Design Constraints For Engineering Projects

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Design Constraints Written Report Format
SESSION 23 Scarcity and Poverty. Outline – Scarcity and Poverty 1. Digital Inequality – A Global View 2. Ethics of Online Labor Amazon Mechanical Turk.
Federal Energy and Environmental Regulation Agencies and Laws
VSE Corporation Proprietary Information
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Emergency Lighting Code Review Presented by Iota Engineering LLC.
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Technology Focus on Physical Infrastructures. Sustainable Development as Integration Industrial Ecology Technology Politics Society Environment Industrial.
Figure 5.1: Inputs, Outputs, and Feedback 1 Transformation (Conversion) Process Energy Materials Labor Capital Information Goods or Services Feedback information.
Design Issues  Patents and copyrights  Standards and liability  Design for Accessibility  Product lifecycle management.
INDUSTRIAL & SYSTEMS ENGINEERING
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
IE Job Description Steve Snelling Industrial Engineer/Process Engineer
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Federal Energy and Environmental Regulation Agencies and Laws
Operations Management
Global Production. Strategy, Production, Logistics  Value chain activities – Production, marketing, logistics, R&D, HR, IS  Production: – physical goods,
Economics of Sustainability When money speaks, nobody cares for the grammar!
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
ENGR 4196 – Senior Design I Question: What is a quantitative design constraint? Objectives: Definitions Functional Constraints Non-Functional Constraints.
Sustainable Consumption and Production
Learning From Companies Who Have Profited From Global Growth: They Have Done It, So Can You! Tony Kayyod Global Ops Now, LLC Global Business.
© Prentice Hall, 2004Business In Action 2eChapter Producing Quality Goods and Services.
From Research Prototype to Production
Welcome to the Lassonde Design Club Promoting Design Skills and Practices.
ESTA Technical Standards Committee Product Stewardship.
LIFE CYCLE THINKING »DO NOT DESIGN PRODUCTS! INSTEAD, DESIGN PRODUCT CYCLES THAT ARE COMPATIBLE WITH SUSTAINABLE DEVELOPMENT.« (PRé Consultants) S10-A1:
ADVANCED MANUFACTURING PROGRAMS BUSINESS AND INDUSTRY LEADERSHIP Team Meeting Wednesday, June 20, :00am-9:30am.
Unit 5 Lesson 3-5 Combined Transportation, Manufacturing, Construction.
Chapter 14 Global Production McGraw-Hill/Irwin Global Business Today, 4/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. Strategy,
“Without the Cost of Waste …”
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
3.00 Understand employment, agency, environmental, energy, and intellectual property law environmental and energy law.
Course of MT- 362 Material Handling Lecture # 3.
Greening the Supply Chain “ Pollution Prevention for Product Systems” John O. Sparks U.S. Environmental Protection Agency Design for the Environment Program.
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
Chapter 2 continued Quality Function Deployment. What is Quality Function Deployment (QFD)? QFD is a tool that translates customer requirements into the.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Defining Design Goals and Design Requirements © 2013 Project Lead The Way, Inc.Engineering Design and Development.
System Design Engineering of Technical Products KKS/ZKMA b_ZKMA/… Pilsen, Czech Republic, 2014.
Product Analysis Tesco Cordless Jug Kettle
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
Studio 5. Need Analysis SPRING 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
6 Modeling, Testing, and Final Outputs Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the.
Chapter 1 Introduction EIN 3390 Manufacturing Processes Summer A, 2012.
Context: Designer Influences The work of a specific artist/designer/chef or Art/Design Movement could be the source of ideas for a new range of products.
Characterization of manufacturing (Wright, Ch1-2) Technology –Production Technology.
Sustainability in the Supply Chain 5 © 2014 Pearson Education, Inc. SUPPLEMENT.
RECIPROCATING COMPRESSORS
Fuel Tank Tumbler Presented by: Jay LeiningerProject Manager Bryan EricksonFrame Design Lead Roberto GarciaAir Design Lead Andrew NiemannAcquisitions Officer.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
1 Product Development Process Requirements Definition (Chap. 3) Conceptual Design (Chap. 3 and 4) Detailed Design (Chap. 5) Manufacturing (Chap. 7) Logistics,
Product Design Factors. Purpose, Function & Content What does it do? Functionality Primary & secondary Quality.
Draft - Enterprise Risk Management Risk Universe
Studio 5. Need Analysis Summer 2017 GE105
Federal Energy and Environmental Regulation Agencies and Laws
ME Spring 2015 Systems Engineering, Part II
Table of Contents: Design
Introduction to New Product Development (Specifications)
Studio 5. Need Analysis Summer 2017 GE105
Studio 5. Need Analysis fall 2016 GE105
World-Views of Simulation
Arch205 building construction Introduction
Facilities Planning and Design Course code:
Quality by Design (QbD)
Studio 5 Need Analysis year 2019 Lecturer: Dr. Raja Rizwan Hussain
Arch205 Materials and building construction I
Design Constraints For Engineering Projects
Presentation transcript:

