20 Chestnut Drive, Mansfield

Slides:



Advertisements
Similar presentations
East Bridgford Project Existing Projects The Green Box Project Adaptation Techniques used within this project:- Natural ventilation is increased by a passive.
Advertisements

New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
Building Drawings and Symbols
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
Improving Energy Efficiency in Traditional Buildings Moses Jenkins Technical Conservation Group.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Presented and arranged by: Jason Vila and Sergio Castillo.
FOR SALE Napier Avenue Blackpool FY4 1PA Large Garage and patio garden PVCu Double Glazing & Gas Central Heating No Chain & close to the Promenade Large.
How to build a two storey house
Curtain Walling System Cladding System Insulation Panels.
DEFECTS PROCEDURE 1 – 5 Robertson Place Yewlands Close Banstead SM7 3DB.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Improving the energy efficiency of buildings in the Dartmouth Park Conservation Area Review of questionnaire responses (February 2012)
Foundation Plan Layout
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
Unit 6/P6 – Timber Frame Construction Name ________________
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
FOR SALE Flat F, Lincoln Court 143 Hornby Road Blackpool FY1 4JG Two bedrooms Garage to the rear PVCu double glazing Price: £69,950 Purpose built, self.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Session 1: Identifying Construction Drawings and Drawing Components.
Fundamentals of Construction
External Walls Carl James.
Timber Framed Buildings
WALL Barrios Laura Bigott Dairet
Passive Solar Home Design Project
Table (3.1)- the averages of the 10 models costs
Prepared by Frank Cooney B.Arch MRIA
Energy Efficiency for Ashton Hayes
10 years in a “light green” house
SURFACE FINISH.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
DrawING exterior elevations
DO’s and DON’Ts of toilet construction
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
HANDICAPPED PEOPLE RESIDENT
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Progress Report January 2016
FINISHES (FLOOR, WALL & CEILING)
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
DO’s and DON’Ts of toilet construction
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
DO’s and DON’Ts of toilet construction
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Wbs, CONTRACTORS & GIVING A BID
Value of contract: Length of contract: Contract start date:
Company Number VAT Number
Value of contract: Length of contract: Contract start date:
Presentation transcript:

20 Chestnut Drive, Mansfield Value of contract: Length of contract: Contract start date: Completion date: £375,000 12 months August 2010 September 2011 Works/services provided: Strategic Demolition of the existing dwelling Insitu Concrete foundations and floor slab Masonry Structure, clay facing brickwork with elements of acrylic render finish. Traditional Timber Roof Structure , five dormer windows, with concrete tile finish. Complete Electrical installation including energy efficient “LED” lighting throughout Design & Installation of gas fired central heating. Including elements of underfloor heating. Rainwater harvesting and distribution of non-potable water to WC’s. Porcelain tiling to floors & walls Solid hardwood “Parquet” flooring Bespoke internal joinery: - Staircase, doors moulds, External paving and landscaping Detailed description of contract: Partial demolition of existing chalet bungalow , circa 1963, and new-build construction of four bedroom bespoke residence complete with double garage and feature glazing to the rear elevation. Particular challenges to be overcome: Contact details: Stabilisation of the existing structure to be retained, design development of the traditional timber roof to include “glu-lam” beams thus overcoming retro fit logistics Careful removal and sympathetic reinstallation of certain elements in order to retain an authentic appearance