ARA Production Status Jiwoo Nam. Overall Still Procurement Stage Mechanics under fabrication Delay on DAQ-stack boards, UW/UMD.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Questionnaire Response
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Aloha Proof Module Design Cabled Observatory Mechanical Presentation School of Ocean and Earth Science and Technology February 2006.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
Walls crates cables gas chambers electronics CERN adb.
1 States report for readout system 1.PHENIX readout system overview 2.High speed data link 3.Digital pilot ASIC 4.Schedule Hiroyuki
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Status of NA62 straw electronics Webs Covers Services Readout.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Shore Station1 EFNI H K Shore Station Block diagram Form factor Power setup Special for BARI Special for MILOM Planning Outcome of brainstorm.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
SCHEDULE Nov 1st - Assembly Table Complete
Local Oscillator Generation - Internal.
Production & Maintenance
Track Finder Crate, Backplane and Parts
Downhole system for ARA station1
LCLS Undulator System Production Management
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

ARA Production Status Jiwoo Nam

Overall Still Procurement Stage Mechanics under fabrication Delay on DAQ-stack boards, UW/UMD

DAQ Box Mechanical Structure: Under fabrication, Due 1-2 weeks DAQ-board stacks: (Problematic!) ATRI Board will be ready in a week All PCBs to be sent to OSU with ATRI boards Cables / connectors: RF Connectors: A restricted bidding to be started ASAP, waiting accounting procedures (short delivery time < 1 week): Cables: RF cables ready, Power cables will be ready by 1-2 weeks Filters: Waiting for shipping from UW in 2 weeks All others ready or under purchasing process smoothly

Antennas V-pol production Splitting to three companies by parts to avoid bidding (Wire + Ring + PC tube/Assembly) Should be ready by End of Aug H-pol production Endcap plate (on going 1-2 weeks) Waiting for PC tube from UW Ferrites to be ready by Mid-Late Aug Antenna Cables to be ordered!

LNA Box Housing 4 sample productions from different companies Will choose one of them today. 3 weeks lead time and partial delivery would be available Assembly will be started with spare parts

Optical Modules (TX/RX) Waiting housing and parts from UW (Schedule TBC)

Cables Down Hole RF cables including 200 m power have been ordered (Middle - End of Aug) RF Jumpers for Antenna should be ordered ASAP

Storage/Carriers Antennas/Optical Modules: Customized Foam LNA Box Water proof Pelican Box DAQ Box / Cables To be placed into wooden crates with foams Cables Use delivered creates/boxes?

Manpower NTU Jiwoo, Tsungche, Chiching, Chuanjui, Lice, two undergraduates OSU (Aug 07~20) Eugene and Paul Chiba (Schedule TBD) Aya, Keiichi UH (Schedule TBD) Brendan or Ben UW (Schedule TBC) Mike & Albrecht (short visit around Aug 21) Missing Test Crews: Patrick & one from UCL

Work Environment Two Work Tables Ready (total 4) A soldering bench table ready (total 2) Part Drawer Racks Ready (2x2) Cable Racks to be produced