API 16A June 2017 Specification for Drill-through Equipment

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

API 16 AR Specification for Drill-through Equipment Remanufacturing
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
111 API Tank Standards Update The National Petroleum Management Association PETRO 2013 Hilton Alexandria Mark Center Alexandria, Virginia November 20,
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
1 API 16 AR Specification for Drill- through Equipment Remanufacturing Summer Standards Meeting Communication Jan van Wijk / Chris Johnson API-16AR chairman.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Development of an API Specification for Float Equipment API Spec 10 F.
TG3 17TR8 Liaison Report HPHT Design Flow Chart
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
Use of API 6A vs ISO in marking 6A equipment
API SC6 Work Group Plan for Development of HPHT Flange Design Requirements Date: June 25 th, 2015.
1220 L Street, NW Washington, DC API Standards Development and Pipeline Safety Regulations Restoring Trust in Pipeline Safety Conference.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Supply Chain Management Report for SC 18 January 2013.
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
API SC19 HPHT Template (Proposed as SC19TR1)
Updates from SC18 Summer Meeting
..,../' CJ " · "' ; '..
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
API SC6 Valves and Wellhead Equipment
Optimization of O3 NAAQS Compliance Networks
2016 Exploration & Production Standards Conference Subcommittee 10
API Standard 6X: API/ASME Design Calculations
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
ISO TC64/SC4/WG2 May 2011 status
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
-­,-­, '.-.- ·'·' '·..'·..... '-.: - - (p - C!J " 1.,.c_.. If ( '.. ' " ' ' " ' I.
Use of API 6A vs ISO in marking 6A equipment
API SC-16 task group for Specification 16D
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
API Summer Standardization Conference
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
Ozone Monitoring Issues & Opportunities
API 16 AR Specification for Drill-through Equipment Remanufacturing
February 2007 Note: Source:.
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API 16RCD January 2019 Specification for Rotating Control Devices
API RP 59 Well Control Operations Chair – Tom Proehl
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API 16A June 2017 Specification for Drill-through Equipment 16A Chair: Leonard Childers 16A Vice-Chair Nicolas (Nic) Arteaga

Current Status 16A 4th edition published in April 2017, will become effective October 1, 2017 Errata revision expected in 3rd Qtr, 2017 4th edition Addendum expected in first half of 2018 5th edition revision planned to be released in 2022

Active Work Groups Annex that provides requirements for HPHT equipment - Jim Raney Rating of drill-through equipment that accounts for effects of differential pressure - Chris Johnson Elastomer quality requirements - Bill Carbaugh 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Planned Work Groups Improve shear ram validation (JVW, MW) Close on flow (JVW, MW) Hydraulic connectors (JK) Ram Position Indicators (CJ, MG) Improved Marking longevity (NA) Bolting (HP) Forgings (HP) NACE requirements 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org