Design Constraints For Engineering Projects

Product Design Constraints and Requirements Design Engineers must consider a multitude of technical, economic, social, environmental, and political constraints when they design products and processes. There must be clear evidence in your design project that you have addressed the constraints that are relevant to your project.

Effect of Constraints Better Designs Constraint Limits Design Changes

Functional Constraints Overall Geometry – size, width, space, arrangement Motion of parts – type, direction, velocities, acceleration, kinematics Forces involved – load direction, magnitude, load, impact Energy needed – heating, cooling, conversion, pressure Materials to be used – flow, transport, properties Control system – electrical, hydraulic, mechanical, pneumatic Information flow – inputs, outputs, form, display

Safety Constraints Operational – direct, indirect, hazard elimination Human – warnings, training Environmental – land, sea, air, noise, light, radiation, reaction, transport

Quality Constraints Quality assurance – regulations, standards, codes Quality control – inspection, testing, labeling Reliability – design life, failures, statistics

Manufacturing Constraints Production of components – factory limitations, means of production, wastes Purchase of components – supplier quality, reliability, quality control, inspection Assembly – installation, foundations, bolting, welding Transport – material handling, clearance, packaging

Timing Constraints Design schedule – project planning, project control Development schedule – design detailing, compliance tests Production schedule – manufacture, assembly, packing, transport Delivery schedule – delivery date, distribution network, supply chains

Economic Constraints $ Marketing analysis – size of market, distribution, market segments Design costs – design team computing, information retrieval Development costs – design detailing, supplier costs, testing costs Manufacturing cost - tooling, labor, overhead, assembly, inspection Distribution costs - packing, transport, service centers, spare parts, warranty Resources – time, budget, labor, capital, machines, material $

Ergonomic Constraints User needs – type of operation, instructions, warnings Ergonomic design – man-machine relationships, operation, height, layout, comfort, lighting Cybernetic design – controls, layout, clarity, interactions

Ecological Constraints General environmental impact – impact on natural resources, social resources Sustainability – political and commercial consequences, implications for following generations Material selection –solid, liquid, gas, stability, protection, toxicity Working fluid selection – fluid, gas, flammability, toxicity

Aesthetic Constraints Customer appeal – shape, color, texture, form, feel, smell, surprise and delight features Fashion – culture, history, trends Future expectations – rate of change in technology, trends, product families

Life-Cycle Constraints Distribution – means of transport, nature and conditions of dispatch, rules, regulations Operation – quietness, wear, special uses, working environments Maintenance – servicing intervals, inspection, exchange and repair, cleaning, diagnostics Disposal – recycle, scrap

Legal/Ethical Constraints Regulations – OSHA, FAA, FDA Ethics – public safety, health, welfare and integrity Intellectual Property – patents, trademarks, copyrights

Summary Think about CONSTRAINTS Plan for them Put them into the design