalities VOLTAGES SURVEY 1) HV SUPPLIES 2) VME & P0 floating PS Survey VME PS Survey P0 floating PS Survey HV PS

Combiner functionalities Commune lines between crates Task : Synchronize the beginning of the auto-test because it’s only the COMB 3 which control the HV PS for all the 3 creates. Other task ? COMB 1 COMB 2 Open drain lines COMB 3 Comb 1 release line Comb 2 release line Comb 2 release line Begin test Wait state

Combiner prototypes and production test FIRST VERSION PROTOTYPE As fast as possible on production with test points as much as possible on the analog lines. => Functional test of these prototypes. EVALUATION modification of the JTAG test developed for the DAB (60% coverage on the DAB) and/or use of a test board & JTAG (90% coverage on the DAB). Visual & functional test for the analog parts. NEW PROTOTYPES TEST DEVELOPMENT PRODUCTION