Welcome.

Slides:



Advertisements
Similar presentations
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
Advertisements

Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Maryland State Highway Administration Office of Structures Maryland State Highway Administration Office of Structures West Nursery Road over MD 295 (Baltimore-
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Santa Maria River Bridges Widening. Project Location.
U.S. 33 Northern Connector Alternative
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
November 14, 2014 District Construction Season.
Welcome.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
November 20, 2013 District Construction Season.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
DISTRICT D and E PRESENTATION Wednesday, April 13, 2011 Hollenback Fire Station.
Signal Optimization Study Community Development Department.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Transportation Report
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Local land-use and transportation
The Gainesville Area Chamber Infrastructure Investment Initiative
Transportation Engineering Business Development Workshop Department M
Interstate 15 North 8/17/2015 Update
Pensacola Bay Bridge Replacement Design Build
SR 2108-A13 – Forbes Avenue Corridor Improvements
Chapin Town Hall Meeting
UTILITY DESIGN SERVICES
District 3 Complete Streets Projects
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Bill Good Chief Operations Officer
Work Zone Safety Review – District 1 - Duluth
21st Century School Buildings Plan
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
DISTRICT 1 ADVERTISED PROJECTS
Citrus Park Drive Extension
Transportation Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
Mr. Greg Slater, Administrator
Maricopa County Transportation Improvement Program
TRAFFIC SIGN REDUCTION ACTIVITIES IN JEFFERSON PARISH
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
PROJ. 566(17) LOR PID MAJOR WIDENING
projects update ATLANTA district
District Construction Season
Construction Management & Engineering
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
District Five Upcoming Projects
Commissioners Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Monterey County Project Report for Measure X Expenditures
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
21st Century School Buildings Plan
Presentation transcript:

Welcome

Fall 2016 DISTRICT 4 CONSTRUCTION PROGRAM

District 4 Construction Wendy Wolcott District Engineer Jesse Free Assistant District Engineer Bruce Cain Area Engineer Thomas Briggs Area Engineer Mitu Dalwadi Area Engineer Wayne Chin Office Engineer Judy Wright Administrative Assistant James Otterbein Change Order Facilitator Craig Barnes Constructability Reviewer

BA0135180 $5,000,001 - $10,000,000 EST AD 12/20/16 EST BID 01/26/17 EST NTP 04/03/17 Bridge Replacement – CO2500(Crosby Road) Bridge 0312500 over I-695 Investment in Highways and Bridges (IHB)

BA0445177 $2,500,001 - $5,000,000 EST AD 02/07/17 EST BID 03/16/17 EST NTP 05/22/17 Safety & Resurface – US 1 from I-695 to Still Meadow Road (IHB)

BA0805180 $5,000,001 - $10,000,000 EST AD 01/10/17 EST BID 02/16/17 EST NTP 07/24/17 Bridge Replacement – MD 137 (Mt. Carmel Road) Bridge 03050 over I-83 (IHB)

BA1285177 $5,000,001 - $10,000,000 EST AD 11/22/16 EST BID 01/05/17 EST NTP 03/06/17 Safety & Resurface – I-83NB from Shawan Road to Mt. Carmel Road

BA1425277 $1,000,001 - $2,500,000 EST AD 04/18/17 EST BID 05/25/17 EST NTP 07/31/17 Safety & Resurface – MD 140 from Milford Mill Road to the Baltimore City/County Line (IHB)

BA2635277 $5,000,001 - $10,000,000 EST AD 01/24/17 EST BID 03/02/17 EST NTP 05/08/17 Safety & Resurface – I-95 from Baltimore County/City Line to US 1

BA5385177 $10,000,001 - $20,000,000 EST AD 11/15/16 EST BID 01/05/17 EST NTP 02/27/17 Safety, Resurface & Waterline Replacement– MD 45 from North of Padonia Road to Wight Avenue (IHB)

BA7205277 $2,500,001 - $5,000,000 EST AD 11/22/16 EST BID 01/05/17 EST NTP 03/06/17 Safety & Resurface – I-695 from Greenspring Avenue to Falls Road

BA7295270 $2,500,001 - $5,000,000 EST AD 11/29/16 EST BID 01/05/17 EST NTP 03/13/17 Design Build Project If you are on the short list you know, if you are not on the short list you know Widen & Resurface – MD 140 South of Garrison View Road to North of Painters Mill Road (Breakout) (IHB)

HA5235130 $100,001 - $500,000 EST AD 12/06/16 EST BID 01/12/17 EST NTP 03/20/17 This project includes: 90 foot wide bridge Requires a Pedestrian Bridge – location has been set to the north side of bridge Next phase will be to build to northern part of the bridge Shift traffic to the new bridge Demo the existing bridge Build the new bridge roughly in the foot print of the old SHA has include the City of Frederick’s improvements on Motter Ave from the western abutment up to Thomas Johnson Drive Widen & Resurface – MD 147 at Connolly Road

THANK YOU